| 1 | Preventive maintenance of all type HT-motors. | Preventive maintenance of all type HT-motors. |
| 2 | IR-checking of all type HT-motors. | IR-checking of all type HT-motors. |
| 3 | Trouble-shooting and maintenance of all type HT-motors. | Trouble-shooting and maintenance of all type HT-motors. |
| 4 | No-load/load trial of all type HT-motors/transformers. | No-load/load trial of all type HT-motors/transformers. |
| 5 | Re-greasing and lube oil top-up of both side bearings of all type HT-motors. | Re-greasing and lube oil top-up of both side bearings of all type HT-motors. |
| 6 | Lube oil sampling of one side bearing of all type HT-motors. | Lube oil sampling of one side bearing of all type HT-motors. |
| 7 | Removal/re-fixing of all cable terminals of all type HT-motors. | Removal/re-fixing of all cable terminals of all type HT-motors. |
| 8 | Maintenance and repairing of power cable terminal box/heat exchanger (cooler)/cooling fan/fan enclos | Maintenance and repairing of power cable terminal box/heat exchanger (cooler)/cooling fan/fan enclos |
| 9 | Removal of all type HT-motors from foundation. | Removal of all type HT-motors from foundation. |
| 10 | Re-fixing and commissioning of all type HT-motors on foundation. | Re-fixing and commissioning of all type HT-motors on foundation. |
| 11 | Removal/re-fixing of heat exchanger (cooler)/cooling fan with enclosure/power cable terminal box of | Removal/re-fixing of heat exchanger (cooler)/cooling fan with enclosure/power cable terminal box of |
| 12 | DE/NDE-side bearing/water cooler replacement of all type HT-motors. | DE/NDE-side bearing/water cooler replacement of all type HT-motors. |
| 13 | Preventive maintenance of vacuum circuit breaker/air break switch including complete cubicle section | Preventive maintenance of vacuum circuit breaker/air break switch including complete cubicle section |
| 14 | Preventive maintenance of one horizontal bus-bar section of HT-switchgears except VCBs | Preventive maintenance of one horizontal bus-bar section of HT-switchgears except VCBs |
| 15 | Trouble-shooting and maintenance of all type HT-switchgears. | Trouble-shooting and maintenance of all type HT-switchgears. |
| 16 | Replacement of VCB/air break switch/C.T./P.T. of HT-switchgearsincluding shifting within plant | Replacement of VCB/air break switch/C.T./P.T. of HT-switchgearsincluding shifting within plant |
| 17 | Servicing of vacuum circuit breaker/air break switch including complete cubicle section/complete T.B | Servicing of vacuum circuit breaker/air break switch including complete cubicle section/complete T.B |
| 18 | Preventive maintenance of all type LT-motors upto 30 kW rating. | Preventive maintenance of all type LT-motors upto 30 kW rating. |
| 19 | Preventive maintenance of all type LT-motors above 30 kW to 100 kW rating. | Preventive maintenance of all type LT-motors above 30 kW to 100 kW rating. |
| 20 | Preventive maintenance of all type LT-motors above 100 kW to 200 kW rating. | Preventive maintenance of all type LT-motors above 100 kW to 200 kW rating. |
| 21 | IR-checking of all type LT-motors. | IR-checking of all type LT-motors. |
| 22 | Trouble-shooting and maintenance of all type LT-motors. | Trouble-shooting and maintenance of all type LT-motors. |
| 23 | No-Load/Load trial of all type LT-motors. | No-Load/Load trial of all type LT-motors. |
| 24 | Re-greasing/lube oil top-up of both side bearings of all type LT-motors upto 30 kW rating. | Re-greasing/lube oil top-up of both side bearings of all type LT-motors upto 30 kW rating. |
| 25 | Re-greasing/lube oil top-up of both side bearings of all type LT-motorsabove 30kW to 200kW rating. | Re-greasing/lube oil top-up of both side bearings of all type LT-motorsabove 30kW to 200kW rating. |
| 26 | Removal/re-fixing of all cable terminals of all type LT-motors upto 30 kW rating. | Removal/re-fixing of all cable terminals of all type LT-motors upto 30 kW rating. |
| 27 | Removal/re-fixing of all cable terminals of all type LT-motors above 30 kW to 200 kW rating. | Removal/re-fixing of all cable terminals of all type LT-motors above 30 kW to 200 kW rating. |
