| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: all kinds of soil |
| 2 | Supplying and laying of Plums/Dry stone soling hand packed tightly including ramming, watering and filling of interstices including all carriages complete. |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs, breaks in floors and walls |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) complete all inclusive. |
| 7 | Reinforced concrete work in beams,suspended floors,columns,roofs having slope upto 15degree ,landings,balconies,shelves,chajjas,lintels,bands,plain window sills,staircases ans spiral stair cases upto floor v level incl. Curing but excluding the cost of centring,shuttering,finishing, with 1:1.5:3 (1,cement:1.5 coarse sand,3: graded stone aggregates 20mm nominal size) including all Carriages and head loads involved |
| 8 | 12mm Cement plaster of mix: 1:6 ( 1 cement : 6 fine sand) complete all inclusive. |
| 9 | Carriage of Stone Aggregates 20mm size from 35Km, including Head load of 100m |
| 10 | Removal and refixing of 50mm thick interlocking tiles. |
| 11 | P/F of 50mm thick interlocking tiles over 40mm dense sand cushion |
| 12 | Dismentalling of existing RCC Slab and Abutments including clearance of debris complete job |
| 13 | Installation of Sign board and photographs of size 125mm x200mm pre- execution, during execution and post completion. (3 No’s of each) |
| 14 | Contingencies @2.5% Please Enable Macros to View BoQ information |