| 1 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50M including all lifts with leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. |
| 2 | Earth filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered, rammed, fully compacted and finally dressed with earth obtained from excavation of foundation trenches with a lead of 50m and lift of 1.5m all complete as per building specification and direction of E/l. |
| 3 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labours, royaly and taxes all complete as per building specification and direction of E/l. |
| 4 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns for Mass Concrete. |
| 8 | Providing TMT steel reinforcement as per approved design and drawing excluding carriage of M.S bar to work site, cutting, bending end binding with annealed wire with cost of wire removal of rust placing the rods in position all complete as per building specification and direction of E/I.8mm dia bar |
| 9 | Providing TMT steel reinforcement as per approved design and drawing excluding carriage of M.S bar to work site, cutting, bending end binding with annealed wire with cost of wire removal of rust placing the rods in position all complete as per building specification and direction of E/I.10mm dia bar |
| 10 | Carriage of materials by diesel truck including loading at source, unloading at work site and stacking properly, labour, P.O.L. etc. all complete as per direction of E/I.Cement |
| 11 | Stone Chips |
| 12 | Steel |
| 13 | Bricks |
| 14 | Goods & Services Tax (G.S.T.) - 18% |
| 15 | Labour Cess - 1% Please Enable Macros to View BoQ information |