| 1 | Supply of empty cement bags in good condition. [Ref : P.W.D.(Rds.), Page -325, Item-18,28] |
| 2 | Labour for filling up cement bags with sand and placing them up in position including tying and sewing mouth (cost of thread included) and all incidental charges complete but excluding cost of sand and sunny bags.[Ref : P.W.D.(Rds.), Page -325, Item-18,29] |
| 3 | Supply of silver sand. [Ref : P.W.D. (Bld.), Page – 300, Item-6.(d )] |
| 4 | Cleaning rubbish, sludge, weeds scum, liquidearth, mud etc. from conduits of any dia. above900 mm and from any depth, etc. by mathor labourafter removing concrete slab / manhole cover etc.without damaging the same and refixing the sameproperly after cleaning as necessary and removingthe sludge etc. by using iron pans, buckets includingall labour, tools & plants including expulsion ofimpure / inflammable / asphyxiating gases from thedrains etc. and removing the spoils in dry conditionand disposing the same by truck beyond the areaof Municipal Corporation / Municipality / NotifiedArea Authority / Industrial Township Authority etc.for such disposal including the cost of loading,unloading, transportation and making arrangementof necessary land for disposal, spreading andleveling as necessary etc. and cleaning the roadside in all respects, complete as per direction of theEngineer- in-Charge. (Land for disposal to bearranged by the contractor).(Payment will be made on the basis of actual stackmeasurment of spoils in dry condition at roadside) [Ref : U.D.(S&P), Page-17, It. – 17] |
| 5 | Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc. from conduits of any dia. upto 900 mm and from any depth, etc. by mathor labour after removing concrete slab / manhole cover etc. without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc. by using iron pans, buckets including all labour, tools & plants including expulsion of impure / inflammable / asphyxiating gases from the drains etc. and removing the spoils in dry condition and disposing the same by truck beyond the area of Municipal Corporation / Municipality / Notified Area Authority / Industrial Township Authority etc. for such disposal including the cost of loading, unloading, transportation and making arrangement of necessary land for disposal, spreading and leveling as necessary etc. and cleaning the road side in all respects, complete as per direction of the Engineer- in-Charge. (Land for disposal to be arranged by the contractor). (Payment will be made on the basis of actual stack measurment of spoils in dry condition at roadside) [Ref : U.D.(S&P), Page-17, It. – 18] |
| 6 | Dewatering by pumps including all leads, lifts and making all arrangements of disposal , where continuous flow of water from a source other than natural or ground water in encountered in case of emergency maintenance works related to leakage, breakage and making wet connections. [Ref : UDMA. (Water supply) 18-19, Page-24, It. -7.2] |
| 7 | Supplying, fitting and fixing in position FRP/GRP/COMPOSITE UV stabilizer Gully Pit Cover with high abrasion surface of 7mm top thicknes, density of 2KG/m³ of approved make with rim of approved make (Heavy type) (iii) 10 M.T. Gully pit cover (yard gully) with arrangement for opening of sizeFrame Clear Opening 640 mm X 240 mm.PWD (S&P), Page-94, Item-11(iii) |
| 8 | Add 18% GST |
| 9 | Add 1% Cess Please Enable Macros to View BoQ information |