| 1 | Disconnected of conductor jumper on pole at different place |
| 2 | Horn gap fuse jumpering for 6.6 KV power supply |
| 3 | Opening of cable lead jumper 6.6 KV/440 V power supply during breakdown rectification and cable shifting. |
| 4 | Repairing and fitting of horn gap fuse for 6.6 KV power supply |
| 5 | Conductor jumpering of HT & LT line during breakdown rectification at different places. |
| 6 | Repairing of Air Break Switch of6.6KV grade by replacing male and female contact, bushing, etc. |
| 7 | Fitting of surge lighting arrester on at different place. |
| 8 | Cable lead jumpering on pole after cable shifting and breakdown rectification power supply to HEMM, pumping, lighting etc. |
| 9 | Lifting & lowering and handling of armored cable 95/120/185sq.mm. |
| 10 | Providing & making of cable jointing heat shrinkable pole mounting epoxy kit |
| 11 | Construction of earth pit |
| 12 | Providing & erection of cradle guard different places. |
| 13 | Dismantling of tilted and rusted tubular pipe pole different places. |
| 14 | Dismantling of tilted rail pole at different places. |
| 15 | Dismantling of iron material. |
| 16 | Re-erection of tubular poles in required places. |
| 17 | Re-erection of rail poles in required places. |
| 18 | Re-erection of iron material. |
| 19 | Re-erection and tensioning of ACSR conductor in different places |
| 20 | Dismantling and erection of LT Pin/Shackle insulator |
| 21 | Dismantling and erection of stay set as required at different places. |
| 22 | Re-erection and tensioning of ACSR DOG conductor in different places. |
| 23 | Re-erection of earth wire in different places. |
| 24 | Replacement of HT Disc/pin insulator |
| 25 | Fitting of Light set after repair |
| 26 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |