| 1 | Side shuttering including propping etc. complete (to achieve finish F 2 for Retaining wall, counter fort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. |
| 2 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. |
| 3 | Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and removing |
| 4 | Supplying of M.S. reinforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786) |
| 5 | Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required. In cement mortar |
| 6 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary |
| 7 | Cost of Diesel |
| 8 | Hydraulic excavator/ loader like JCB/ Poclain, Hitachi etc. with all accessories (for actual site working, idle period) having bucket capacity upto 0.40 cum Hire charges without diesel but with operation staff M.Oil, spares and lubricants (in Rs.) without GST / profit |
| 9 | Hydraulic excavator/ loader like JCB/ Poclain, Hitachi etc. with all accessories (for actual site working, idle period) having bucket capacity above 0.40 and upto 0.75 cum Hire charges without diesel but with operation staff M.Oil, spares and lubricants (in Rs.) without GST / profit |
| 10 | Dumpers 7-10 tonne capacity Hire charges without diesel but with operation staff M.Oil, spares and lubricants (in Rs.) without GST / profit |
| 11 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. (c) Hard soil mixed with Kankar / boulders, Morrum |
| 12 | Removal of slit/soil/earth, sand, pebbles, Malba, debris, rubbish, stone pebbles & obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m and lift upto 1.5 m with proper dressing on canal bed complete in all respect (c) For depth above 30cm. |
| 13 | Removal of slit/soil/earth, sand, pebbles, Malba, debris, rubbish, stone pebbles and obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m and lift upto 1.5 m with proper dressing on canal bed complete in all respect. (d) Extra on item 5.7.3 only if silt clearance is done under water and mud. |
| 14 | Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm |
| 15 | Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm |
| 16 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm Please Enable Macros to View BoQ information |