| 1 | REPAIRING OF PUMP HOUSE AND STAFF QUARTER |
| 2 | Repairing and painting of all Existing Pump House including all material labour t&p etc completion of work as per direction of engineer incharge. |
| 3 | Repairing and painting of Existing Staff Quarter including all material labour t&p etc completion of work as per direction of engineer incharge. |
| 4 | Construction of Artificial Recharging of Ground water through roof top rain water of pump house , by pas chamber and over flow of OHT including all material, labour,T&P etc.required for proper completion of work in the direction of Engineer in charge. |
| 5 | Construction of Master control room(MCS) as per Structural Design Drawing of relevant seismic Zone including cost of soil testing , Structural designing as per direction of Engineer-in-charge. |
| 6 | STAFF QUARTER |
| 7 | Provide all material, labour, T&P Complete and soil Testing, Structural Design Drawing as per relevant seismic Zone Construction of a single room set staff Quarter as per endicated elevation and plan. |
| 8 | PUMP HOUSE |
| 9 | Provide all material, labour, T&P Complete Pump House cum chlorination room size (3.60 m x 3.00 m x 3.00 m) and (1.8m x 2.6m x 3.00 m) as per Structural Design Drawing of relevant seismic Zone including cost of soil testing , Structural designing as per direction of Engineer-in-charge. |
| 10 | Construction of Bye Pass Chamber including all material labour t&p etc completion of work as per direction of engineer incharge. |
| 11 | RISING MAIN |
| 12 | Supply of following sizes (D.I.) pipes for rising main conforming to latest/relevant I.S. 8329/2000 Specifications with all jointing materials such as specials conforming to latest/relevant I.S. specifications suitable for D.I pipes as per IS-1239 /2000 and IS 8329/2000 or their latest amendment including F.O.R. destination and all taxes and insurance etc. with loading unloading but excluding the cost of trenches. All complete as per instructions of Engineer -in - charge. |
| 13 | 150 mm dia DI Pipe K-9 (Rising Main) |
| 14 | Carting of following sizes of Rising main pipes and specials fittings etc. to the site of work. Lowering the same into trenches and laying to true alignment and gradient including testing of pipe lines, cutting of pipes for making joints. |
| 15 | 150 mm dia DI Pipe K-9 (Rising Main) |
| 16 | Excavation of earth in ordinary soil (loam clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour T&P etc complete as per instructions of Engineer -in -charge. (OD+600)mm |
| 17 | In ordinary soil |
| 18 | Design and construct Thrust Block made in R.C.C. with cement, coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3, for pipe line, including supply of MS reinforcement wrought to required shape as necessary ,its bending, fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials, labour, T & P etc. required for proper completion of the work and as per specifications for RCC work as per instructions of Engineer -in -charge. |
| 19 | RCC thrust Block for 125 to 200 mm dia size (0.9x0.9x0.9m) |
| 20 | DISTRIBUTION SYSTEM |
| 21 | Excavation of earth in ordinary soil (loam clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour T&P etc complete as per instructions of Engineer -in -charge. (OD+600)mm |
| 22 | In ordinary soil |
| 23 | Supply of following sizes HDPE Pipe PN-6: Class PE-100 for distribution system conforming to latest/ relevant I.S. 4984/1995 Specifications with all jointing materials and specials conforming to latest / relevant I.S. specifications including F.O.R. destination and all taxes and insurance etc. with loading unloading but excluding the cost of trenches all complete as per instructions of Engineer -in - charge. |
| 24 | 90 mm dia HDPE Pipe PN-6, PE:100 |
