| 1 | A. Repairing of cabin platform and chassis:Industrial Gas set for cutting support angles and support plates and heating of bended portion of cabin platform |
| 2 | Cutting electrode for gauging of bulged portion of bended side and cracked portion of chassis. ( Electrode- Cutrode) |
| 3 | Suitable low hydrogen electrode for material filling in gauged portion ( Electrode – 7018) |
| 4 | Suitable electrode for welding of support plates in chassis.(electrode- Lomelt - 205) |
| 5 | Grinding stone for grinding |
| 6 | Supervisor : 01 person X 05 days |
| 7 | Fitter : 01 person X 05 days |
| 8 | Welder : 02 person X 05 days |
| 9 | Helper : 03 person X 05 days |
| 10 | B. Repair of mast rest, air cleaner housing, railings etc.Industrial Gas for straightening and heating of distorted portion of mast rest and cutting channels |
| 11 | Cutting electrode for cutting of bulged material from mast rest and jack pads (Electrode- Cutrod) |
| 12 | Suitable steel electrodes for welding and material filling of cracks and support plates, channels and 04 Nos. jack pads. (Electrode- Lomelt-205) |
| 13 | L-shaped MS Angles and channels for supporting pillars of mast rest and air cleaner housings |
| 14 | Steel railing pipe – 1” for railings |
| 15 | Suitable welding electrode for welding of railings (Electrode – 7018) |
| 16 | Supervisor: 01 person X 05 days |
| 17 | Fitter: 01 person X 05 days |
| 18 | Welder: 02 person X 05 days |
| 19 | Helper: 02 person X 05 days |
| 20 | C. Repair of 04 Nos. Levelling Jacks.Repairing of cylinder with bore and grinding inside |
| 21 | Repairing of piston rod with welding, machining, grinding and polishing. |
| 22 | Repairing of thread and straightening by lathe machine. |
| 23 | Replacement of seal kit. |
| 24 | Dismantling, fitting and testing of jack assembly. |
| 25 | Supervisor – 01 no. X 04 days |
| 26 | Fitter – 01 no. X 04 days |
| 27 | Welder – 01 no. X 04 days |
| 28 | Helper – 03 nos. X 04 days |
| 29 | D. Repair of 02 Nos. Rotary Motors.Replacement of seals |
| 30 | Replacement of taper roller bearings |
| 31 | Replacement of cap screw |
| 32 | Replacement of bolts |
| 33 | Supervisor – 01 no. X 02 days |
| 34 | Fitter – 01 no. X 02 days |
| 35 | Helper – 02 nos. X 02 days |
| 36 | Contractor’s Profit @10% |
| 37 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |