| 1 | ITEM DESCRIPTION / HEADLING |
| 2 | (1) DISMANTLING/REPAIRING & FABRICATION FOR LOWERING TWO TIMES OF BOTH 800 GPM MOTOR SET AND 2000 GPM,DISMANTLING SHIFTING AND RE-INSTALLATION WITH ALL ELECTRICALS AND MECHNICALS EQUIPMENT AT DEPARTMENTAL SUMP,OF AKWMC OCP,KATRAS AREA.:- (1) SHIFTING OF 800 GPM PUMP :- DISMANTLING OF PUMP MOTOR SET,SUCTION 6\\" SLUCE VALVE,6\\" NON RETURN VALVE AND DELIVERY. ( 7 HEAD X 01 SHIFT) (H/SK- 02X502.44+ SK- 5X434.96) = 3179.68) |
| 3 | MANUAL SHIFTING OF PUMP,MOTOR,SLUICE VALVE,NON RETURN VALVE,SUCTION PIPE,FOOT VALVE,BASEPLATE. (H/SK-2 X 502.44 + SK-11X434.96) = 5789.44. |
| 4 | MANUAL SHIFTING OF STARTER,CABLE AND LAYING AT NEW LOCATION. (H/SK-2 X 502.44 + SK-10X434.96) = 5354.48 |
| 5 | INSTALLATION OF BASEPLATE,PUMP,SLUICE VALVE AND NON RETURN VALVE AND SUCTION. (H/SK-2 X 502.44 + SK-06 X 434.96) = 3614.64 |
| 6 | LAYING AND ERECTION OF PIPE 6\\" INCLUDING TRANSPORTATION IN PLAIN. (H/SK-2 X 502.44 + SK-01X434.96 + 3 X 329.96 = 2429.72 EACH PIPE OF 6 MTRS. |
| 7 | FABRICATION OF SHORT PICES. (H/SK- 01 X 502.44 + SK-03X434.96) = 1807.32 PER UNIT. |
| 8 | FABRICATION OF M.S BEND (H/SK- 01 X 502.44 + SK-03X434.96) = 1807.32 PER UNIT. |
| 9 | TRANSPORTATION AND INSTALLATION/ERECTION OF SHORTS / FREE FLANGE/ BEND. (H/SK-2 X 502.44 + SK-04X434.96) = 2242.28 PER UNIT |
| 10 | COST OF DA CYLINDER |
| 11 | COST OF OXYGEN CYLINDER. |
| 12 | SUPPLY & FITTING OF H.T BOLT 16MM X 75 MM |
| 13 | SUPPLY OF M.S FLANGE 6\\". |
| 14 | SHIFTING OF 2000 GPM PUMP :- DISMANTLING OF PUMP MOTOR SET,SUCTION 8\\" SLUCE VALVE,8\\" NON RETURN VALVE AND DELIVERY. (H/SK- 02X502.44+ SK- 5X434.96) = 3179.68) |
| 15 | MANUAL SHIFTING OF PUMP,MOTOR,SLUICE VALVE,NON RETURN VALVE,SUCTION PIPE,FOOT VALVE,BASEPLATE. (H/SK-2 X 502.44 + SK-12 X 434.96) = 6224.40. |
| 16 | MANUAL SHIFTING OF STARTER,CABLE AND LAYING AT NEW LOCATION. (H/SK-2 X 502.44 + SK-10X434.96) = 5354.48 |
| 17 | INSTALLATION OF BASE PLATE,PUMP,SLUICE VALVE AND NON RETURN VALVE AND SUCTION. (H/SK-2 X 502.44 + SK-07 X 434.96) = 4049.60 |
| 18 | LAYING AND ERECTION OF PIPE 10\\" INCLUDING TRANSPORTATION IN PLAIN. (H/SK-2 X 502.44 + SK-02X434.96 + 6 X 329.96 = 3854.56 EACH PIPE OF 6 MTRS. |
| 19 | FABRICATION OF SHORT PICES. (H/SK- 01 X 502.44 + SK-04X434.96) = 2242.28 PER UNIT. |