| 25 | 110 mm dia HDPE Pipe PN-6, PE:100 |
| 26 | 140 mm dia HDPE Pipe PN-6, PE:100 |
| 27 | 160 mm dia HDPE Pipe PN-6, PE:100 |
| 28 | 200 mm dia HDPE Pipe PN-6, PE:100 |
| 29 | 250 mm dia DI Pipe K-7 |
| 30 | 300 mm dia DI Pipe K-7 |
| 31 | 350 mm dia DI Pipe K-7 |
| 32 | Carting of following sizes of of pipes and specials fittings etc. to the site of work. Lowering the same into trenches and laying to true alignment and gradient including testing of pipe lines, cutting of pipes for making joints. |
| 33 | 90 mm dia HDPE Pipe PN-6, PE:100 |
| 34 | 110 mm dia HDPE Pipe PN-6, PE:100 |
| 35 | 140 mm dia HDPE Pipe PN-6, PE:100 |
| 36 | 160 mm dia HDPE Pipe PN-6, PE:100 |
| 37 | 200 mm dia HDPE Pipe PN-6, PE:100 |
| 38 | 250 mm dia DI Pipe K-7 |
| 39 | 300 mm dia DI Pipe K-7 |
| 40 | 350 mm dia DI Pipe K-7 |
| 41 | Supplying & Laying the following dia DI butterfly /sluice valves, class I, working pressure 10 Kg/cm2 confirming to IS: 780/1969 or its latest amendments, including valve fittings & Dismantling Joints as per requirement F.O.R. destination, and lowering them into the already prepared trenches, complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge. |
| 42 | Sluice valve |
| 43 | 100 mm dia |
| 44 | 150 mm dia |
| 45 | 200 mm dia |
| 46 | 250 mm dia |
| 47 | 300 mm dia |
| 48 | 350 mm dia |
| 49 | Scoure valve |
| 50 | 80 mm dia |
| 51 | Supply & Laying of single / double ball type air valve conforming to latest/relevent I.S. specifications including all taxes and insurance, complete (including supply of jointing materials and Valve fittings etc complete) as per instructions of Engineer. |
| 52 | Supply & Laying of under ground sluice value type fire hydrant consisting of 80 mm dia sluice valve, 80mm dia tail pieces, 80mm dia duck foot bend and 80 mm dia standard makes iron coupling with cap and etc. complete conforming to latest/relevent I.S. specifications including all taxes and insurance up to site of work (including supply of jointing materials and Valve fittings etc. complete as per instructions of Engineer ‐in ‐ charge. |
| 53 | 80 mm |
| 54 | Supply of all materials, labour, T&P etc. and construction of sluice valve/scour valve chamber as per type design. |
| 55 | Surface box type |
| 56 | Masonry type |
| 57 | Air Valve |
| 58 | Fire Hydrent |
| 59 | RCC Thrust Block for 80 mm to 100 mm dia . Size (0.6 x 0.6 x 0.6 m) |
| 60 | RCC Thrust Block for 125 mm to 200 mm dia . Size (0.9 x 0.9 x 0.9 m) |
| 61 | RCC Thrust Block for 250 mm to 500 mm dia . Size (1.25 x 1.25 x 1.0 m) |
| 62 | Dismantling of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. and also including temporary reinstatement of road by old materials. |
| 63 | Brick Road |
| 64 | Bituminous Road |
| 65 | CC Road |
| 66 | Inter locking tile Road |
| 67 | Permanent reinstatement of following type of road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. |
| 68 | Brick Road 60% new brick |
| 69 | Bituminous Road |
| 70 | CC Road |
| 71 | Inter locking tile Road 50% new |
| 72 | Provision for crossing of culver, Nalas and Road for laying of pipe line including necessary specials with Covering of DI Pipe, T&P and arrangement of diversion of water , baricating etc required with dismantling of drain and reconstruction of same as per type design of the existing drain . |
| 73 | Culvert Crossing (2 - 3.5 MTR) |
| 74 | Nala/Drain |
| 75 | Road Crossing 3.5-7.0 MTR |
| 76 | Road Crossing 2.0-3.5 MTR |
| 77 | Repairing of Drain/ public ramp/ other miscellaneous structures which are coming in alignment of pipe line and damaged during the laying of pipe line including supply of all materials, labour T&P etc. required for proper completion of work. |
| 78 | Brick masonary in cement mortar 1:4 |
