|
| 1 | Supply and Placing of Gabion Facia with integrated Tail as secondary reinforcement for reinforced soil system as per Morth Clause 3100, IS 16014 & IRC Sp 116, Made of Mechanically Woven Double Twisted Hexagonal Shaped Wire Mesh, Mesh Type 10x12, Zn+PVC Coated, Double Twisted Steel Wire Mesh Dia. 2.7/3.7mm (Two point seven / Three point Seven milimeter) (ID/OD), Mechanically Edged/Selvedged, with Partitions at 1m interval, tying with lacing Wire of Dia 2.20/3.20 mm (Two point two / three point two zero milimeter) (ID/OD) complete including supply and filling of boulders inside Gabion facia units including the cost of carriage of materials in all leads and lifts or as per the entire satisfaction and direction of Engineer-in-Charge.The rate is including octroi, royalty, Malkana, toll taxes,sale tax or other taxes imposed by the Government but excluding GST. |
| 2 | Providing and Laying of Geotextile as per Morth (Fifth Revision) Clause 700 as Filter Media Behind Gabion Facia units, around Perforated Pipes and below intercepting drains. the Width of the Geotextile role shall not be less than 4.50 m, at Easily Accessible Location Ncluding Top and Bottom., with All Leads and Lifts, Manpower and Machinery, Materials, Labours Etc.including the cost of carriage of materials in all leads and lifts or as per the entire satisfaction and direction of Engineer-in-Charge.The rate is including octroi, royalty, Malkana, toll taxes,sale tax or other taxes imposed by the Government but excluding GST. |
| 3 | Providing and fixing of self-drilling anchor of 38 mm dia., Yield Load >400kN, nut, washer plate 200 x 200 x 10 mm (two hundred into two hundred into ten milimeter) size, coupler for connecting bars, and full- length grouting with admixture including all ancillary works for surface anchoring including grouting and all ancillary material, machinery, labour etc. including the cost of carriage of materials in all leads and lifts or as per the entire satisfaction and direction of Engineer-in-Charge.The rate is including octroi, royalty, Malkana, toll taxes,sale tax or other taxes imposed by the Government but excluding GST. |
| 4 | Supply and installation of High Tensile Steel Wire Mesh of minimum longitudinal strength 150 kN/m, coated with 150gsm Galfan (95Zn 5Al), max opening 100mm (one hundred milimeter) in horizontal direction and 150mm (one hundred fifty milimeter) in vertical direction, along with secondary erosion control PP / HDPE mat, 400gsm density complete with all accessories like boundary ropes, connection clips, press claws and other connecting elements including the cost of carriage of materials in all leads and lifts or as per the entire satisfaction and direction of Engineer-in-Charge.The rate is including octroi, royalty, Malkana, toll taxes,sale tax or other taxes imposed by the Government but excluding GST. |
| 5 | Hydromulching which includes High Performance-Flexible Growth Medium (HP-FGM) which is100% biodegradable, composed of 100% recycled, and supply and application of Biotic Soil Media (BSM) - along with standard prescriptive agronomic formulations such as fertilizer, extended-term dyes, soil pH modifiers, bio stimulant materials, seeds etc as specified, for erosion control and faster growth of vegetation, including the cost of carriage of materials in all leads and lifts or as per the entire satisfaction and direction of Engineer-in-Charge.The rate is including octroi, royalty, Malkana, toll taxes,sale tax or other taxes imposed by the Government but excluding GST. |
| 6 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains in any hight, depth and width including dressing of sides and ramming of bottoms, lift upto any hight, including getting out the excavated soil and disposal of surplus excavated soil asdirected, with in all lead and lift including of material and all kind of soil complete and as per the entire satisfaction and direction of Engineer-in-Charge. |
| 7 | Providing and laying mechnically mixed and vibrated cement concrete 1:3:6 (one cement : three sand : six graded crushed stone aggregate) 40mm (forty millimeter) size for plain / reinforced concrete in open foundation complete including form work as per drawings and technical specification clause 802,803,1202 & 1203 and curing complete including the cost of form work and carriage of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-Charge.The rate is including octroi, royalty, Malkana, toll taxes,sale tax or other taxes imposed by the Government but excluding GST. |
| 8 | Preparation and submission of detailed design report by conducting detailed survey of site, investigations, design analysis including vetting of report from IIT/NIT complete, including the cost of carriage of materials in all leads and lifts or as per the entire satisfaction and direction of Engineer-in-Charge.The rate is including octroi, royalty, Malkana, toll taxes,sale tax or other taxes imposed by the Government but excluding GST. Please Enable Macros to View BoQ information |