| 1 | A):-Extension of existing pipeline from Banwar delivery line towards coal stock for fire fighting purpose at coal stock area of Topa OCP under kuju Area |
| 2 | Laying and erection of G.I/MS pipes 100mm dia |
| 3 | Laying and erection of G.I/MS pipes 150mm dia |
| 4 | Providing and fixing G.I. pipes complete with G.1. fittings including trenching and refilling etc. External work 50 min |
| 5 | Providing jointing of G.I pipe including cost of nut and bolts and testing of: 100 mm diameter pipe |
| 6 | Providing jointing of G.I pipe including cost of nut and bolts and testing of 150 mm diameter pipe |
| 7 | Providing and fixing flanges of 100 mm dia pipe including welding |
| 8 | Providing and fixing flanges of 150 mm dia pipe including welding. |
| 9 | Providing and fixing Bend of 100 mm dia pipe including welding |
| 10 | Providing and fixing bend of 150 mm dia pipe including welding. |
| 11 | Providing and fixing TEE of 100 mm dia pipe including welding. |
| 12 | Providing and fixing TEE of 150 min dia pipe including welding |
| 13 | Providing and fixing G.1. Union in G.1. pipe including cutting and threading the pipe and making long screws etc. complete (New work): 50 mm dia |
| 14 | Supply & Fixing of Sluice Valve 8\\" |
| 15 | Supply & Fixing of Sluice Valve 6\\" |
| 16 | Supply & Fixing of Sluice Valve 4\\" |
| 17 | Supply & Fixing of Sluice Valve 2\\" |
| 18 | Firefighting house with delivery coupling (30 M Length)(flexible house with metal coupler) |
| 19 | Making connection of G.1. distribution branch with G.L. main of following sizes by providing and fixing tee, including cutting and threading the pipe etc. complete: |
| 20 | Dismantling old C.L/G1 pipes including excavatio and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks, including stacking of pipes at site lead up to 50 metre: 100 mm Dia |
| 21 | Dismantling old C.I./GI pipes including excavatio and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks, including stacking of pipes at site lead up to 50 metre: 150 mm Dia |
| 22 | Supply of fire water monitor for fire fighting |
| 23 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, by mechinical/manual means ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m: Pipes, cables etc, not exceeding 80 mm dia. But not exceeding 300mm dia |
| 24 | B):-Extension of existing pipeline from tanker point near weighbridge 02 to Coal stock area of Karma OCP under Kuju Area. |
| 25 | Laying and erection of G.I/MS pipes 100mm dia |
| 26 | Laying and erection of G.I/MS pipes 150mm dia |
| 27 | Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. |
| 28 | Providing jointing of G.I pipe including cost of nut and bolts and testing of: 100 mm diameter pipe (400/6=67+20 extra) |
| 29 | Providing jointing of G.I pipe including cost of nut and bolts and testing of: 150 mm diameter pipe (600/6=100+20 extra) |
| 30 | Providing and fixing flanges of 100 mm dia pipe including welding.(400/6=67x2=134 + 10extra) |
| 31 | Providing and fixing flanges of 150 mm dia pipe including welding.(600/6=100x2=200+10 extra) |
| 32 | Providing and fixing Bend of 100 mm dia pipe including welding. |
| 33 | Providing and fixing bend of 150 mm dia pipe including welding |
| 34 | Providing and fixing TEE of 100 mm dia pipe including welding |
| 35 | Providing and fixing TEE of 150 mm dia pipe including welding. |
| 36 | Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and making long screws etc. complete (New work): 50 mm dia |
| 37 | Supply & Fixing of Sluice Valve 8\\" |
| 38 | Supply & Fixing of Sluice Valve 6\\" |
| 39 | Supply & Fixing of Sluice Valve 4\\" |
| 40 | Supply & Fixing of Sluice Valve 2\\" |
| 41 | Supply & Fixing of NR Valve 6\\" |
| 42 | supply & Fixing of NR Valve 4\\" |
| 43 | Firefighting hose with delivery coupling (30 M Length) |
| 44 | Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing tee, including cutting and threading the pipe etc. complete |
| 45 | Supply and installation of fire water monitor for fire fighting |
| 46 | Supply and fixing of Mild Steel Hexagonal Nut and bolt, M12x40 |
| 47 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, by mechinical/manual means ramming of bottoms, for. all depth, including.. getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m: Pipes, cables etc, not exceeding 80 mm dia. But not exceeding 300mm dia |
| 48 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |