| 1 | Depressurization and Degassing MSV (2 X 500 MT Bullets ). | Depressurization and Degassing MSV (2 X 500 MT Bullets ). |
| 2 | Depressurization and Degassing of bullets- Above Ground Bullets- 90 MT | Depressurization and Degassing of bullets- Above Ground Bullets- 90 MT |
| 3 | Depressurization and Degassing of bullets- Above Ground Bullets- 150 MT . | Depressurization and Degassing of bullets- Above Ground Bullets- 150 MT . |
| 4 | 2X 500 MT MSV. Disconnecting the inlet, outlet of the LPG liquid and vapors line, SRV, HLA, Manhole, water drain line, globe valves, ROV and other fittings of the bullets | 2X 500 MT MSV. Disconnecting the inlet, outlet of the LPG liquid and vapors line, SRV, HLA, Manhole, water drain line, globe valves, ROV and other fittings of the bullets |
| 5 | 90 MT AGB- Disconnecting the inlet, outlet of the LPG liquid and vapors line, SRV, HLA, Manhole, water drain line, globe valves, ROV and other fittings of the bullets | 90 MT AGB- Disconnecting the inlet, outlet of the LPG liquid and vapors line, SRV, HLA, Manhole, water drain line, globe valves, ROV and other fittings of the bullets |
| 6 | 150 MT AGB- Disconnecting the inlet, outlet of the LPG liquid and vapors line, SRV, HLA, Manhole, water drain line, globe valves, ROV and other fittings of the bullets. | 150 MT AGB- Disconnecting the inlet, outlet of the LPG liquid and vapors line, SRV, HLA, Manhole, water drain line, globe valves, ROV and other fittings of the bullets. |
| 7 | Providing MS tubular ladder/scaffolding inside the 2 X 500 MT MSV bullet | Providing MS tubular ladder/scaffolding inside the 2 X 500 MT MSV bullet |
| 8 | Providing MS tubular ladder/scaffolding for the 90 MT above ground bullet | Providing MS tubular ladder/scaffolding for the 90 MT above ground bullet |
| 9 | Providing MS tubular ladder/scaffolding for the 150 MT above ground bullet | Providing MS tubular ladder/scaffolding for the 150 MT above ground bullet |
| 10 | Thorough cleaning of the inner surface of 2 X 500 MT MSV | Thorough cleaning of the inner surface of 2 X 500 MT MSV |
| 11 | Thorough cleaning of the inner surface of 90 MT Above ground bullet | Thorough cleaning of the inner surface of 90 MT Above ground bullet |
| 12 | Thorough cleaning of the inner surface of 150 MT Above Ground Bullets | Thorough cleaning of the inner surface of 150 MT Above Ground Bullets |
| 13 | Fixing back all fittings for 2X500 MT MSV | Fixing back all fittings for 2X500 MT MSV |
| 14 | Fixing back all fittings for 90MT Above Ground Bullet | Fixing back all fittings for 90MT Above Ground Bullet |
| 15 | Fixing back all fittings for 150MT Above Ground Bullet | Fixing back all fittings for 150MT Above Ground Bullet |
| 16 | Visual Inspection of LPG storage vessels | Visual Inspection of LPG storage vessels |
| 17 | Ultrasonic thickness measurement of 2X500 MT MSV | Ultrasonic thickness measurement of 2X500 MT MSV |
| 18 | Ultrasonic thickness measurement of 90 MT Above Ground Bullet: | Ultrasonic thickness measurement of 90 MT Above Ground Bullet: |
| 19 | Ultrasonic thickness measurement of 150 MT Above Ground Bullet: | Ultrasonic thickness measurement of 150 MT Above Ground Bullet: |