| 28 | Maintenance/replacement of cooling fan/fan cover/power cable terminal box of all type LT-motors upt | Maintenance/replacement of cooling fan/fan cover/power cable terminal box of all type LT-motors upt |
| 29 | Maintenance/replacement of cooling fan/fan cover/power cable terminal box of all type LT-motors abo | Maintenance/replacement of cooling fan/fan cover/power cable terminal box of all type LT-motors abo |
| 30 | Removing of all type LT-motors from foundation and transporting from location to anywhere within the | Removing of all type LT-motors from foundation and transporting from location to anywhere within the |
| 31 | Removing of all type LT-motors from foundation and transporting from location to anywhere within the | Removing of all type LT-motors from foundation and transporting from location to anywhere within the |
| 32 | Removing of all type LT-motors from foundation and transporting from location to anywhere within the | Removing of all type LT-motors from foundation and transporting from location to anywhere within the |
| 33 | Re-fixing and commissioning of all type LT-motors on foundation including transportation from anywh | Re-fixing and commissioning of all type LT-motors on foundation including transportation from anywh |
| 34 | Re-fixing and commissioning of LT-motors on foundation above 30 kW to100 kW rating. | Re-fixing and commissioning of LT-motors on foundation above 30 kW to100 kW rating. |
| 35 | Re-fixing and commissioning of LT-motors on foundationabove 100 kW to200 kW rating. | Re-fixing and commissioning of LT-motors on foundationabove 100 kW to200 kW rating. |
| 36 | Overhauling of all type horizontal/vertical LT-motors upto 3.0 kW rating. | Overhauling of all type horizontal/vertical LT-motors upto 3.0 kW rating. |
| 37 | Overhauling of all type horizontal/vertical LT-motors above 3.0 kW to 10 kW rating. | Overhauling of all type horizontal/vertical LT-motors above 3.0 kW to 10 kW rating. |
| 38 | Overhauling of all type horizontal/vertical LT-motors above 10 kW to 50 kW rating. | Overhauling of all type horizontal/vertical LT-motors above 10 kW to 50 kW rating. |
| 39 | Overhauling of all type horizontal/vertical LT-motors above 50 kW to 100 kW rating. | Overhauling of all type horizontal/vertical LT-motors above 50 kW to 100 kW rating. |
| 40 | Overhauling of all type horizontal/vertical LT-motors above 100 kW to 200 kW rating. | Overhauling of all type horizontal/vertical LT-motors above 100 kW to 200 kW rating. |
| 41 | Preventive maintenance of one starter module including complete cubicle section of LT-MCC. | Preventive maintenance of one starter module including complete cubicle section of LT-MCC. |
| 42 | Preventive maintenance of air circuit breaker including complete cubicle section of LT-switchgears. | Preventive maintenance of air circuit breaker including complete cubicle section of LT-switchgears. |
| 43 | PM of one bus-bar section of LT-switchgears/MCC except ACBs/starter modules | PM of one bus-bar section of LT-switchgears/MCC except ACBs/starter modules |
| 44 | Trouble-shooting and maintenance of LT-switchgears/MCC. | Trouble-shooting and maintenance of LT-switchgears/MCC. |
| 45 | Replacement of one complete starter module of LT-MCC. | Replacement of one complete starter module of LT-MCC. |
| 46 | Replacement of ACB of LT-switchgear including loading unloading & shifting within the plant area. | Replacement of ACB of LT-switchgear including loading unloading & shifting within the plant area. |
| 47 | Servicing of one complete starter module of LT-MCC. | Servicing of one complete starter module of LT-MCC. |
| 48 | Servicing of air circuit breaker including complete cubicle section of LT-switchgears. | Servicing of air circuit breaker including complete cubicle section of LT-switchgears. |
| 49 | New electrical panel designing assemblingcontrol wiring etc of panel upto 1.0 mtr X 2.0 mtrs. | New electrical panel designing assemblingcontrol wiring etc of panel upto 1.0 mtr X 2.0 mtrs. |
| 50 | Electrical insulating mat replacement thickness: 3.0mm width: 1.0 mtr. | Electrical insulating mat replacement thickness: 3.0mm width: 1.0 mtr. |
