| 1 | APPENDIX A:Working charges |
| 2 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 3 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. |
| 4 | OD329078/2025-2026:Providing and fixing GI pipes heavy complete with GI fittings , including cost of pipe and fitting for 150 mm diameter normal bore ,but excluding earthwork |
| 5 | 100.9.11:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 160 mm nominal outside diameter pipes. |
| 6 | 18.82.4:Dismantling old C.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks, including stacking of pipes at site lead up to 50 metre:150 mm diameter C.I.pipe |
| 7 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 8 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 9 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. |
| 10 | 100.98.1008:Engaging Coolie. |
| 11 | 100.98.1009:Engaging Fitter ( grade 1). |
| 12 | 100.98.1010:Engaging Assistant Fitter or 2nd class fitter. |
| 13 | APPENDIX B:- Cost of materials |
| 14 | 100.98.239:Supply of PVC Pipe, 10kg/cm2, 160mm Dia. |
| 15 | OD329079/2025-2026:Providing and fixing 150 mm CID joint Class 10 Please Enable Macros to View BoQ information |