| 79 | 12 mm thick plaster in cement mortar 1:4 |
| 80 | Making house connection (with dismaintling and reinstatement of all types of roads on different dia of pipe ) with 20mm(OD) HDPE /AC/DI pipe main with Supply,Carting ,laying , jointing and fixing of the 15 mm (OD) G.I. pipe ,I.S.I. Mark Gunmetal Ferrul , I.S.I. Mark saddle/clamp of required size, C.I. bib kock of approved quality, J-Hook or M.S.U-clamp, 23cmX23cmX23cm C.C grouting of unsupported G.I. pipe all connection in inside the house and support on wall with suitable clamp as per directed by engineer-in charge including cost of all jointing material, specials, labour, testing and T&P etc. complete |
| 81 | OVER HEAD TANK |
| 82 | Reparing and painting of Existing over head tank and releated component (Brace, column,bottom dome, top dome copleteby guniting mathod)and supply of staire case gate ,aluminium stair in water containar ,railing stand post GI pipe ,repleacing of old sluice valve ,repair of cracks on concrete surfacewith all safty equipment etc including all material labour t&p etc completion of work as per direction of engineer incharge. |
| 83 | Zone -01 650KL/ 16m staging (Existing) |
| 84 | Zone -02 450KL/ 18m staging (Existing) |
| 85 | Supply of all materials labour T&P etc. for complete construction of R.C.C. Over Head Tank following type Capacity and staging above ground level with main components, including cost of soil testing and assuming bearing capacity of soil as 8 MT, with supply of design and drawings.All the water retaining components of OHT shall be casted in M-30 concrete and minimum grade of concrete of foundation and staging should be M-25 with approved cement, coarse sand and stone grit as per I.S. 11682 and I.S.456. Seismic effects and wind load should be taken into consideration as per I.S. 1893 for earthquake resistance and I.S. 875 part-III for wind load on structure and including 1M wide RCC staircase, 1 m wide R.C.C. M30 balcony, M.S. ladder made of 50x50x6 mm angle section and 20mm plain M.S. bars with hand rails of 20mm medium class G.I. pipes, One aluminum ladder inside the tank from top dome to bottom dome, railing with 20mm dia medium class G.I.pipe (in 3 rows) on both sides of stair case,bolcony and top dome, supported on 50x50x6mm M.S. angle section, spaced at intervals not more than 1.5m, Proper ventilator at top dome in circular shape of 1.2 m dia, Water level indicator fabricated with sensor connecting to automation, Lightening conductor as per I.S.S.2309 or its latest amendments of latest electricity rules, consisting of proper elevation rod with 5 or more fork points as prescribed in ISS 2309-1969 and ISS 3013-1966, C.I. manhole of min 60x60cm size with locking arrangement, Supply, fixing, jointing of C.I.D/F Pipes of appropriate size with C.I.D/F specials conforming to IS 8329/2000 as vertical pipes for inlet, outlet, overflow and washout as per latest / relevant I.S. specifications with all jointing materials for proper completion of work, Supply and Fixing of appropriate size manually operated D/F Sluice Valve / Butter Fly Valves as per ISS 700/1969 or its latest amendments class “A” working pressure 10 Kg/cm2, Construction of bed blocks in 1:2:4 PCC with cement, coarse sand and approved stone grit , Construction of washout / overflow chamber and chambers for sluice / butter fly valves as per departmental type design and drawing, Supply of 200 mm dia PVC pipe as per I.S.-4985/2000 for disposal of water from overflow and washout chamber to suitable point outside the water works compound.Supplyand fixing of 1.8 m hight M.S. Gate in staire case at 2nd fligth as per direction of engineer -in-charge. Painting of all concrete surface and steel pipe works with water based exterior paint of approved make and quality as mentioned in tender document over one priming coat on new work with two coats, to give an even shade and anticorrosive paints including prepration of surface &supply of all matrials labour T&P etc. required for proper completion of the work. AS PER DIRECTION OF EIC |
