Name of Work:- WW/Painting work of Govt. Resi. Qtrs. in Sect. No. 13 under M-2 Sub Division, PWD Bhopal
Sl. No.
Item Description
1
WW/Painting work of Govt. Resi. Qtrs. in Sect. No. 13 under M-2 Sub Division, PWD Bhopal Please Enable Macros to View BoQ information Bill of Quantities (BOQ) Name of work : WW/Painting work of Govt. Resi. Qtrs. in Sect. No. 13 under M-2 Sub Division, PWD Bhopal Probable Amount of contract : (Rs. in Figures) : Rs. 38.00 Lacs (Rs in words) : Rupees Time Alloved : 06 months SNo SOR Item Particulers of Item Quantity Unit Rate Amount
13.41 P.No. 474 Note : Putty shall be applied only on the internal walls, for application on the exterior walls prior permission ofAPD/Chief Engineer will be required.
5
13.42 P.No. 474
6
13.67 P.No.479 13.67.1 With ready mixed pink or grey primer on wood work ( hard and soft wood) having VOC content less than 50 grams/ litre. 500.0 Sqm 28.0 14000.0 With ready mixed red oxide zinc chromatic on steel/ iron works having VOC content less than 250 grams/litre. 13.67.2 500.0 Sqm 24.0 12000.0 13.67.3 With water thinnable cement primer on wall surface having 13000.0 Sqm 24.0 312000.0 VOC content less than 50 grams/litre.
7
14.36 P.No.503
8
13.46 P.No. 475
9
13.48 P.No. 475 13.48.1 One coat. 50.0 Sqm 37.0 1850.0 13.48.2 Two coats. 6000.0 Sqm 56.0 336000.0
10
14.29
11
13.49 P.No. 475
12
14.50. P.No. 505 14.50.1 Old work (Two or more coats on existing cement paint surface applied @ 3.28 ltr/10 sqm. 100.0 Sqm 112.0 11200.0
13
14.51 P.No.505 14.51.1 Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) onexisting cement paint surface). 16000.0 Sqm 87.0 1392000.0 14.51.2 Old work (One or more coat applied @ 0.90 ltr/10 sqm). 1000.0 Sqm 52.0 52000.0
14
13.66 P.No. 479 13.66.1 One coat. 200.0 Sqm 35.0 7000.0 13.66.2 Two coats. 2000.0 Sqm 53.0 106000.0
15
13.71 P.No. 480 500.0 Sqm 62.0 31000.0
16
13.64 P.No. 479
17
13.79 P.No. 481
18
13.96 P.No. 487
19
13.105 P.No. 489 13.105.1 Standard pattern and desing wallpaper 10.0 sqm 615.0 6150.0 13.105.2 3D pattern and design wall paper 10.0 sqm 750.0 7500.0 13.105.3 Customize design wall paper 10.0 sqm 1145.0 11450.0
20
13.51 P.No. 476 3799497.0 Note – Including other item ( if required ) of SHEDULE OF RATES (SOR) For BUILDING WORKS in force from January, 1st 2024, of Engineer-In-Chief (Building) M.P. Public Works Department M.P.BHOPAL ( Volume- I & II ) Note 2 -The quantities given for special repairs,if exceeds,as compared to BOQ will execute under annual repairs. Sub Engineer Sub Divisional Officer Executive Engineer Sec. 13 P.W.D. M-2 Sub Dn. P.W.D. New Bhopal Division Bhopal Bhopal.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.