| 51 | Reading measurement (current voltage power etc) of any equipment of switchgear/motor/mcc etc. | Reading measurement (current voltage power etc) of any equipment of switchgear/motor/mcc etc. |
| 52 | Replacement/new electrical panel installation & commissioning etc.of size upto 1.0 mtr X 2.0 mtrs. | Replacement/new electrical panel installation & commissioning etc.of size upto 1.0 mtr X 2.0 mtrs. |
| 53 | Preventive maintenance of all type transformers upto 4.0 MVA rating including all accessories. | Preventive maintenance of all type transformers upto 4.0 MVA rating including all accessories. |
| 54 | Preventive maint. of all type transformers above 4MVA to 40 MVA rating including all accessories. | Preventive maint. of all type transformers above 4MVA to 40 MVA rating including all accessories. |
| 55 | Preventive maint. of all type transformers above 40MVA to 400 MVA rating including all accessories. | Preventive maint. of all type transformers above 40MVA to 400 MVA rating including all accessories. |
| 56 | Trouble-shooting and maintenance of all type transformers upto 400 MVA rating. | Trouble-shooting and maintenance of all type transformers upto 400 MVA rating. |
| 57 | Removal/re-fixing of HV LV & neutral connections of all type transformers upto 4.0 MVA rating. | Removal/re-fixing of HV LV & neutral connections of all type transformers upto 4.0 MVA rating. |
| 58 | Removal/re-fixing of HV LV & neutral connections of all type transformers above 4.0 MVA to 40 MVA r | Removal/re-fixing of HV LV & neutral connections of all type transformers above 4.0 MVA to 40 MVA r |
| 59 | Removal/re-fixing of HVLV & neutral connections of all type transformers above 40MVA to 400MVA rati | Removal/re-fixing of HVLV & neutral connections of all type transformers above 40MVA to 400MVA rati |
| 60 | Replacement of silicagel/silicagel breather/surge counter/regeneration of silicagel etc of all type | Replacement of silicagel/silicagel breather/surge counter/regeneration of silicagel etc of all type |
| 61 | Protections and interlocks checking of all type transformer upto 40 MVA rating. | Protections and interlocks checking of all type transformer upto 40 MVA rating. |
| 62 | Protections and interlocks checking of all type transformer above 40 MVA to 400 MVA rating. | Protections and interlocks checking of all type transformer above 40 MVA to 400 MVA rating. |
| 63 | Testing arrangement including assistance required for testing of all type transformer upto 4.0 MVA r | Testing arrangement including assistance required for testing of all type transformer upto 4.0 MVA r |
| 64 | Testing arrangement including assistance required for testing of all type transformer above 4.0 MVA | Testing arrangement including assistance required for testing of all type transformer above 4.0 MVA |
| 65 | Testing arrangement including assistance required for testing of all type transformer above 40 MVA t | Testing arrangement including assistance required for testing of all type transformer above 40 MVA t |
| 66 | Routine-checking including thermography of GSU UAT & SST transformers. | Routine-checking including thermography of GSU UAT & SST transformers. |
| 67 | Shifting of filter machine/oil storage tank/bushing stand/transformer bushing/L.A./transformer coole | Shifting of filter machine/oil storage tank/bushing stand/transformer bushing/L.A./transformer coole |
| 68 | Maintenance and repairing of oil filtration machine/oil storage tank/platform truck. | Maintenance and repairing of oil filtration machine/oil storage tank/platform truck. |
| 69 | Transformer oil sample collections including packing/BDV-testing in EM-Lab. | Transformer oil sample collections including packing/BDV-testing in EM-Lab. |
| 70 | Transportation of transformer oil sample bottles from RGPPL-site to R&D (Netra)-NOIDA. | Transportation of transformer oil sample bottles from RGPPL-site to R&D (Netra)-NOIDA. |
| 71 | Transportation of transformer oil sample bottles from R&D (Netra)-NOIDA to RGPPL-site. | Transportation of transformer oil sample bottles from R&D (Netra)-NOIDA to RGPPL-site. |