| 86 | (i) ZONE-3 - 1200KL Capacity 24 M staging |
| 87 | (ii) ZONE-4 - 700KL Capacity 24 M staging |
| 88 | Reparing of Existing Boundary wall |
| 89 | Repairing and painting of Existing boundary wall with fixing 50x50x6mm angle iron work 2m C/C and barbed wire fencing to posts in four row including all material labour t&p etc completion of work as per direction of engineer incharge. |
| 90 | Provision of approch road with P.c.c Interlocking solling with colured pcc moulded bricks over 8mm thick 1:6:12 p.c.c. filling the joints with local sand including all material, labour,T&P etc.required for proper completion of work . |
| 91 | Construction of 300 x 300 mm size Drain including all material, labour,T&P etc.required for proper completion of work in the direction of Engineer in charge. |
| 92 | Provision of Solar light with panel in cammpus including all material labour t&p etc completion of work as per direction of engineer incharge. |
| 93 | provison of land escaping aboriculture in all zone campus (Pump house and water works) as per direction of Engineer in charge. |
| 94 | Provide all materials , labour, T&P etc.required for proper completion of works including leveling dressing exvavation and filling of earth where necessary for development of water works site including carriage of earth from distance of about 8 km. |
| 95 | Construction of boundary wall |
| 96 | Provide all material, labour, T&P construction of boundary wall as per Structural Design Drawing of relevant seismic Zone including cost of soil testing , Structural designing as per direction of Engineer-in-charge. |
| 97 | Supply and fixing of 3.6 m wide gate including construction of pillars as per departmental type design including if all material, labour,T&P etc.required for proper completion of work |
| 98 | Provision of approch road with P.c.c Interlocking solling with colured pcc moulded bricks over 8mm thick 1:6:12 p.c.c. filling the joints with local sand including all material, labour,T&P etc.required for proper completion of work . |
| 99 | Construction of 300 x 300 mm size Drain including all material, labour,T&P etc.required for proper completion of work in the direction of Engineer in charge. |
| 100 | provison of land escaping aboriculture in campus (Pump house and water works) as per direction of Engineer in charge. |
| 101 | zone-3 & 4 |
| 102 | Provide all materials , labour, T&P etc.required for proper completion of works including leveling dressing exvavation and filling of earth where necessary for development of water works site including carriage of earth from distance of about 8 km. |
| 103 | E/M Works |
| 104 | ZONE-I |
| 105 | Instrumentation Item of Old Existing Tubewell |
| 106 | SITC of Automatic chlorination system SCADA Compatable chlorinating system. |
| 107 | 150mm dia 3M long heavy duty column pipe same as above (Extra/Spare) |
| 108 | Supply & Erection of Servo Stabilizer of 40 KVA |
| 109 | CE / UL certified Intelligent smart energy meter |
| 110 | Motor Operated Actuator with Sluice Valve (150mm dia) |
| 111 | CE / UL certified Electromagnetic flowmeter of size:150mm |
| 112 | Soft Starter with Rs485 port-400 Class. |
| 113 | Auto phase reversal unit with inbuilt time delay & enclousre (confirm to IEC: 60947-1 & IEC: 60947-b-1) |
| 114 | CE / UL certified Hydrostatatic type sub soil water level transmitter |
| 115 | CE / UL certified Pressure Transmitter |
| 116 | Automation of Old Existing Tubewell |