| 20 | Ultrasonic gauzing of Nozzle neck | Ultrasonic gauzing of Nozzle neck |
| 21 | Hardness Testing of 2X500MT MSV: | Hardness Testing of 2X500MT MSV: |
| 22 | Hardness Testing of 90MT Above Ground Bullet: | Hardness Testing of 90MT Above Ground Bullet: |
| 23 | Hardness Testing of 150MT Above Ground Bullet: | Hardness Testing of 150MT Above Ground Bullet: |
| 24 | Wet fluorescent magnetic particle test of 2X500MT MSV | Wet fluorescent magnetic particle test of 2X500MT MSV |
| 25 | Wet fluorescent magnetic particle test of 90MT Above Ground Bullet | Wet fluorescent magnetic particle test of 90MT Above Ground Bullet |
| 26 | Wet fluorescent magnetic particle test of 150MT Above Ground Bullet | Wet fluorescent magnetic particle test of 150MT Above Ground Bullet |
| 27 | Ultrasonic Flaw Detection Test of 2X500MT MSV: | Ultrasonic Flaw Detection Test of 2X500MT MSV: |
| 28 | Ultrasonic Flaw Detection Test of 90MT Above Ground Bullet: | Ultrasonic Flaw Detection Test of 90MT Above Ground Bullet: |
| 29 | Ultrasonic Flaw Detection Test of 150MT Above Ground Bullet: | Ultrasonic Flaw Detection Test of 150MT Above Ground Bullet: |
| 30 | Dye penetration test | Dye penetration test |
| 31 | Checking of settlement of 2 X 500 MT MSV and 2 X 150 & 1 X 90 MT above ground Bullets | Checking of settlement of 2 X 500 MT MSV and 2 X 150 & 1 X 90 MT above ground Bullets |
| 32 | Wet calibration for EACH BULLETS-(2X500 MT MSV AND 1X90 MT + 2x150MT ABOVE Ground Bullets). | Wet calibration for EACH BULLETS-(2X500 MT MSV AND 1X90 MT + 2x150MT ABOVE Ground Bullets). |
| 33 | Hydro test and Stretch Test – Pressure testing of the 2X500MT MSV | Hydro test and Stretch Test – Pressure testing of the 2X500MT MSV |
| 34 | Hydro test and Stretch Test – Pressure testing of the 90MT Above Ground Bullet | Hydro test and Stretch Test – Pressure testing of the 90MT Above Ground Bullet |
| 35 | Hydro test and Stretch Test – Pressure testing of the 150MT Above Ground Bullet | Hydro test and Stretch Test – Pressure testing of the 150MT Above Ground Bullet |
| 36 | Certification and Documentation for (2 X 500 MT MSV and 2 X 150 MT & 1 X 90 MT above ground ) LPG Bullets: | Certification and Documentation for (2 X 500 MT MSV and 2 X 150 MT & 1 X 90 MT above ground ) LPG Bullets: |
| 37 | Supply and installtion of HT full thread ASTM A193, Grade B7 Stud | Supply and installtion of HT full thread ASTM A193, Grade B7 Stud |
| 38 | Supply of spiral bound stainless steel (AISI 304) | Supply of spiral bound stainless steel (AISI 304) |
| 39 | Health check-up for CP System for 2 X 500 MT MSV. | Health check-up for CP System for 2 X 500 MT MSV. |
| 40 | Hydrotesting of All LPG pipeline upto 3 k.m. : | Hydrotesting of All LPG pipeline upto 3 k.m. : |
| 41 | Hydrotesting of Hydrant/Air/Service water pipeline upto 2.5 Km : | Hydrotesting of Hydrant/Air/Service water pipeline upto 2.5 Km : |
| 42 | Periodic Testing of Fire Water Storage Tanks 2x 3771 KL : | Periodic Testing of Fire Water Storage Tanks 2x 3771 KL : |
| 43 | Painting of exposed area of vessels-(2X500 MT MSV AND 1X90 MT + 2x150MT ABOVE Ground Bullets) | Painting of exposed area of vessels-(2X500 MT MSV AND 1X90 MT + 2x150MT ABOVE Ground Bullets) |