| 1 | (Part-A) Supply & Erection Providing & Fixing of Holding Clamp for V type x Arm | (Part-A) Supply & Erection Providing & Fixing of Holding Clamp for V type x Arm |
| 2 | Providing & Fixing of Stone pad | Providing & Fixing of Stone pad |
| 3 | Providing & Fixing of Dropper Channel | Providing & Fixing of Dropper Channel |
| 4 | Providing & Fixing of LT Incoming Pannel | Providing & Fixing of LT Incoming Pannel |
| 5 | Providing & Fixing of Suspension Clamp with I Hook | Providing & Fixing of Suspension Clamp with I Hook |
| 6 | Providing & Fixing of Suspension Clamp | Providing & Fixing of Suspension Clamp |
| 7 | Providing & Fixing of X Arm Clamp | Providing & Fixing of X Arm Clamp |
| 8 | Providing & Fixing of PG Clamp | Providing & Fixing of PG Clamp |
| 9 | Providing & Fixing of Dead End Clamp | Providing & Fixing of Dead End Clamp |
| 10 | Providing & Fixing of I/J Hook | Providing & Fixing of I/J Hook |
| 11 | Providing & Fixing of U Clamp | Providing & Fixing of U Clamp |
| 12 | Providing & Fixing of I Bolt for Service Cable | Providing & Fixing of I Bolt for Service Cable |
| 13 | Providing & Fixing of MS TOP CHANNEL 125*65*2240sqmm | Providing & Fixing of MS TOP CHANNEL 125*65*2240sqmm |
| 14 | Providing & Fixing of Clamp for Top Channel | Providing & Fixing of Clamp for Top Channel |
| 15 | Providing & Fixing of MS Base Angle | Providing & Fixing of MS Base Angle |
| 16 | Providing & Fixing of T-off Channel with Clamp | Providing & Fixing of T-off Channel with Clamp |
| 17 | Providing & Fixing of SMC Box | Providing & Fixing of SMC Box |
| 18 | Providing & Fixing of Clamp for T | Providing & Fixing of Clamp for T |
| 19 | Providing & Fixing of clamp for T Channel | Providing & Fixing of clamp for T Channel |
| 20 | Providing & Fixing of Nut & Bolt off size | Providing & Fixing of Nut & Bolt off size |
| 21 | Providing & Fixing of LT Pole Clamp with Nut & Bolts | Providing & Fixing of LT Pole Clamp with Nut & Bolts |
| 22 | Providing & Fixing of Earth Wire clamp | Providing & Fixing of Earth Wire clamp |
| 23 | Providing & Fixing of HDPE Pipe 140mm | Providing & Fixing of HDPE Pipe 140mm |
| 24 | Providing & Fixing of GI Pipe 6\\" DIA | Providing & Fixing of GI Pipe 6\\" DIA |
| 25 | Providing & fixing of Connecting LEAD 1x16sqmm | Providing & fixing of Connecting LEAD 1x16sqmm |
| 26 | Providing & Fixing of Number Plate | Providing & Fixing of Number Plate |
| 27 | Providing & Fixing of Danger Board | Providing & Fixing of Danger Board |
| 28 | Providing & Fixing of F Bracket | Providing & Fixing of F Bracket |
| 29 | Providing & Fixing of E Bracket | Providing & Fixing of E Bracket |
| 30 | Providing & Fixing of AL Binding wire | Providing & Fixing of AL Binding wire |
| 31 | Providing & Applying two coats of Alluminium Paints on STP as per Norms | Providing & Applying two coats of Alluminium Paints on STP as per Norms |
| 32 | Providing & Fixing of Gaurding Angle | Providing & Fixing of Gaurding Angle |
| 33 | Providing & Fixing of Gaurding Angle clamp | Providing & Fixing of Gaurding Angle clamp |
| 34 | Providing & Fixing of DB Clamp | Providing & Fixing of DB Clamp |
| 35 | (Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | (Part-B) Carriage & Erection Carriage of PCC Pole 8.5 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 36 | Carriage of ST Pole 11 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | Carriage of ST Pole 11 Mtr. Long. from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 37 | Carriage of 25 KVA T/F fromElectricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | Carriage of 25 KVA T/F fromElectricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 38 | Carriage of 16 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | Carriage of 16 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 39 | Carriage of 100 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | Carriage of 100 KVA T/F from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 40 | Cartiage of 11kv XLPE CABLE 3*120 SQMM (940 mrt), 11kv XLPE CABLE 3*185 SQMM (140 mtr), 11kv XLPE CABLE 3*300 SQMM (50 mtr), 33kv XLPE CABLE 3*300 SQMM (780 mtr) 11kv XLPE CABLE 3*70 SQMM (175 mtr) LT XLPE Cable Al 3.5*150 sqmm (196 mtr) from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) | Cartiage of 11kv XLPE CABLE 3*120 SQMM (940 mrt), 11kv XLPE CABLE 3*185 SQMM (140 mtr), 11kv XLPE CABLE 3*300 SQMM (50 mtr), 33kv XLPE CABLE 3*300 SQMM (780 mtr) 11kv XLPE CABLE 3*70 SQMM (175 mtr) LT XLPE Cable Al 3.5*150 sqmm (196 mtr) from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) |
