| 1 | Providing of Split type Hi wall 2.00 TR(rated cooling capacity should not be less than 6000 kcal/hr or 24000 BTU/hr or 7000 w) split AC machine with inverter compressor technology operating on non-CFC refrigerant (R-410A/R-32/equivalent refrigerants) suitable for wall mounting conforming to IS:1391(part-II) specification (evaporator & condenser must be of pure copper) not less than 3(Three) Star rating (latest Standard) operates on single phase 230 volt, 50 HZ, AC supply including supply of 3.0 mtr copper pipe (both for suction & liquid line), 3.0 mtr 4(four) core electrical connecting cable, remote control unitin/c batteries, 16 amps power TOP etc complete, capable of performing a) cooling b) dehumidifying c) Air circulation d) filtering as per direction of the Engineer-in-Charge. |
| 2 | Supply and installation of additional length of copper pipe of suitable diameter for suction and liquid line between indoor and outdoor units 2 TR AC beyond the standard length as per direction of the Engineer-in-Charge. |
| 3 | Providing and connecting Electric Control cables between MCB to indoor/outdoor. 3C X 2.5 Sq. Mm Copper Cable. |
| 4 | Providing & Fitting fixing of 1\\" UPVC drain pipe as per direction of the Engineer-in-Charge. |
| 5 | Fabrication of M.S. platform for placement of condensing unit by using M.S. angle of (50x50x5) mm size base plate, nuts & bolts or cradle(or manufacturer Standard Design) of suitable sizes i/c painting, fitting, fixing grouting by cement mixer as per direction of the Engineer-in-Charge. |
| 6 | Standard installation of 2.00 TR capacity High Wall Split type Air Conditioner in/c providing & fitting fixing of electrical 16 amp industrial Top & socket for indoor units, repairing of drilled wall by cement mortar, painting In/c necessary insulation of copper pipes etc. complete as per direction of the Engineer-in-Charge. |
| 7 | Providing of Vertical split AC unit of cooling capacity not less than 13000 watt and 3 Star of latest standard with hermitically sealed compressor operating on R22/R-410 A /non CFC equivalent refrigerants suitable for floor mounting, suitable for operation on 3 Phase AC supply capable of performing A) cooling, B) Dehumidify, C) Air circulation, d) Filtering. etc. complete as per direction of Engineer -in- charge. |
| 8 | installation and commissioning of 4 TR vertical split AC unit with vaccumising, Nitrogen pressure testing, first charge of refrigerant including providing Refrigerant & cable connection from MCB to Outdoor/indoor along with electrical Top etc. (upto 3mtr) complete as per direction of the Engineer in Charge . |
| 9 | Providing & installation of Hard Drawn copper piping with insulation for vertical split AC 3/4\\" (or manufacturer standard size)OD/applicable or OD based on manufacturer guideline etc. complete as per direction of Engineer -in- charge. |
| 10 | Providing & installation of Hard Drawn copper piping with insulation for vertical split AC. 1/2\\" OD(or manufacturer standard size) / applicable OD based on manufacturer guideline etc. complete as per direction of Engineer -in- charge. |
| 11 | Providing, fitting & fixing of cradle/suitable structure (Base) made of M.S. angle of 65 x 65 x 6 mm (or manufacturer standard size), nuts & bolts etc. i/c painting, fitting, fixing, grouting for placement of outdoor unit complete for vertical split AC as per direction of the Engineer-In-Charge. |
| 12 | Providing, fitting & fixing of suitable structure (Base) made of M.S. angle of 65 x 65 x 6 mm (or manufacturer standard size), nuts & bolts etc. i/c painting, fitting, fixing grouting for placement of indoor unit, the M.S base should be enclosed by 12 mm water proof ply with formica pasting/ACP sheet complete for vertical split AC as per direction of the Engineer-in-charge. |
| 13 | Providing & fitting fixing of additional (beyond 3 mtr) electric control cable (5C X 4.00 mm) suitable for connection between MCB to out door unit /Indoor unit etc complete as per direction of the Engineer in charge . |
| 14 | Providing and fitting-fixing of VI pad for outdoor unit for Vertical split AC unit as per direction of the Engineer in Charge . |
| 15 | Supplying and laying of G.I. raceway of size 150 mm × 80 mm after necessary floor cutting for refrigerant pipes, drain pipes and control cables and covering the floor with teak wood, complete in all respects as per direction of the Engineer-in-charge.. Please Enable Macros to View BoQ information |