| 72 | Transportation of testing instrument/oil sample/other material up to 25kg weight from RGPPL-site to | Transportation of testing instrument/oil sample/other material up to 25kg weight from RGPPL-site to |
| 73 | Transportation of testing instrument/oil sample/other material up to 25kg weight from Mumbai/Pune/Ko | Transportation of testing instrument/oil sample/other material up to 25kg weight from Mumbai/Pune/Ko |
| 74 | Oil filtration of all type transformer upto 4.0 MVA rating. | Oil filtration of all type transformer upto 4.0 MVA rating. |
| 75 | Oil filtration of all type transformer above 4.0 MVA to 40 MVA rating. | Oil filtration of all type transformer above 4.0 MVA to 40 MVA rating. |
| 76 | Oil filtration of all type transformer above 40 MVA to 400 MVA rating. | Oil filtration of all type transformer above 40 MVA to 400 MVA rating. |
| 77 | Oil top-up including filtration (upto 2.0 KL qty) of all type transformer. | Oil top-up including filtration (upto 2.0 KL qty) of all type transformer. |
| 78 | Dismantling and removing of distribution transformers upto 2.0 MVA rating/transformer NGR anywhere w | Dismantling and removing of distribution transformers upto 2.0 MVA rating/transformer NGR anywhere w |
| 79 | Installation and commissioning of distribution transformers upto 2.0 MVA rating/transformer NGR anyw | Installation and commissioning of distribution transformers upto 2.0 MVA rating/transformer NGR anyw |
| 80 | Overhauling of distribution transformers upto 2.0 MVA rating. | Overhauling of distribution transformers upto 2.0 MVA rating. |
| 81 | Preventive maintenance of all 3 poles of circuit breaker/isolator with earth-switch of switchyard. | Preventive maintenance of all 3 poles of circuit breaker/isolator with earth-switch of switchyard. |
| 82 | Preventive maintenance of all three poles of C.T./ C.V.T./L.A./bushings/ wavetrap of switchyard & tr | Preventive maintenance of all three poles of C.T./ C.V.T./L.A./bushings/ wavetrap of switchyard & tr |
| 83 | Preventive maintenance of all type marshalling box/control panels/air compressors of switchyard. | Preventive maintenance of all type marshalling box/control panels/air compressors of switchyard. |
| 84 | Trouble-shooting and maintenance of control circuit and any equipments of switchyard. | Trouble-shooting and maintenance of control circuit and any equipments of switchyard. |
| 85 | Routine checking including thermography of all equipments of switchyard. | Routine checking including thermography of all equipments of switchyard. |
| 86 | SF6/N2 gas topping-up in one circuit breaker pole of switchyard & transformer. | SF6/N2 gas topping-up in one circuit breaker pole of switchyard & transformer. |
| 87 | Alignment of all three poles isolator of switchyard. | Alignment of all three poles isolator of switchyard. |
| 88 | Alignment of all three poles earthswitch of switchyard. | Alignment of all three poles earthswitch of switchyard. |
| 89 | Removing & dismantling of one pole of CB(SF6)/isolator with earth switch/wavetrap/CT/CVT/LA/bushing | Removing & dismantling of one pole of CB(SF6)/isolator with earth switch/wavetrap/CT/CVT/LA/bushing |
| 90 | Refixing/new erection&commissioning of CB(SF6) one pole/ isolator with ES/wavetrap/CT/CVT/LA/bushing | Refixing/new erection&commissioning of CB(SF6) one pole/ isolator with ES/wavetrap/CT/CVT/LA/bushing |
| 91 | Testing arrangementassistance for testing of all 3 poles of CB/CT/CVT/LA/isolator/ES/wavetrap etc. | Testing arrangementassistance for testing of all 3 poles of CB/CT/CVT/LA/isolator/ES/wavetrap etc. |
| 92 | Maintenance of all type of earth Pit | Maintenance of all type of earth Pit |
| 93 | Earth resistance measurement of all electrical equipments of plant & BOP area. | Earth resistance measurement of all electrical equipments of plant & BOP area. |
| 94 | Assistance/support service required during unit start-up/shut-down. | Assistance/support service required during unit start-up/shut-down. |
| 95 | Replacement & commissioning of air compressor assembly of switchyard circuit breaker. | Replacement & commissioning of air compressor assembly of switchyard circuit breaker. |