| 117 | CE & UL approved manufacturer’s RTU/ PLC in IP 65 encloser suitable to communicate with GSM based modem unit with CPU and power supply with analog and digital parameter and features as specified, one for each tubewell to store and transmit data on GSM backbone. RTU/PLC designed with logic to transfer data at multiple stations |
| 118 | G.S.M./G.P.R.S. based wireless communication with 4G Modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations, all accessories included with signal enhancer anteena made for pumping plant |
| 119 | CE / UL certified Surge protector for control panel |
| 120 | CE/UL certified 7\\" HMI touch screen suitable to communicate with PLC/RTU for local display & control of process parameters. |
| 121 | Complete cabling for all equipments at pumphouse |
| 122 | Control panel with IP 54 protection, industrial grade fro all equipments (separate for control (24V) and power equipments. |
| 123 | Installation, commissioning & testing |
| 124 | Trial run for 3 month period for one tubewell. |
| 125 | Instrumentation of OHT DMA-1 & DMA-2 |
| 126 | CE/UL Certified Radar type level Transmitter for OHT |
| 127 | Flow control Valve 200 mm size |
| 128 | Motor operated Actuator with Sluice valve 200mm Size |
| 129 | Electromagnetic Flowmeter of 200mm Size |
| 130 | CE / UL certified Pressure Transmitter |
| 131 | Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency.ii- Single parameter system ready to operate to measure free or total chlorineiii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinnediv- Battery and other accessories for power back for continous operation. |
| 132 | Master control station (MCS) |
| 133 | SCADA DISPLAY |
| 134 | CE/UL & BIS Certified industrial grade LED MONITOR with latest configuration as per specification. |
| 135 | (i) 65'' LED MONITOR With latest configuration |
| 136 | Desktop/PC with i5/i7 prosessor for as per spec mentioned in technical bid document. |
| 137 | CE/UL Cerfified 5 KVA UPS with batteries as per spec mentioned in technical bid document. |
| 138 | Full development version of reqrired TAGS SCADA Software with counstomization of software for MCS as per requirement as per spec mentioned in technical bid documents. |
| 139 | CE/UL certified master control room PLC with redundant CPU & power supply at MCS in IP54 enclouser as spec mentioned in technical bid documents. |
| 140 | EC/UL certified Field gateway agent for transfering data from MCS to Central control room. |
| 141 | GSM based wireless/Broadband/Equipment communication system for PLC capable to tranfer & received data & gather data from remote sited to control station, All accessoried included signal enhancer antenna along with running expences till DLP. |
| 142 | CE/UL Certified Firewall for network protection. |
| 143 | SURGE PROTECTOR FOR ETHERNET communication protection. |
| 144 | CE/UL certified industrial grade Ethernedt Switch |
| 145 | Mobile App Facility system architecture (industries internet baded & viewed through mobile apps for increased local & Remote Visibility). |
| 146 | Canon/HP or eqrivalent Laser Printe 1018 or equivement. |
| 147 | Security Surveillance IP camera with recorded (optional). |
| 148 | Installation, Commissioning & testing inclidung required funiture, A/c etc. |
| 149 | Trial run for 3 month period. |
| 150 | ZONE-II |
| 151 | Instrumentation Item of Old Existing Tubewell |
| 152 | SITC of Automatic chlorination system SCADA Compatable chlorinating system. |
| 153 | 150mm dia 3M long heavy duty column pipe same as above (Extra/Spare) |
| 154 | Supply & Erection of Servo Stabilizer of 30 KVA |
| 155 | CE / UL certified Intelligent smart energy meter |
| 156 | Motor Operated Actuator with Sluice Valve (150mm dia) |
| 157 | CE / UL certified Electromagnetic flowmeter of size:150mm |
