| 1 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 meters lead as per direction of Engineer –in – charge (a) 1:4:8 or Leaner Mix |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar |
| 3 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) (a)Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 4 | 12 mm cement plaster of mix (a) 1:6 (1 cement : 6 coarse sand) |
| 5 | 15 mm cement plaster of mix (a) 1:6 (1 cement : 6 coarse sand) |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level. (a) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level. (b)1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 8 | Providing and Laying 25mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5mm nominal size) on the top of S.W. drain walls including centering and shuttering etc. complete. |
| 9 | Neat cement punning. |
| 10 | Supply of soil (Dry) by mechanical transport i/c excavation, loading, unloading and banking the same in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks, guide banks , filling up ground depressions with 10 Km. lead and lift upto 1.5m : All Kind of soil.(supply has to be taken from nearest IL&FS plant) * Rolling by means of compactor (Where 8 tonnes roller can not be used) to achieve the required DBD shall also be the part of the item complete as per the direction of Engineer-In-charge. |
| 11 | Supplying and filling with building rubbish/ malba by mechanical transport i/c unloading & banking the same in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tone roller or wooden or steel rammers, and rolling every 3rd and top most layer with power roller of minimum 8 tonne and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions all lift upto 1.5m: |
| 12 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cementAll works upto plinth level :Concrete of M10 grade with minimum cementcontent of 220 kg /cum |
| 13 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.:Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth levelConcrete of M30 grade with minimum cementcontent of 350 kg /cum |
| 14 | Deduct for not laying the concrete by using the pump, piping-work & accessories etc, as per direction of Engineer-in-charge |
| 15 | Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated earth in layers not exceeding 20 cm in depth. |
| 16 | Providing and fixing in position pre-moulded joint filler in expansion joints |
| 17 | Centering and shuttering including strutting, propping etc. and removal of form for : (a) Foundations, footings, bases of columns, etc. for mass concrete |
| 18 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement – All work up to plinth level 1:1:5:3 (1 cement : 1.50 coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 19 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo Mechanically treated bars. |
| 20 | Providing and placing in position Red stone over S.W drains including Loading, unloading, carriage and T&P etc complete as per direction of Engineer-in-charge Red sand stone slab 30 mm thick (Undressed) |
| 21 | Raising manhole cover and frame slab to required level including dismantling existing slab and making good the damage as required (Raising depth of manhole to be paid separately) :Circular manhole 140 cm dia with circular cover 600 mm dia of grade EHD - 35 |
| 22 | Providing and fixing in position pre cast R.C.C manhole cover and frame of required shape and approved quality EHD -35 Circular Shape 560 mm internal dia. |
| 23 | Correction factor on DSR-2023 @0.973 (Or less 2.7%) |
| 24 | Add 3% Cost index on DSR 2023 items |
| 25 | Add 3% Maintenence charge Please Enable Macros to View BoQ information |