| 1 | Carriage of following Material from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 2 | 11 Mtr STP Pole |
| 3 | PCC Pole 8.5 Mtr Long |
| 4 | ACSR Racoon Conductor |
| 5 | ACSR Weasel Conductor |
| 6 | 11 KV XLPE Cable 3X300 Sqmm |
| 7 | Different Line Material ( XLPE Cable, LT ABC Cable, Conductor, X-Arm,Channel, Insulator , G.I. Wire , Stay wire & Rod, Earth Rod , DB BOX, DO Fuse Set etc.) |
| 8 | Supply & Erection of Following Material as per UPPCL/DVVNL/RESPO Norms and Standard/Related IS |
| 9 | Stone Pad |
| 10 | 11 KV F Clamp |
| 11 | Barbaid Wire |
| 12 | GI Pipe 6 MM Dia |
| 13 | T off Channel |
| 14 | X Arm Holding Clamp with Nut & Bolt |
| 15 | Erection of Following Material including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. (With proper Earthing.) |
| 16 | Erection of S.T.P Pole 11 Mtr Long including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 17 | Grouting of STP Pole 11 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 18 | Erection of PCC Pole 8.5 Mtr Long including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 19 | Grouting of PCC Pole 8.5 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 20 | Fixing of Stay Rod and its erection. Stay wire should be properly binded and tightened as per Standard Specification. |
| 21 | Grouting of stay set as per RESPO manual and also including the cost of all grouting material, labour, T & P etc. required for proper completion of work. |
| 22 | Laying of 11 KV XLPE Cable 3X300 Sqmm underground by Digging & Drilling including cost of Sand and Brick As per respo manual & as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 23 | Laying, Sagging, Stringing, Binding and Jumpering etc. of ACSR Weasel Conductor on the newly erected pole/ old pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 24 | Laying, Sagging, Stringing, Binding and Jumpering etc. of ACSR Racoon Conductor on the newly erected pole/ old pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 25 | Earthing of Supports as per Standard Specifications & as per RESPO Norms |
| 26 | Dismantling of existing 11 KV / L.T. line and removal of all accessories & fittings from poles, re-rolling of conductor and proper stacking and Cartage of dismantled conductor & accessories from site of work to DVVNL, Store. Please Enable Macros to View BoQ information |