| 1 | Supply ,Installation, testing and commissioning of 250 kVA 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Copper wound , and with LV Cable Box having detachable Aluminium Gland plate |
| 2 | Supply ,Installation, testing and commissioning of ST poles 9 m long ST-410 SP -33 with base plate & cap weight 164kg |
| 3 | Supply ,Installation, testing and commissioning of LT Distribution Box for 250 kVA DTR with 400 Amp MCCB 3P 36 kA for incomer & 200 Amp MCCB 3P 16 kA 1 No. and 160 Amp MCCB 3P 16 kA 2 No.s for Outgoing Circuits |
| 4 | Supply ,Installation, testing and commissioning of 11 kV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type |
| 5 | Supply ,Installation, testing and commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type |
| 6 | Supply ,Installation, testing and commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 7 | Supply ,laying, testing and commissioning of 185 mm² Single-Core Cable,1.1k V Grade, XLPE un armoured FRLS type |
| 8 | Providing and fixing of GI Channel/Angle/Flat of sizes including clamps |
| 9 | Providing and fixing of Galvinized Nuts and Bolts. |
| 10 | Providing and fixing Spike Earthing Rod 20mm 2,5 Mtr long with GI strip (25x3)mm |
| 11 | Providing and fixing11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 12 | Supply and painting of each Pole 1 coat red oxide paint and 2 coats of aluminium paint (@ 1 ltr/pole red oxide paint and 1 ltr/pole aluminium paint) |
| 13 | Providing and fixingGI Barbed Wire for Anti Climbing |
| 14 | Providing and fixingDanger Board/Plate with Clamps |
| 15 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 16 | Supply ,Installation, testing and commissioning of ST poles 8m long ST-410 SP -15 with base plate & cap weight 119kg |
| 17 | Supply ,Laying,Testing,Stringing of 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 25 + 1 x 95 insulated) mm² XLPE (1.1kV, 3+1 C, Al) |
| 18 | Providing and fixing of Suspension/Tension Clamp with eye hook |
| 19 | Providing and fixing of wedge connectors/PG Clamps |
| 20 | Providing and fixing of insulating piercing connectors |
| 21 | Providing, laying of Cement bottoming 1:2:4 mix as per Standards 0.48 cum /pole (9 Mtr ST Poles) |
| 22 | Providing, laying of Cement bottoming 1:2:4 mix as per Standards 0.40 cum / pole for ( 8 Mtr ST Pole) |
| 23 | Providing and fixing of Sundry items like aluminium lugs, Jumpers, binding Tape, |
| 24 | Providing and fixing of Pre and Post Geo Tagged Photograph Please Enable Macros to View BoQ information |