| 1 | Earth in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts, levelling ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, specification and direction of E/I. |
| 2 | Dismantling plain cement or lime concrete work incudind ………do………of E/I. |
| 3 | Providing clean coarse sand in filling foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm think with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per specification and direction of E/I. (Mode of measurement compacted volume) |
| 4 | Providing designation 75B one brick flat soiling joints filled with local sand including cost of watering taxes, royalty all complete as per building specification and direction of E/I. |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) |
| 6 | Providing centering and shuttering incliding struting,proping etc. and removal of form for foundation…….do……..of E/I. |
| 7 | Providing 1.5mm cement punning including, carriage of water with all leads and lift as per specification and direction of E/I. |
| 8 | Providing Tor steel reinforcement of 8mm & 10mm dia bars cutting bending and binding with annealed wire with cost of wire, removal of roots, placing the rods in position as per approved disign and drawing all complete as per specification and direction of E/I. 8mm dia bar 30% |
| 9 | 10mm dia bar 70% |
| 10 | Filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered rammed, fully compacted and fine dressed with earth obtained from excavation of foundation treanches within a lead of 50M and lifts of 1.5M all complete as per specification and direction of E/I. 60% of vide Item 1 |
| 11 | Disposal of Excaveted earthby mechanical means. 40% of vide Item 1 |
| 12 | Carriage Of Material (A) Cement +Steel (Lead 3kmP ) |
| 13 | (B) Sand (Lead 1km K + 9km P) |
| 14 | (C) Stone Chips (Lead 1KM K+24KM P) |
| 15 | (D) Bricks (Lead 1KM K+7Km P) |
| 16 | S/F/F Sign.Board |
| 17 | Goods & Service Tax (G.S.T.) - |
| 18 | Labour Cess - Please Enable Macros to View BoQ information |