| 41 | Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) J) Line material viz. LT ABC 1X16 SQMM (1250 mtr), LT ABC 3X50 SQMM (1230 mtr), LT ABC 3X95 SQMM (1670mtr), Weasal conductor (25094 mtr), Rabbit Conductior (5720 mtr), Jointing Kit O/D, I/D 3*120/ 3*185/ 3*300/ 3*70 (26 nos), LT Piercing Connectors (30 nos), Outgoing VCB CT 200/100/5A (1), stay set Complete (134 nos) Stay Wire (96 kg) Earthing Complete (888 Nos.), Section DP Pole (5 nos), DB Clamp (20), 11 kv Disc Insulator (168 Nos.), Jointing Sleave for ACSR Rabbit (28 Nos), 33kv Jointing Kit (10), 11kv V Type X Arm (1090 Nos.), 11 kv Pin insulator (3128 nos), 33 kv Pin insulator with Pin (48 nos), GI Wire (421 kg) and GI Wire 8 SWG (150 kg), Gaurding Wire (23kg), 11 kv Fuse Set (5), Distribution Box (49) and other line material, if required, | Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.) J) Line material viz. LT ABC 1X16 SQMM (1250 mtr), LT ABC 3X50 SQMM (1230 mtr), LT ABC 3X95 SQMM (1670mtr), Weasal conductor (25094 mtr), Rabbit Conductior (5720 mtr), Jointing Kit O/D, I/D 3*120/ 3*185/ 3*300/ 3*70 (26 nos), LT Piercing Connectors (30 nos), Outgoing VCB CT 200/100/5A (1), stay set Complete (134 nos) Stay Wire (96 kg) Earthing Complete (888 Nos.), Section DP Pole (5 nos), DB Clamp (20), 11 kv Disc Insulator (168 Nos.), Jointing Sleave for ACSR Rabbit (28 Nos), 33kv Jointing Kit (10), 11kv V Type X Arm (1090 Nos.), 11 kv Pin insulator (3128 nos), 33 kv Pin insulator with Pin (48 nos), GI Wire (421 kg) and GI Wire 8 SWG (150 kg), Gaurding Wire (23kg), 11 kv Fuse Set (5), Distribution Box (49) and other line material, if required, |
| 42 | Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of Single Pole 8.5 Mtr. long PCC poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 43 | Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of Double Pole 8.5 Mtr. long PCC Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 44 | Erection and grouting of ST Pole 11 Mtr. long Single pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Erection and grouting of ST Pole 11 Mtr. long Single pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories alongwith stone pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 45 | Mounting & Installation of 25 KVA T/F on existing Double Pole in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. | Mounting & Installation of 25 KVA T/F on existing Double Pole in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. |
| 46 | Mounting & Installation of 63 KVA T/F on existing Double Pole in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. | Mounting & Installation of 63 KVA T/F on existing Double Pole in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. |
| 47 | Mounting & Installation of 100 KVA T/F on existing Double Pole in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. | Mounting & Installation of 100 KVA T/F on existing Double Pole in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work. |
| 48 | Laying of LT XLPE Alu. Cable 1x400 sqmm as per RESPO Norms and direction by superivising Engineer. | Laying of LT XLPE Alu. Cable 1x400 sqmm as per RESPO Norms and direction by superivising Engineer. |
| 49 | Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Fixing of earthing Complete as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 50 | Laying, sagging, stringing, binding and jumpering of ACSR Weasal conductor/ Rabbit Conductor in HT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. | Laying, sagging, stringing, binding and jumpering of ACSR Weasal conductor/ Rabbit Conductor in HT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. |
| 51 | Instalation, Commisioning & Testing of Outgoing VCB CT 200/100/5A in Proper alignment direction and making Connection as per RESPO Norms and direction by Supervising Engineer | Instalation, Commisioning & Testing of Outgoing VCB CT 200/100/5A in Proper alignment direction and making Connection as per RESPO Norms and direction by Supervising Engineer |
| 52 | Laying sagging stringing and binding and jumpering of LT ABC 1X16 SQMM (1250 mtr), LT ABC 3X50 SQMM (1230 mtr), LT ABC 3X95 SQMM (1670mtr) in 11KV/ LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. | Laying sagging stringing and binding and jumpering of LT ABC 1X16 SQMM (1250 mtr), LT ABC 3X50 SQMM (1230 mtr), LT ABC 3X95 SQMM (1670mtr) in 11KV/ LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. |