| 96 | Overhauling of all type pneumatic drive of 400kV switchyard circuit breaker. | Overhauling of all type pneumatic drive of 400kV switchyard circuit breaker. |
| 97 | Overhauling of one pole of all type isolator with earth switch of switchyard. | Overhauling of one pole of all type isolator with earth switch of switchyard. |
| 98 | Overhauling complete one pole of all type circuit breaker of switchyard. | Overhauling complete one pole of all type circuit breaker of switchyard. |
| 99 | Preventive maintenance of generator upto 360 MVA rating. | Preventive maintenance of generator upto 360 MVA rating. |
| 100 | PM of all three phase complete busduct from generator to transformer upto 15.75 kV rating. | PM of all three phase complete busduct from generator to transformer upto 15.75 kV rating. |
| 101 | Preventive maintenance of BAC cubicle compartments (LCI excitation & PT complete cubicles). | Preventive maintenance of BAC cubicle compartments (LCI excitation & PT complete cubicles). |
| 102 | PM of complete cubicle compartments of PPT-transformer/89 SS-air break switch/DC-link reactor etc. | PM of complete cubicle compartments of PPT-transformer/89 SS-air break switch/DC-link reactor etc. |
| 103 | IR-checking of generator busduct LCI excitation & accessories. | IR-checking of generator busduct LCI excitation & accessories. |
| 104 | Trouble-shooting and maintenance of control circuit and any equipment Generator and accessories. | Trouble-shooting and maintenance of control circuit and any equipment Generator and accessories. |
| 105 | Routine checking of LCI Excitation PPT-fan & cooling system of BAC-compartment. | Routine checking of LCI Excitation PPT-fan & cooling system of BAC-compartment. |
| 106 | Generator line-up for air/Co2/hydrogen filling. | Generator line-up for air/Co2/hydrogen filling. |
| 107 | Replacement of carbon brush/brush holder/hydrogen regulator etc. | Replacement of carbon brush/brush holder/hydrogen regulator etc. |
| 108 | Removal of flexible links star point bus-bar and NGR connections of generator. | Removal of flexible links star point bus-bar and NGR connections of generator. |
| 109 | Testing arrangement including assistance required for testing of generator busduct & accessories. | Testing arrangement including assistance required for testing of generator busduct & accessories. |
| 110 | Replacement of generator neutral connection protection CT/LA/flexible c links/NGR/PHE (LCI) etc. | Replacement of generator neutral connection protection CT/LA/flexible c links/NGR/PHE (LCI) etc. |
| 111 | Testing arrangement including assistance required during testing & calibration | Testing arrangement including assistance required during testing & calibration |
| 112 | Trouble-shooting and maintenance of relay/cards/meters/transducers/ABT-system/CT/PT etc. | Trouble-shooting and maintenance of relay/cards/meters/transducers/ABT-system/CT/PT etc. |
| 113 | Replacement and modification of relay/cards/meters/transducers/ABT-system/CT/PT etc. | Replacement and modification of relay/cards/meters/transducers/ABT-system/CT/PT etc. |
| 114 | PM of lead acid type complete battery bank (rating from 125 Volts to 250 Volts/300 Ah to 1700 Ah). | PM of lead acid type complete battery bank (rating from 125 Volts to 250 Volts/300 Ah to 1700 Ah). |
| 115 | Preventive maintenance of all type battery charger/distribuation panel (DC/AC). | Preventive maintenance of all type battery charger/distribuation panel (DC/AC). |
| 116 | Trouble-shooting and maintenance of battery charger/battery bank/distribution panel (DC/AC). | Trouble-shooting and maintenance of battery charger/battery bank/distribution panel (DC/AC). |
| 117 | Routine checking of all type battery banks and chargers. | Routine checking of all type battery banks and chargers. |
| 118 | Lead acid battery bank replacementcommissioning &testingrating 125 V to250 V/300 Ah to1700 Ah. | Lead acid battery bank replacementcommissioning &testingrating 125 V to250 V/300 Ah to1700 Ah. |