| 158 | Soft Starter with Rs485 port-400 Class. |
| 159 | Auto phase reversal unit with inbuilt time delay & enclousre (confirm to IEC: 60947-1 & IEC: 60947-b-1) |
| 160 | CE / UL certified Hydrostatatic type sub soil water level transmitter |
| 161 | CE / UL certified Pressure Transmitter |
| 162 | Automation of Old Existing Tubewell |
| 163 | CE & UL approved manufacturer’s RTU/ PLC in IP 65 encloser suitable to communicate with GSM based modem unit with CPU and power supply with analog and digital parameter and features as specified, one for each tubewell to store and transmit data on GSM backbone. RTU/PLC designed with logic to transfer data at multiple stations |
| 164 | G.S.M./G.P.R.S. based wireless communication with 4G Modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations, all accessories included with signal enhancer anteena made for pumping plant |
| 165 | CE / UL certified Surge protector for control panel |
| 166 | CE/UL certified 7\\" HMI touch screen suitable to communicate with PLC/RTU for local display & control of process parameters. |
| 167 | Complete cabling for all equipments at pumphouse |
| 168 | Control panel with IP 54 protection, industrial grade fro all equipments (separate for control (24V) and power equipments. |
| 169 | Installation, commissioning & testing |
| 170 | Trial run for 3 month period for one tubewell. |
| 171 | Instrumentation of OHT DMA-1 & DMA-2 |
| 172 | CE/UL Certified Radar type level Transmitter for OHT |
| 173 | Flow control Valve 200 mm size |
| 174 | Motor operated Actuator with Sluice valve 200mm Size |
| 175 | Electromagnetic Flowmeter of 200mm Size |
| 176 | CE / UL certified Pressure Transmitter |
| 177 | Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency.ii- Single parameter system ready to operate to measure free or total chlorineiii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinnediv- Battery and other accessories for power back for continous operation. |
| 178 | ZONE-III |
| 179 | Transportation |
| 180 | Rig Machine |
| 181 | Transportation of Rig m/c and its T&P including Erection and Dismantling of Rig m/c. |
| 182 | Transportation of 250 psi compressor including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . |
| 183 | O.P.Unit |
| 184 | Transportation of 2/3 cusec op unit including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . |
| 185 | Drilling of Bore |
| 186 | Logging of bore hole by departmental/approved electric logger. |
| 187 | Drilling of 600mm dia bore from G.L. to 60m BGL. |
| 188 | Drilling of 500mm dia bore from 61m BGL to 100m BGL. |
| 189 | Drilling of 500mm dia bore from 100m BGL to200m BGL. |
| 190 | TUBEWELL ASSEMBLY |
| 191 | 300mm dia size MSERW housing pipe 7.1mm thick including with 1 no 300 X 200mm dia M.S reducer 16mm thick, 1 no M.S. well cap 12mm thick , 10 no M.S. ring 100X12mm thick, M.S. S/I clamp ,T.W. Support (I Section) etc comp in all respect . |
| 192 | 200mm dia MSERW 7.1mm thick plain /slotted pipe including with 20 no M.S ring 100X12mm thick , 1 no M.S. bail plug , 08 no center guide etc comp in all respect. |
| 193 | LOWERING OF T/W ASSEMBLY |
| 194 | Lowering of 300mm X 200mm dia tube well assembly in bore hole and shrouding of pea gravel between annular space of bore hole and T.W. assembly from G.L. to 180m BGL. |
| 195 | Lowering of 300mm dia MSERW 7.1mm thick plain pipe from GL to 54m BGL. |
| 196 | Lowering of 200mm dia MSERW plain/slotted pipe 7.1mm thick from 55m BGL to 100m BGL. |
| 197 | Lowering of 200mm dia MSERW plain/slotted pipe 7.1mm thick from 100m BGL to 180m BGL. |
| 198 | PEA-GRAVEL |
| 199 | Supply of 1.6 - 4.8 mm size Lal Kuwan Quarry Pea-Gravel Duly Washed, Screened and properly Stacked at Site. |