| 53 | Laying of 33 KV XLPE Cable 3x300 sqmm Through H.D.P.E.pipe by drill machine/H.D.D. Machine including the cost of arrangment of labour, T&P & Drill machine/H.D.D. machine at a depth of 1.0 mtr. Below the ground level. | Laying of 33 KV XLPE Cable 3x300 sqmm Through H.D.P.E.pipe by drill machine/H.D.D. Machine including the cost of arrangment of labour, T&P & Drill machine/H.D.D. machine at a depth of 1.0 mtr. Below the ground level. |
| 54 | Laying of 33 KV XLPE Cable 3x300 sqmm through excavated trench with sand cushioning Protective bricks and backfilling Complete and its levelling and rammuring etc., complete work as RESPO norms. | Laying of 33 KV XLPE Cable 3x300 sqmm through excavated trench with sand cushioning Protective bricks and backfilling Complete and its levelling and rammuring etc., complete work as RESPO norms. |
| 55 | Laying of 11 KV XLPE cable 3*120/ 3*185/3*300 sqmm Through H.D.P.E.pipe by drill machine/H.D.D. Machine including the cost of arrangment of labour, T&P & Drill machine/H.D.D. machine at a depth of 1.0 mtr. Below the ground level. | Laying of 11 KV XLPE cable 3*120/ 3*185/3*300 sqmm Through H.D.P.E.pipe by drill machine/H.D.D. Machine including the cost of arrangment of labour, T&P & Drill machine/H.D.D. machine at a depth of 1.0 mtr. Below the ground level. |
| 56 | Laying of 11 KV XLPE cable 3*120/ 3*185/3*300 sqmm through excavated trench with sand cushioning Protective bricks and backfilling Complete and its levelling and rammuring etc., complete work as RESPO norms. | Laying of 11 KV XLPE cable 3*120/ 3*185/3*300 sqmm through excavated trench with sand cushioning Protective bricks and backfilling Complete and its levelling and rammuring etc., complete work as RESPO norms. |
| 57 | Laying of XLPE CABLE 3.5*150 SQMM overhead sapport with clamps, fixing GI hardware and termination complete work as RESPO norms. | Laying of XLPE CABLE 3.5*150 SQMM overhead sapport with clamps, fixing GI hardware and termination complete work as RESPO norms. |
| 58 | Laying of 11kv XLPE CABLE 3*70 SQMM overhead sapport with clamps, fixing GI hardware and termination complete work as RESPO norms. | Laying of 11kv XLPE CABLE 3*70 SQMM overhead sapport with clamps, fixing GI hardware and termination complete work as RESPO norms. |
| 59 | Filling of 11 KV Jointing Kit 3*70/ 3*120/ 3*185/ 3*300sqmm ID/OD and making connection as per RESPO norms and direction by supervising engineer. | Filling of 11 KV Jointing Kit 3*70/ 3*120/ 3*185/ 3*300sqmm ID/OD and making connection as per RESPO norms and direction by supervising engineer. |
| 60 | Filling of 33 KV Jointing Kit 3x300 sqmm ID/OD and making connection as per direction by supervising engineer. | Filling of 33 KV Jointing Kit 3x300 sqmm ID/OD and making connection as per direction by supervising engineer. |
| 61 | Fixing of DISTRIBUTION BOX with Clamp on Errected pole for giving supply to consumer by connecting consumer cables. | Fixing of DISTRIBUTION BOX with Clamp on Errected pole for giving supply to consumer by connecting consumer cables. |
| 62 | Fixing of Section on DP as direction by Supervising Engineer. | Fixing of Section on DP as direction by Supervising Engineer. |
| 63 | Fixing of LT Piercing Connectors as direction by Supervising Engineer. | Fixing of LT Piercing Connectors as direction by Supervising Engineer. |
| 64 | Fixing of Jointing Sleaves as direction by supervising Engineer. | Fixing of Jointing Sleaves as direction by supervising Engineer. |
| 65 | Fixing of Stay wire as RESPO norms and direction by supervising Engineer. | Fixing of Stay wire as RESPO norms and direction by supervising Engineer. |
| 66 | Installation of Stay Set Complete as direction by supervising Engineer. | Installation of Stay Set Complete as direction by supervising Engineer. |
| 67 | Erection of Gaurding below HT line using 6/8 SWG GI wire complete with Gaurding Engle clamps nut & Bolt binding and all necessary complete in all respects as per RESPO norms | Erection of Gaurding below HT line using 6/8 SWG GI wire complete with Gaurding Engle clamps nut & Bolt binding and all necessary complete in all respects as per RESPO norms |
| 68 | Installation of LT Fuse Set as direction by supervising Engineer. | Installation of LT Fuse Set as direction by supervising Engineer. |
| 69 | Dismentling, Removal of Old & used Scrap Material and received back to ele. Store center Taj Agra including Loading, unloading both ends (0-50km) | Dismentling, Removal of Old & used Scrap Material and received back to ele. Store center Taj Agra including Loading, unloading both ends (0-50km) |