| 119 | ONE cell replacementcommissioning & testing of LA battery bank (125 V to250 V /300 Ah to 1700 Ah) | ONE cell replacementcommissioning & testing of LA battery bank (125 V to250 V /300 Ah to 1700 Ah) |
| 120 | Replacementcommissioning & testing of battery charger incl. loading unloading & transportation. | Replacementcommissioning & testing of battery charger incl. loading unloading & transportation. |
| 121 | Discharge test of all type complete battery bank of rating upto 250 Volts/1700 Ah). | Discharge test of all type complete battery bank of rating upto 250 Volts/1700 Ah). |
| 122 | Shifting of scrap battery/acid can min.10 nos ACID can of 40 ltrs/20 nos VRLA//Alkaline batteries | Shifting of scrap battery/acid can min.10 nos ACID can of 40 ltrs/20 nos VRLA//Alkaline batteries |
| 123 | Assistance/support services required during inspection testing and maintenance of equipments | Assistance/support services required during inspection testing and maintenance of equipments |
| 124 | PM of complete electrical system of EOT/gantry crane capacity rating upto 100 tons. | PM of complete electrical system of EOT/gantry crane capacity rating upto 100 tons. |
| 125 | Preventive maintenance of complete electric hoist's unit capacity rating 2X35 tons. | Preventive maintenance of complete electric hoist's unit capacity rating 2X35 tons. |
| 126 | Troubleshooting and maint. of electrical system of EOT/gantry crane electric hoist's & stack-lift. | Troubleshooting and maint. of electrical system of EOT/gantry crane electric hoist's & stack-lift. |
| 127 | Maintenance & repairing/replacement of control panel/resistance box/control transformer/motor etc. | Maintenance & repairing/replacement of control panel/resistance box/control transformer/motor etc. |
| 128 | Arrangement including assistance required for load testing of electric hoist's unit (35 tons) | Arrangement including assistance required for load testing of electric hoist's unit (35 tons) |
| 129 | Trouble-shooting and maintenance of overhead distribution lines. | Trouble-shooting and maintenance of overhead distribution lines. |
| 130 | Replacement of all type insulators/clamps/L.A. etc of overhead distribution lines. | Replacement of all type insulators/clamps/L.A. etc of overhead distribution lines. |
| 131 | Replacement/new installation of complete kiosk panel/G.O.D/fuse assembly etc of OH lines. | Replacement/new installation of complete kiosk panel/G.O.D/fuse assembly etc of OH lines. |
| 132 | Removing/laying of conductor earth wire guard wire etc of overhead distribution lines. | Removing/laying of conductor earth wire guard wire etc of overhead distribution lines. |
| 133 | Temporary laying/removing of all type cables including shifting cable size upto 50 sq.mm. | Temporary laying/removing of all type cables including shifting cable size upto 50 sq.mm. |
| 134 | Temporary laying/removing of all type cables including shifting cable size above 50 to 120 sq.mm. | Temporary laying/removing of all type cables including shifting cable size above 50 to 120 sq.mm. |
| 135 | Permanent Laying of cables on cable tray wall & structure etc.cable size upto 50 sq.mm. | Permanent Laying of cables on cable tray wall & structure etc.cable size upto 50 sq.mm. |
| 136 | Permanent Laying of cables on cable tray wall & structure etc.cable size above 50 to 120 sq.mm. | Permanent Laying of cables on cable tray wall & structure etc.cable size above 50 to 120 sq.mm. |
| 137 | Permanent Laying of single core cables on cable traywall & structure etc.size > 120 to <240 sqmm | Permanent Laying of single core cables on cable traywall & structure etc.size > 120 to <240 sqmm |
| 138 | Permanent Laying of single core cables on cable tray wall & structure etc.cable size > 240 sq.mm. | Permanent Laying of single core cables on cable tray wall & structure etc.cable size > 240 sq.mm. |
| 139 | Permanent Laying of 3/4 cores cables on cable tray wall & structure etc.size > 120 to <240 sqmm | Permanent Laying of 3/4 cores cables on cable tray wall & structure etc.size > 120 to <240 sqmm |
| 140 | Permanent Laying of 3/4 cores cables on cable tray wall & structure etc. size above 240 sqmm | Permanent Laying of 3/4 cores cables on cable tray wall & structure etc. size above 240 sqmm |
