| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer. Bituminous courses |
| 3 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc Depth upto 1.5 m |
| 4 | Carriage of Materials by mechanical transport including loading,unloading And stacking Earth (5km) |
| 5 | Providing granular bedding having width = outer dia of pipe (Bc) + 500mm, thickness below pipe = 0.25Bc or 100mm (whichever is higher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer. 500 mm internal diamet |
| 6 | Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths full round HDPE DWC (double wall corrugated) pipes of SN8 grade as per IS 16098 (Part 2) amended upto date in trenches in complete including all material, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications, drawings and as per direction of Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. 400 mm ID |
| 7 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1.5:3 (1 Cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size). |
| 9 | Plastic HDPE Circular Inspection Chamber having internal diameter of 600mm and depth 1500 mm with arrangement for 4 nos. connections at the base to receive / connect various diameter pipes OD of 315mm having integrated base benching reinforced with horizontal and vertical ribs of minimum 20mm thick and a projection of 40mm |
| 10 | Horizontal directional drilling (by trenchless technology) of suitable dia hole below natural ground level in all type of soil and pulling 500-630 mm dia (ID) HDPE pipe including excavation, shoring/ strutting, preparation, maintaining the thrust and receiving pit of depth up to 3.0 m |
| 11 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster on rough side of brick wall finished with a floating coat of neat cement of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:3 (1 cement : 3 fine/ coarse sand) |
| 12 | Providing, installation, testing and commissioning of Centrifugal Monoblock pump set conforming to IS 9079 , 2 pole motor operating at synchronised speed of 3000 RPM with requisite MOC impeller, priming funnel, cock, suitable flanges at suction and delivery side. Pump shall have common shaft for pump and motor. Motor shall be suitable for working on 415 V ± 10%, 3 Ph, 50 Hz A.C. Supply. Motor shall be TEFC type and Pump set shall be suitable for working at various discharge and head requirements as per scope of work. Pump shall be erected on C.C. foundation / cross channels / RSJ frame block with suitable foundation bolts grouted in C.C. foundation block etc. complete in all respect as per specification, scope of work and direction of Engineer in Charge of following power rating, suitable for prescribed duty conditions mentioned in TD. 18.5 KW (25.0 HP) |
| 13 | Brick work with FPS bricks of class designation 75 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 14 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : 1:4 (1 cement : 4 fine/ coarse sand) |
| 15 | Providing and fixing stone slab covering of required size over drains including filling of joints with cement sand mortar 1:3 complete as per direction of Engineer-in-charge Average thickness 40 to 50 mm |
| 16 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) Please Enable Macros to View BoQ information |