| 1 | Safe carriage of following Centralised materials from Store centre Kunera Etawah or any other place to the respective site of work through the Kachha/Pacca road including loading, unloading at the respective ends and erection of same including the work of Laying, sagging and stringing and jumpering /binding of 11 KV line through Weasal, Rabbit, Raccoon conductor etc. Cost of labour, T&P carrier etc. required for proper completion of work as per RESPO Norms is included in the work. | Safe carriage of following Centralised materials from Store centre Kunera Etawah or any other place to the respective site of work through the Kachha/Pacca road including loading, unloading at the respective ends and erection of same including the work of Laying, sagging and stringing and jumpering /binding of 11 KV line through Weasal, Rabbit, Raccoon conductor etc. Cost of labour, T&P carrier etc. required for proper completion of work as per RESPO Norms is included in the work. |
| 2 | STP 70 Pole 13 Mtr. | STP 70 Pole 13 Mtr. |
| 3 | STP 55 Pole 11 Mtr. | STP 55 Pole 11 Mtr. |
| 4 | PCC Pole 11 Mtr. | PCC Pole 11 Mtr. |
| 5 | PCC Pole 8.5 Mtr. | PCC Pole 8.5 Mtr. |
| 6 | PCC Pole 9 Mtr. | PCC Pole 9 Mtr. |
| 7 | 11 KV Cross arm V-Type | 11 KV Cross arm V-Type |
| 8 | ACSR RABBIT Conductor | ACSR RABBIT Conductor |
| 9 | ACSR Raccoon Conductor | ACSR Raccoon Conductor |
| 10 | ACSR DOG CONDUCTOR | ACSR DOG CONDUCTOR |
| 11 | 11 KV Disc Insulator T&C type 4500kg. | 11 KV Disc Insulator T&C type 4500kg. |
| 12 | 11 KV Disc fitting | 11 KV Disc fitting |
| 13 | 11 KV Pin insulator (Polymeric) | 11 KV Pin insulator (Polymeric) |
| 14 | Stay Clamp | Stay Clamp |
| 15 | Stay Wire (4.0 MM,) 7/8 SWG (GSS Wire) | Stay Wire (4.0 MM,) 7/8 SWG (GSS Wire) |
| 16 | Stay Rod | Stay Rod |
| 17 | G.I. Wire 4MM 8 SWG | G.I. Wire 4MM 8 SWG |
| 18 | Earthing Rod | Earthing Rod |
| 19 | De-Centralised Materials will be Supplied & Erected by Firm including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | De-Centralised Materials will be Supplied & Erected by Firm including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 20 | MS Channel (Dropper) 100x50x2028mm (for fuse set) | MS Channel (Dropper) 100x50x2028mm (for fuse set) |
| 21 | Stone pad 300x300x75mm | Stone pad 300x300x75mm |
| 22 | 11 KV Cross arm clamp | 11 KV Cross arm clamp |
| 23 | F-Clamp | F-Clamp |
| 24 | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts |
| 25 | MS Top channel (125x65x2240mm) | MS Top channel (125x65x2240mm) |
| 26 | Nut Bolt and washer all sizes | Nut Bolt and washer all sizes |
| 27 | Erection & fabrication of following supports including fitting of all required accessories required for proper completion of work as per RESPO Schedule. It including the cost of all labour, T&P etc. | Erection & fabrication of following supports including fitting of all required accessories required for proper completion of work as per RESPO Schedule. It including the cost of all labour, T&P etc. |
| 28 | Errection of STP 70 Pole 13 Mtr long pole as single support including fixing of all accessories as per RESPO norms. | Errection of STP 70 Pole 13 Mtr long pole as single support including fixing of all accessories as per RESPO norms. |
| 29 | Errection of STP 55 Pole 11 Mtr long pole as single support including fixing of all accessories as per RESPO norms. | Errection of STP 55 Pole 11 Mtr long pole as single support including fixing of all accessories as per RESPO norms. |
| 30 | Errection of PCC 11 Mtr long pole as single support including fixing of all accessories as per RESPO norms. | Errection of PCC 11 Mtr long pole as single support including fixing of all accessories as per RESPO norms. |
| 31 | Errection of PCC 8.5 Mtr long pole as single support including fixing of all accessories as per RESPO norms. | Errection of PCC 8.5 Mtr long pole as single support including fixing of all accessories as per RESPO norms. |
| 32 | Errection of PCC 9 Mtr long pole as single support including fixing of all accessories as per RESPO norms. | Errection of PCC 9 Mtr long pole as single support including fixing of all accessories as per RESPO norms. |
| 33 | Grouting, Concreting and plinting of Single support on Pole with cement, coarse sand & stone ballast as per RESPO norms. | Grouting, Concreting and plinting of Single support on Pole with cement, coarse sand & stone ballast as per RESPO norms. |
| 34 | Laying, sagging and stringing and jumpering /binding of ACSR Rabbit Conductor as per RESPO manual and as per direction of Executive engineer | Laying, sagging and stringing and jumpering /binding of ACSR Rabbit Conductor as per RESPO manual and as per direction of Executive engineer |
| 35 | Laying, sagging and stringing and jumpering /binding of ACSR Raccoon Conductor as per RESPO manual and as per direction of Executive engineer | Laying, sagging and stringing and jumpering /binding of ACSR Raccoon Conductor as per RESPO manual and as per direction of Executive engineer |
| 36 | Laying, sagging and stringing and jumpering /binding of ACSR Dog Conductor as per RESPO manual and as per direction of Executive engineer | Laying, sagging and stringing and jumpering /binding of ACSR Dog Conductor as per RESPO manual and as per direction of Executive engineer |
| 37 | Received Back of old scrap Pole/material from pit site to JE store/store center Etawah including loading & unloading and proper stacking. | Received Back of old scrap Pole/material from pit site to JE store/store center Etawah including loading & unloading and proper stacking. |