|
| 1 | Dismantling pucca brick or Lime work Including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all Complete as perdirection of E/I. |
| 2 | Dismantling R.C.C work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all Complete as perdirection of E/I. |
| 3 | Dismantling Plain cement or or Lime work Including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all Complete as perdirection of E/I. |
| 4 | Earth in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts, levelling ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, specification and direction of E/I. & Extra for earthwork in hard soil as per specification and direction of E/I.( Vide classification of soil item B) |
| 5 | Providing clean coarse sand in filling foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm think with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per specification and direction of E/I. (Mode of measurement compacted volume) |
| 6 | Providing designation 75B one brick flat soiling joints filled with local sand including cost of watering taxes, royalty all complete as per building specification and direction of E/I. |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) |
| 8 | Providing centering and shuttering incliding struting,proping etc. and removal of form for foundation…….do……..all complete as per building specification and direction of E/I. |
| 9 | Providing E/W in filling in plinth -do- -do- all complete job as per specification and direction of E/I. |
| 10 | Providing Tor steel reinforcement of 8mm & 10mm dia bars cutting bending and binding with annealed wire with cost of wire, removal of roots, placing the rods in position as per approved disign and drawing all complete as per specification and direction of E/I. 8mm dia bar 30% |
| 11 | 10mm dia bar 70% |
| 12 | Disposal of excavated soil-…….do……..all complete as per building specification and direction of E/I. |
| 13 | Carriage Of Material (A) Cement +Steel (Lead 3kmP ) |
| 14 | (B) Sand (Lead 1km K + 9km P) |
| 15 | (C) Stone Chips (Lead 1KM K+24KM P) |
| 16 | (D) Bricks (Lead 1KM K+7KM P) |
| 17 | S/F/F Sign.Board |
| 18 | Goods & Service Tax (G.S.T.) - |
| 19 | Labour Cess - Please Enable Macros to View BoQ information |