| 1 | Clearing and taking away fallen debris/excess mud along the compound wall, including removing/dismantling the loose masonry stones in superstructure, foundation, etc. dismantling of temporary GI Sheets, angles, etc . Transporting and dumping the debris within a lead of 5.00KM as directed. The rate include hiring of JCB and Trucks, loading unloading and levelling, etc. complete. All labour, material and tool etc complete. |
| 2 | Excavation in dense or hard soil/murrum etc. including removal of obstructions such as small trees, vegetation etc. and removal of excavated material upto a lead of 50m and a lift of 1.5m including refilling foundation trenches. All labour and material etc. complete. |
| 3 | Constructing masonry in foundation and plinth using precast cement concrete solid blocks having a crushing strength of not less than 35kg./cm2 (28 days curing) with a mix not leaner than (1:5:10) in cement mortar (1:6) including providing specially moulded blocks at junctions & corners, curing, dismantling/removing loose/ soft masonry etc. All tools, plants labour & material etc. complete. |
| 4 | Constructing masonry in superstructure using precast cement concrete solid blocks having a crushing strength of not less than 35kg./cm2 (28 days curing) with a mix not leaner than (1:5:10) in cement mortar (1:6) including providing specially moulded blocks at junctions & corners, curing, scaffolding, dismantling/removing of loose/ soft masonry etc. All tools, plants labour & material etc. complete. |
| 5 | Supplying and providing approved (as per existing) concertina wire coil fencing 610mm diameter with26/27 SWG barbed concertina including removing of old damaged concertina, cutting welding with small MS fixtures for support. All tools, plants, labour & materials tools & plant etc. complete. |
| 6 | Supplying and fixing woven plain G.I wire fencing (chain link fencing of 75mm (3\\") x 8 SWG mesh fixed to ISA angles including providing 2 nos 16mm diameter M.S bars at top & bottom of fencing, welding 16mm diameter rods to angles or welding to the angles with small MS fixtures for support, tying with binding wire, staples, painting M.S bars/ MS fixtures with two coats of synthetic enamel paint over a coat of red lead primer ,rate include removing old damaged chainlinked fencing etc. but excluding the cost of angles. All tools, plants, labour & material etc. complete. |
| 7 | Erecting & fabricating old rail posts of 60 lbs/yds including cutting, hoisting, welding and painting two coats of synthetic enamel paint over a coat of red oxide zinc chromite primer. (approx. qty. = 210 Qt.) |
| 8 | Providing coping/concrete over compound wall etc. of cement concrete (1:2:4) mix using 20mm black trap stone metal out of quarried boulders as coarse aggregate including mixing, depositing, side shuttering, consolidating, levelling, curing, dismantling of old concrete, Plastering the surface if required, making the good etc. All labour and material, tools & plant etc. complete. |
| 9 | Supplying & erecting in position structural steel work in single section i.e. ‘Y’ shape angles (light sections less than 34 kg./m) incl. Cutting, welding, hoisting, fixing in position and cleaning the surface, painting two coats of approved quality synthetic enamel paint of approved colour/ shade over a coat of red oxide zinc chromite primer etc. All tools, plants, labour & materials tools & plant etc. complete. |
| 10 | Labour supply with all tools and equipment as required for the execution (Mazdoor) |
| 11 | Hire and operation of Truck, to be deployed at the discretion of the department, for transportation of concrete poles, rails, excavated / dismantled material for levelling purpose etc., as directed including, operator and consumable charges complete. All tools & plant etc. complete.Note: 1(one) day = 8 working hours Please Enable Macros to View BoQ information |