| 141 | One end lugging/jointing of all type LT-cables (all cores) cable size upto 50 sq.mm. | One end lugging/jointing of all type LT-cables (all cores) cable size upto 50 sq.mm. |
| 142 | One end lugging/jointing of all type LT-cables (all cores) cable size above 50 to 120 sq.mm. | One end lugging/jointing of all type LT-cables (all cores) cable size above 50 to 120 sq.mm. |
| 143 | One end lugging/jointing of all type LT-cables (all cores) cable size above 120 sq.mm. | One end lugging/jointing of all type LT-cables (all cores) cable size above 120 sq.mm. |
| 144 | Single core heat shrinkable cables termination/through jointing of cables size upto 120 sq.mm. | Single core heat shrinkable cables termination/through jointing of cables size upto 120 sq.mm. |
| 145 | Single core heat shrinkable cables termination/through jointing of cablessize above 120 to240 sqmm | Single core heat shrinkable cables termination/through jointing of cablessize above 120 to240 sqmm |
| 146 | Single core heat shrinkable cables termination/straight through jointing of cables above 240 sqmm | Single core heat shrinkable cables termination/straight through jointing of cables above 240 sqmm |
| 147 | Outer insulation repairing of cables from heat shrinkable tubing/sleeves (1mtr Length). | Outer insulation repairing of cables from heat shrinkable tubing/sleeves (1mtr Length). |
| 148 | Laying/removing/repairing of cable tray( above 0.5 ft x 2.0 ft) /conduit pipe(above dia:3 Inch) | Laying/removing/repairing of cable tray( above 0.5 ft x 2.0 ft) /conduit pipe(above dia:3 Inch) |
| 149 | Laying/removing/repairing of cable tray( upto 0.5 ft x 2.0 ft)/conduit pipe(upto 3.0 inch dia.) | Laying/removing/repairing of cable tray( upto 0.5 ft x 2.0 ft)/conduit pipe(upto 3.0 inch dia.) |
| 150 | Earthing strip laying or removing including drilling welding jointing cutting etc. | Earthing strip laying or removing including drilling welding jointing cutting etc. |
| 151 | Preventive maintenance of all type lighting transformers/lighting distribution panels. | Preventive maintenance of all type lighting transformers/lighting distribution panels. |
| 152 | Maintenance/replacement of industrial pole lighting fixture upto 30 feets height | Maintenance/replacement of industrial pole lighting fixture upto 30 feets height |
| 153 | Maintenance/replacement of all type industrial lighting fixture. | Maintenance/replacement of all type industrial lighting fixture. |
| 154 | Maintenance/replacement/servicing of all type cooling fans/exhaust fan etc. | Maintenance/replacement/servicing of all type cooling fans/exhaust fan etc. |
| 155 | Maintenance/replacement of high mast/HRSG-stacks aviation lighting fixture. | Maintenance/replacement of high mast/HRSG-stacks aviation lighting fixture. |
| 156 | Trouble-shooting and maintenance of all type lighting/cooling fans/lighting transformers etc. | Trouble-shooting and maintenance of all type lighting/cooling fans/lighting transformers etc. |
| 157 | Replacement/new erection & commissioning of lighting pole with all accessoriesheight upto 15 fts. | Replacement/new erection & commissioning of lighting pole with all accessoriesheight upto 15 fts. |
| 158 | Replacement/new erection & commissioning of lighting pole with pole height above 15 to 30 feets. | Replacement/new erection & commissioning of lighting pole with pole height above 15 to 30 feets. |
| 159 | Maintenance/replacement of lighting pole junction box/SDFU/DOL-starter etc. | Maintenance/replacement of lighting pole junction box/SDFU/DOL-starter etc. |
| 160 | Maintenance/replacement of all type MCB/RCCB/ELCB/timer etc. | Maintenance/replacement of all type MCB/RCCB/ELCB/timer etc. |
| 161 | Maintenance/replacement of domestic lighting system/electrical appliances | Maintenance/replacement of domestic lighting system/electrical appliances |
| 162 | Revival of one room complete lighting system of any buildings in plant & BOP area. | Revival of one room complete lighting system of any buildings in plant & BOP area. |
