|
| 1 | MATERIALS FOR 11 KV Cut Point with 180 Degree AngleStraight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 2 no's Channel(GI) required =( 2x9.56x1.2) |
| 2 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280) |
| 3 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 2 no's Channel(GI) required =(2x9.56x0.306) |
| 4 | 11 KV pin insulator polymer |
| 5 | H W fitting(B&S) 70KN, 3Bolt |
| 6 | Disc insulator (B&S) 70 KN polymer |
| 7 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 8 | POLYCARBONATE BIRD GUARD |
| 9 | GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole) |
| 10 | MATERIALS FOR 11 KV Cut Point with 90 Degree Angle WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 11 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 4 no's Channel(GI) required =( 4x9.56x1.2) |
| 12 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280) |
| 13 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 4 no's Channel(GI) required =( 4x9.56x0.306) |
| 14 | Danger Plate, 1 no's. |
| 15 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 16 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 17 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 18 | 11 KV pin insulator polymer |
| 19 | H W fitting(B&S) 70KN, 3Bolt |
| 20 | Disc insulator (B&S) 70 KN polymer |
| 21 | Earthing of Support ( Coil Type ) |
| 22 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 23 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 24 | POLYCARBONATE BIRD GUARD |
| 25 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 26 | H.T. Stay set (Complete ) |
| 27 | H.T. Stay Insulator Type-C |
| 28 | 7/10 SWG Stay Wire 15kg /stay |
| 29 | GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole) |
| 30 | Black Paint(GIS Numbering & Zebra Stripping) |
| 31 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 32 | Civil & ServicesFixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 33 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 34 | Couping ratio 1:1.5:3(M-20 Grade) with dimension ( 500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 35 | MATERIALS FOR 11 KV Pin Points With WPB WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 36 | 11 KV V cross Arm(GI) (10.2 K.g. each ) |
| 37 | Top bracket 100x50X6 mm GI Channel(GI) (2kg each) |
| 38 | Danger Plate, 1 no's. for each pole |
| 39 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 40 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 41 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 42 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 43 | Earthing of Support ( Coil Type ) |
| 44 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 45 | GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 46 | 55 sq.mm AAA conductor |
| 47 | Black Paint(GIS Numbering & Zebra Stripping) |
| 48 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 49 | POLYCARBONATE BIRD GUARD |
| 50 | Civil & ServicesConcreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 51 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 52 | MATERIALS FOR Plinth Mounted DSS(63KVA)WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP |
| 53 | Top Channel(GI) GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 54 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 55 | M.U Channel(GI) GI 75x40x4.8 mm (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 56 | AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 57 | AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35) |
| 58 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1) |
| 59 | HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 60 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 61 | Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 62 | Transformer Base GI Channel(GI) 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 63 | Transformer Base Support GI Channel(GI) 100 X 50 X 6 MM (515 mm long) (9.56Kg./Mtr, 2 No's) (Each 2x0.515x9.56= 9.85Kg) |
| 64 | Transformer Belting Angle(GI) 50 X 50 X 6MM GI (3000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x3.0x4.5 Kg) |
| 65 | Transformer Belting Support Angle(GI) 50 X 50 X 6MM GI (580 mm long)(4.5Kg./Mtr,2 No's) (Each 2x0.580x4.5= Kg) |
| 66 | LTDB Mounting Angle(GI) 50 X 50 X 6MM GI (1000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x1x4.5 Kg) |
| 67 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 68 | LT Distribution Box with MCCB, Aluminium Busbar of single Bay with kit kat fuse for 63 KVA S/S |
| 69 | 55mm2 ACSR - PVC Insulated (50 Mtr. Each Dtr.) |
| 70 | 4 Cx 95 mm2 LT XLPE Cable(Armoured) - FOR 63 KVA Trf. |
| 71 | 4 Cx 95 mm2 LT XLPE Cable(Armoured) - From LTDB to Pole |
| 72 | AB Switch(11KV,200A.3pole,50Hz) |
| 73 | H.G.Fuse( 11KV.200A.3Pole) |
| 74 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 75 | POLYCARBONATE BIRD GUARD |
| 76 | Disc insulator (B&S)70 KN polymer |
| 77 | H W fitting (B&S)70KN(3bolted) |
| 78 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 79 | 11KV pin insulator polymer |
| 80 | HT stay set complete |
| 81 | HT stay Clamp (1.9Kg/pair) |
| 82 | HT stay insulator TYPE-C |
| 83 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 84 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 85 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 86 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 87 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 88 | Danger plate 11kv |
| 89 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 90 | Name plate |
| 91 | Structure Numbering and MarkingYellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 92 | Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering |
| 93 | Civil and Services Works(As per Technical Specification)Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.450Cu.mtr(Per Pole) (For WPB Pole) |
| 94 | Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole) |
| 95 | PCC ratio 1:3:6(M-10 Grade) For DSS Area (5X3X0.1)= 1.5 Cu. mtr. |
| 96 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 97 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 98 | Laying of 4 Cx 95 mm2 LT XLPE Cable |
| 99 | SITC and Erection of GI Fencing with Gate |
| 100 | Supply and erection of GI Pipe of dia. 150mm, Class-B (8Mtr.) |
| 101 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) (For PSC Pole) |