| 200 | DEVELOPMENT OF TUBE WELL |
| 201 | Development of tube well by 250 PSI air compressor |
| 202 | Development of tube well by 250 PSI air compressor |
| 203 | Development of tube well by 3 cusec O.P. Unit |
| 204 | Development of tube well by 3 cusec O.P. Unit. |
| 205 | Chemical and bacteriological test. |
| 206 | Pumping plant and Other instrumentation work |
| 207 | SITC of 1100 LPM, 64 m head 30 H.P. submersible pump set with 24 meter 100mm column pipe assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates. |
| 208 | SITC of Automatic chlorination system SCADA Compatable chlorinating system. |
| 209 | 150mm dia 3M long heavy duty column pipe same as above (Extra/Spare) |
| 210 | Supply & Erection of Servo Stabilizer of 40 KVA |
| 211 | CE/UL Certified Intelligent Smart Energy Meter |
| 212 | Motor operated Actuator for with Sluice Valve of size upto 150 m |
| 213 | Electro magnetic flow meter upto150mm. |
| 214 | Soft Stater with RS485Port- 400 V Class, |
| 215 | Auto phase reversal unit with inbuilt time delay & enclousre (confirm to IEC: 60947-1 & IEC: 60947-b-1) |
| 216 | CE/UL Certified Hydrostatic type sub soil Water Level Transmiter for Tubewell |
| 217 | CE/UL Certified Pressure Transmiter . |
| 218 | SCADA AUTOMATION OF (NEW TUBEWELL and OLD Tubewell) |
| 219 | SCADA AUTOMATION ITEMS |
| 220 | CE & UL Certified PLC/RTU in IP 54 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement. |
| 221 | G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification. |
| 222 | CE/UL certified 7\\" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters. |
| 223 | CE/UL Certified Surge protector for control panel |
| 224 | Complete cabling for all equipments at pump house |
| 225 | Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment). |
| 226 | Installation, commissioing & testing for one tubewell |
| 227 | Trial Run for 3 month period for one tubewell |
| 228 | Instrumentation of OHT DMA-1 & DMA-2 |
| 229 | CE/UL Certified Radar type level Transmitter for OHT |
| 230 | Flow control Valve 250 mm size |
| 231 | Motor operated Actuator with Sluice valve 250mm Size |
| 232 | Electromagnetic Flowmeter of 250mm Size |
| 233 | CE / UL certified Pressure Transmitter |
| 234 | Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency.ii- Single parameter system ready to operate to measure free or total chlorineiii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinnediv- Battery and other accessories for power back for continous operation. |
| 235 | Three Month Trial & Run for 03 Month |
| 236 | ZONE-IV |
| 237 | Transportation |
| 238 | Rig Machine |
| 239 | Transportation of Rig m/c and its T&P including Erection and Dismantling of Rig m/c. |
| 240 | Transportation of 250 psi compressor including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . |
| 241 | O.P.Unit |
| 242 | Transportation of 2/3 cusec op unit including Loading , unloading, Erection, Dismantling & labour etc complete in all respect . |
| 243 | Drilling of Bore |
| 244 | Logging of bore hole by departmental/approved electric logger. |
| 245 | Drilling of 600mm dia bore from G.L. to 60m BGL. |
| 246 | Drilling of 450mm dia bore from 61m BGL to 100m BGL. |
| 247 | Drilling of 450mm dia bore from 100m BGL to180m BGL. |
| 248 | TUBEWELL ASSEMBLY |
| 249 | 300mm dia size MSERW housing pipe 7.1mm thick including with 1 no 300 X 150mm dia M.S reducer 16mm thick, 1 no M.S. well cap 12mm thick , 10 no M.S. ring 100X12mm thick, M.S. S/I clamp ,T.W. Support (I Section) etc comp in all respect . |
| 250 | 150mm dia MSERW 7.1mm thick plain /slotted pipe including with 20 no M.S ring 100X12mm thick , 1 no M.S. bail plug , 08 no center guide etc comp in all respect. |
| 251 | LOWERING OF T/W ASSEMBLY |