| 163 | Arrangement of temporary lights/cooling fans/cable connections etc. | Arrangement of temporary lights/cooling fans/cable connections etc. |
| 164 | Overhauling of ceiling fans/table fans/exhaust fans/geyser etc. | Overhauling of ceiling fans/table fans/exhaust fans/geyser etc. |
| 165 | Preventive maintenance of electrical system of all type skids. | Preventive maintenance of electrical system of all type skids. |
| 166 | IR-checking of all type skids. | IR-checking of all type skids. |
| 167 | Trouble-shooting and maintenance of electrical system of all type skids. | Trouble-shooting and maintenance of electrical system of all type skids. |
| 168 | Installation & commissioning of any type complete skid anywhere within the plant area. | Installation & commissioning of any type complete skid anywhere within the plant area. |
| 169 | Preventive maintenance of electrical system of EDG/fire pump. | Preventive maintenance of electrical system of EDG/fire pump. |
| 170 | Trouble-shooting and maintenance of electrical system of EDG/fire pump. | Trouble-shooting and maintenance of electrical system of EDG/fire pump. |
| 171 | Replacement of DC-starter/control module of EDG/fire pump. | Replacement of DC-starter/control module of EDG/fire pump. |
| 172 | New fabrication and erection works of mild steel supporting structure or frame at RGPPL-site. | New fabrication and erection works of mild steel supporting structure or frame at RGPPL-site. |
| 173 | Providing welder on day basis as per work specifications. | Providing welder on day basis as per work specifications. |
| 174 | Erection and dismantling of scaffolding as per work specifications. | Erection and dismantling of scaffolding as per work specifications. |
| 175 | Tarpaulin and polythene sheet covering before monsoon season/removing after monsoon season. | Tarpaulin and polythene sheet covering before monsoon season/removing after monsoon season. |
| 176 | Shifting of any material from one location to other location in the plant area upto 250 kg weight. | Shifting of any material from one location to other location in the plant area upto 250 kg weight. |
| 177 | Shifting of any material from one location to other location in the plant area >250 kg to < 500kg | Shifting of any material from one location to other location in the plant area >250 kg to < 500kg |
| 178 | Shifting of any material from one location to other location in the plant area >500 kg to <750 kg | Shifting of any material from one location to other location in the plant area >500 kg to <750 kg |
| 179 | Shifting of any material from one location to other location in the plant area >750 kg to <1500 kg | Shifting of any material from one location to other location in the plant area >750 kg to <1500 kg |
| 180 | Shifting/relocation of any material from inside the power block from EOT cranes above 1.0 ton | Shifting/relocation of any material from inside the power block from EOT cranes above 1.0 ton |
| 181 | Oil drum (210 ltr)shifting from one location to other location in the plant area. | Oil drum (210 ltr)shifting from one location to other location in the plant area. |
| 182 | Shift electrical maintenance activities in power block & BOP area as per scope of work | Shift electrical maintenance activities in power block & BOP area as per scope of work |
| 183 | Operation service of mobile hydraulic industrial vehicles/cranes as per scope of work. | Operation service of mobile hydraulic industrial vehicles/cranes as per scope of work. |
| 184 | Providing skilled workers on day basis as per scope of work. | Providing skilled workers on day basis as per scope of work. |
| 185 | Store keeper in electrical lab/store as per scope of work. | Store keeper in electrical lab/store as per scope of work. |
| 186 | Providing semiskilled workers on day basis as per scope of work. | Providing semiskilled workers on day basis as per scope of work. |
| 187 | Shift electrical maintenance activities in township area (three shifts per day) as per scope of work | Shift electrical maintenance activities in township area (three shifts per day) as per scope of work |