| 102 | Supply of AL Lugs suitable for 95 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 103 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 50-95sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 104 | MATERIALS FOR LT AB Cable Line using (4x35mm²+1x35mm²+1x16mm²) AB Cable9 Mtr. long 300 Kg. PSC Pole |
| 105 | LT Stay set Complete |
| 106 | 7/12 SWG GI stay wire, Grade -2 |
| 107 | LT stay Clamp ( 1.40Kg/pair) |
| 108 | LT Stay insulator |
| 109 | LT Accessories with Eye hook and ClampPole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 110 | EYE hook for XLPE Aerial bunched Cable |
| 111 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 112 | Suspension Clamp with EYE hook for ABC |
| 113 | Insulated piercing connector.Type-B-main 25 to 150 sq.mm & Tap-6 to 35 sq.mm |
| 114 | GI Pipe Earthing (each 5th pole to earth) |
| 115 | Coil Earthing |
| 116 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 117 | Danger plate (LT) |
| 118 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 119 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 120 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 121 | GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole) |
| 122 | Black Paint(GIS Numbering & Zebra Stripping) |
| 123 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 124 | Civil & ServicesFixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.) |
| 125 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) |
| 126 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 127 | (Labour Charges for dismatling of lines & S/S with all acessories.) Dismantling of 11/13 Mtr. Joist/WPB Pole- 150X150 mm/ 160X160 mm |
| 128 | Dismantling of 09/11 Mtr. Joist/WPB Pole- 116X100mm |
| 129 | Dismantling of 9/8 Mtr. PCC/Joist Pole |
| 130 | Dismantling / Removal of V Cross arm from pole |
| 131 | Dismantling of 11kV Pin Insulator with Pin |
| 132 | Dismantling / Removal of MS Channel. from Double Pole Structure /pole |
| 133 | Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 25KVA including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 134 | Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 63KVA including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 135 | Dismantling of ACSR/AAAC 34/ 55mm2 from overhead line |
| 136 | Dismantling of varous size of LT AB Cable |
| 137 | MATERIALS FOR 11 KV Cut Point with 90 Degree Angle WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 138 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 4 no's Channel(GI) required =( 4x9.56x1.2) |
| 139 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280) |
| 140 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 4 no's Channel(GI) required =( 4x9.56x0.306) |
| 141 | Danger Plate, 1 no's. |
| 142 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 143 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 144 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 145 | 11 KV pin insulator polymer |
| 146 | H W fitting(B&S) 70KN, 3Bolt |
| 147 | Disc insulator (B&S) 70 KN polymer |
| 148 | Earthing of Support ( Coil Type ) |
| 149 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 150 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 151 | POLYCARBONATE BIRD GUARD |
| 152 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 153 | H.T. Stay set (Complete ) |
| 154 | H.T. Stay Insulator Type-C |
| 155 | 7/10 SWG Stay Wire 15kg /stay |
| 156 | GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole) |
| 157 | Black Paint(GIS Numbering & Zebra Stripping) |
| 158 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 159 | Civil & ServicesFixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 160 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 161 | Couping ratio 1:1.5:3(M-20 Grade) with dimension ( 500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 162 | MATERIALS FOR 11 KV Pin Points With WPB WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 163 | 11 KV V cross Arm(GI) (10.2 K.g. each ) |
| 164 | Top bracket 100x50X6 mm GI Channel(GI) (2kg each) |
| 165 | Danger Plate, 1 no's. for each pole |
| 166 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 167 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 168 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 169 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 170 | Earthing of Support ( Coil Type ) |
| 171 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 172 | GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 173 | Black Paint(GIS Numbering & Zebra Stripping) |
| 174 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 175 | POLYCARBONATE BIRD GUARD |
| 176 | Civil & ServicesConcreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 177 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 178 | MATERIALS FOR LT AB Cable Line using (4x35mm²+1x35mm²+1x16mm²) AB Cable9 Mtr. long 300 Kg. PSC Pole |
| 179 | LT Stay set Complete |
| 180 | 7/12 SWG GI stay wire, Grade -2 |
| 181 | LT stay Clamp ( 1.40Kg/pair) |
| 182 | LT Stay insulator |
| 183 | LT Accessories with Eye hook and ClampPole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 184 | EYE hook for XLPE Aerial bunched Cable |
| 185 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 186 | Suspension Clamp with EYE hook for ABC |
| 187 | 4C×35 mm² (P)+1C×35 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable) |
| 188 | Insulated piercing connector.Type-B-main 25 to 150 sq.mm & Tap-6 to 35 sq.mm |
| 189 | GI Pipe Earthing (each 5th pole to earth) |
| 190 | Coil Earthing |
| 191 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 192 | Danger plate (LT) |
| 193 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 194 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 195 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 196 | GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole) |
| 197 | Black Paint(GIS Numbering & Zebra Stripping) |
| 198 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 199 | Civil & ServicesFixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.) |
| 200 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) |
| 201 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 202 | (Labour Charges for dismatling of lines with all acessories.) Dismantling of 9/8 Mtr. PCC/Joist Pole |
| 203 | Dismantling of ACSR/AAAC 34/ 55mm2 from overhead line |
| 204 | Dismantling of varous size of LT AB Cable Please Enable Macros to View BoQ information |