| 252 | Lowering of 300mm X 150mm dia tube well assembly in bore hole and shrouding of pea gravel between annular space of bore hole and T.W. assembly from G.L. to 165m BGL. |
| 253 | Lowering of 300mm dia MSERW 7.1mm thick plain pipe from GL to 54m BGL. |
| 254 | Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 55m BGL to 100m BGL. |
| 255 | Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 100m BGL to 165m BGL. |
| 256 | PEA-GRAVEL |
| 257 | Supply of 1.6 - 4.8 mm size Lal Kuwan Quarry Pea-Gravel Duly Washed, Screened and properly Stacked at Site. |
| 258 | DEVELOPMENT OF TUBE WELL |
| 259 | Development of tube well by 250 PSI air compressor |
| 260 | Development of tube well by 250 PSI air compressor |
| 261 | Development of tube well by 3 cusec O.P. Unit |
| 262 | Development of tube well by 3 cusec O.P. Unit. |
| 263 | Chemical and bacteriological test. |
| 264 | Pumping plant and Other instrumentation work |
| 265 | SITC of 1000 LPM, 65 m head 25 H.P. submersible pump set with 24 meter 100mm diacolumn pipe assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates. |
| 266 | SITC of Automatic chlorination system SCADA Compatable chlorinating system. |
| 267 | 100mm dia 3M long heavy duty column pipe same as above (Extra/Spare) |
| 268 | Supply & Erection of Servo Stabilizer of 40 KVA |
| 269 | CE/UL Certified Intelligent Smart Energy Meter |
| 270 | Motor operated Actuator for with Sluice Valve of size upto 150 m |
| 271 | Electro magnetic flow meter upto150mm. |
| 272 | Soft Stater with RS485Port- 400 V Class, |
| 273 | Auto phase reversal unit with inbuilt time delay & enclousre (confirm to IEC: 60947-1 & IEC: 60947-b-1) |
| 274 | CE/UL Certified Hydrostatic type sub soil Water Level Transmiter for Tubewell |
| 275 | CE/UL Certified Pressure Transmiter . |
| 276 | SCADA AUTOMATION OF TUBEWELL |
| 277 | SCADA AUTOMATION ITEMS |
| 278 | CE & UL Certified PLC/RTU in IP 54 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified also enabled with UPS for power backup upto 2Hrs & automatic on/off switching arrangement. |
| 279 | G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification. |
| 280 | CE/UL certified 7\\" HMI touch screen suitable to communicate with PLC/RTU for local display and control of process parameters. |
| 281 | CE/UL Certified Surge protector for control panel |
| 282 | Complete cabling for all equipments at pump house |
| 283 | Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment). |
| 284 | Installation, commissioing & testing for one tubewell |
| 285 | Trial Run for 3 month period for one tubewell |
| 286 | Insturmentation of OHT DMA-1 & DMA-2 |
| 287 | CE/UL Certified Radar type level Transmitter for OHT |
| 288 | Flow control Valve 200 mm size |
| 289 | Motor operated Actuator with Sluice valve 200mm Size |
| 290 | Electromagnetic Flowmeter of 200mm Size |
| 291 | CE / UL certified Pressure Transmitter |
| 292 | Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency.ii- Single parameter system ready to operate to measure free or total chlorineiii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinnediv- Battery and other accessories for power back for continous operation. |
| 293 | Instrumentation of OHT DMA-3 |
| 294 | Flow control Valve 250 mm size |
| 295 | Motor operated Actuator with Sluice valve 250mm Size |
| 296 | Electromagnetic Flowmeter of 250mm Size |
| 297 | CE / UL certified Pressure Transmitter |
| 298 | Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency.ii- Single parameter system ready to operate to measure free or total chlorineiii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinnediv- Battery and other accessories for power back for continous operation. |
| 299 | Three Month Trial & Run for 03 Month Please Enable Macros to View BoQ information |