| 1 | Carriage of following Material from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 2 | Aluminium XLPE Cable (1X400) Sqmm |
| 3 | LT ABC Cable (3X120+1X95+1X16) Sqmm |
| 4 | LT ABC Cable (3X95+1X70+1X16) Sqmm |
| 5 | Weasel Conductor |
| 6 | PCC Pole 8.5 Mtr Long |
| 7 | 250 KVA T/F |
| 8 | Different Line Material ( XLPE Cable, LT ABC Cable, Conductor, X-Arm,Channel, Insulator , G.I. Wire , Stay wire & Rod, Earth Rod , DB BOX, DO Fuse Set etc.) |
| 9 | Supply & Erection of Following Material as per UPPCL/DVVNL/RESPO Norms and Standard/Related IS |
| 10 | Danger Board with Clamps & Bolt |
| 11 | Dropper Channel (100x50x5x2028 mm) |
| 12 | Holding Clamps for Top & Dropper Channel |
| 13 | Suspension Clamp |
| 14 | Dead End Clamp |
| 15 | I Hook with Clamp |
| 16 | LT Pearcing Connector |
| 17 | Copper L Peace 62X225X12 MM (LS) |
| 18 | Aluminium Lug Long Barrel Off size |
| 19 | Tailless Unit 500 A 650 V Suitable for 250 KVA with Complete Protection Panel |
| 20 | 3 Pase Distribution Box Clamp |
| 21 | J Type Hook |
| 22 | Erection of Following Material including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. (With proper Earthing.) |
| 23 | Erection of PCC Pole 8.5 Mtr Long including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 24 | Grouting of PCC Pole 8.5 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 25 | Mounting of 250 KVA T/F on the double pole / plinth structure and connection thereof as per respo Norms & as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 26 | Erection of 11 KV Do Fuse Set as per respo Norms & as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 27 | Erection of 3 Phase Distribuiton Box as per respo Norms & as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 28 | Laying of LT ABC Cable ( 3X120+1X95+1X16), As per respo manual & as per direction of engineer Incharge including the cost of labour,. |
| 29 | Laying of LT ABC Cable ( 3X95+1X70+1X16), As per respo manual & as per direction of engineer Incharge including the cost of labour,. |
| 30 | Construction of Plinth Suitable for 250 KVA T/F with material (Sand, Bricks, Cement) & T&P Labour as per respo manual. All meterial Cement, Sand , Blast Stone will be provided by the contractor |
| 31 | FRP Fencing suitable for 250 KVA T/F as per respo Norms & as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 32 | GI Pipe Bore Earthing 60 Feet Deep for neutral 250 KVA T/F for Body as per RESPO Norms (All the material for earthing will be provided by the contractor) |
| 33 | Chemical Earthing for 250 KVA T/F for Body as per RESPO Norms (All the material for earthing will be provided by the contractor) |
| 34 | Earthing of Supports as per Standard Specifications & as per RESPO Norms |
| 35 | Dismantling of Old 100 KVA T/F and removal of all accessories & fittings from poles, re-rolling of conductor and proper stacking and Cartage of dismantled conductor & accessories from site of work to DVVNL, Store Panki. Please Enable Macros to View BoQ information |