|
| 1 | A. Drilling Portion |
| 2 | Supplying all materials, labour and tools and equipment for drilling 125 x 115 mm dia bore well in any kinds of soil and rocks by using D.T.H. super rig machine and ball hammer technology including all technology inclusive of mobilization, demobilization of rigs air compressor all accessories of rigs tools and plant labour etc. all complete job including transportation charge cost of flushing charge, geographical investigation etc. all complete |
| 3 | (a) 0.00m Up to 30.00m depth below G.L. In Rural Areas. |
| 4 | (b) 30.000m Up to 70.00m depth beyond . In Rural Areas |
| 5 | Supplying all materials, labour and inserting UPVC blue pipe 125 mm internal dia casing pipe for protecting the bore hole in over burden up to hard surface as per IS 12818-1392 with latest revision all complete job with taxes as per specification and direction of E/I. |
| 6 | Supplying labour cement and calcium chloride or bentonite solution and equipment’s for grouting Casing pipe. |
| 7 | Supplying all tools, equipments and labour and doing washing, flushing and development of drilled tube well to give clean and clear water all complete as per direction E/I. |
| 8 | Supplying labours and equipment’s including 125mm dia G.I. Cap & fitting and fixing over the casing pipe of bore well properly and taking it out as per direction of E/I. |
| 9 | (B) CIVIL PORTION |
| 10 | Supplying all tools, equipment and labours and lowering 32 mm dia G.I. suspension pipe in 3 mtr. Length in the drilling bore of tube well etc. all complete job as per direction of E/I. |
| 11 | Providing labour for fitting and fixing deep well cylinder jointing materials, chrome leather bucket all tools and plan etc. required for the job for low water level all complete job as per specification and direction of E/I. |
| 12 | Providing all labours for fitting and fixing of India Mark II Hand Pump including supplying all tools and plants required for the all job complete as per direction of E/I. |
| 13 | Supplying all materials, labours and equipment for constructing PCC (1:2:4) circular platform around each drilled tube well including 12mm thich cement plaster (1:4) with neat cement punning over exposed surface as per UNICEF design etc. all complete |
| 14 | Supplying all materials labour and equipment for constructing PCC (1:2:4) drain as per UNICEF Design etc. all complete . |
| 15 | Supplying all materials labour and equipment for dismantling PCC (1:2:4) Platform and taking out IM-II hand pump & its pipe including cost of carriage of materials from site to store.constructing PCC (1:2:4) drain as per UNICEF Design etc. all complete . |
| 16 | Add Extra item for Supplying tools, labours and materials for painting, numbering and year for construction of T/Well and taking of colour photograph with two or three nearest persons including platform, drain, soakpit and also longitute & latitude, details of T/W such as total depth, casing depth, static water level, drawdown, discharge, strata chart, beneficiary population etc. in separate sheet/ format all complete as per direction of E/I. |
| 17 | (C) COST OF MATERIALS |
| 18 | (I) Cost of one no. of ISI Marked India Mark II Hand Pump confirming to IS.9301/90 with amendment. No 1 to 6 complete with all accessories including 8 nos. of connecting rod |
| 19 | (II) Cost of 32 mm dia GI pipe 3 Mtrs long screwed atboth ends with seamless socket as per IS:1239 (Part 1990) |
| 20 | Basic rate of 125mm dia Blue UPVC Casing pipe Confirming to I.S.I . latest revision IS(12818)/2016 C.M.L. No-5543459. |
| 21 | Add 18% GST |
| 22 | Add 1% Labour Cess Please Enable Macros to View BoQ information |