| 20 | FABRICATION OF M.S BEND (H/SK- 01 X 502.44 + SK-04X434.96) = 2242.28 PER UNIT. |
| 21 | TRANSPORTATION AND INSTALLATION/ERECTION OF SHORTS PIECES / FREE FLANGE/ BEND. (H/SK- 01 X 502.44 + SK-04X434.96) = 2242.28 PER UNIT |
| 22 | COST OF DA CYLINDER |
| 23 | COST OF OXYGEN CYLINDER |
| 24 | SUPPLY & FITTING OF H.T BOLT 16 MM X 75 MM. |
| 25 | SUPPLY OF MS FLANGE 8\\" |
| 26 | (2) (1) REPAIRING AND REPLACEMENT OF LAKARKA SIDING DELIVERY PIPE LINE FOR SMOOTH SUPPLY OF WATER TO GACH PIPE IN SIDING AND MAINTAIN WATER SUPPLY OF DIFFERENT LOCATION.(2) FOR DELIVERY DIVERSION OF 4000 GPM PUMP AND INSTALLATION OF 3\\" NIPPLE - 05 NOS. SET AND 2\\" NIPPLE 2 SET WITH VALVE AND FLEXIBLE PIPE FOR FIRE FIGHTING OF AKWMC,SIDING & CHP.:- (A) MANUAL TRANSPORTATION/LOADING & UNLOADING TEN INCH PIPE OCP TO LAKARKA SIDING SITE TO SITE(434.96X8) = 3479.68 |
| 27 | DISMANTLING/LAKARKA SIDING REPAIRING OF TEN INCH DELIVERY RANGE OLD KANTAPAHARI ANGARPATHRA DISPENSARY DRANE OLD RUSTED TEN INCH PIPE CHANGING 8 NOS.PIPE DELIVERY TRANSPORTING OF LAKARKA SIDING DELIVERY JOINTING WELDING FLANGE WELDING TAPPER SHORT PIECES SITE TO SITE SIDING DELIVERY. 502.44X2 + 434.96 X 10 = 5354.48 |
| 28 | DISMANTLING / REPAIRING OF OLD LAKARKA CHP TO SIDING OLD DAMAGED DELIVERY OF CHANGING OF MS PIPE OF 8 NO.PIPE INCLUDING TO BASE & FABRICATION CUTTING WELDING MACHING OF RE-INSTALLATION OF SIDING.502.44X2 + 434.96 X 10 = 5354.48 |
| 29 | DISMANTLING REPAIRING OF OLD GACH PIPE LAKARKA SIDING REPAIRING OF RE-INSULATION GACH PIPE RE-INSTALLATION WITH VALVE SITE TO SITE LAKARKA SIDING.502.44X2 + 434.96 X 10 = 5354.48 |
| 30 | DA CYLINDER AS PER MARKET RATE. |
| 31 | OXYGEN AS PER MARKET RATE |
| 32 | H.T NUT BOLT 75MMX16MM AS PER MARKET RATE |
| 33 | (B) COMMISSIONING OF FIRE FIGHTING KANTAPAHARI PATCH:- REPAIRING OF TEN INCH DELIVERY OF CUTTING WELDING 3\\" NIPPLE 5 SIDE WELDING FITTING OF NIPPLE KANTAPAHARI PATCH SITE TO SITE WITH LABOUR CHARGE. 1X502.44+434.96X4 = 2242.28 X 3 = 6726.84 |
| 34 | MS NIPPLE 3\\" X 24\\" AS PER MARKET RATE. |
| 35 | MS VALVE 3\\" |
| 36 | COTTON CONVICE HOUSE PIPE 3\\" 300 MTR. |
| 37 | OXYGEN CYL. |
| 38 | DA CYL. |
| 39 | FITTING OF NIPPLE VALVE & COTTON FLEXIBLE PIPE LAYING OF FIVE SIDE WITH LABOUR CHARGE. 1X502.44 + 4 X434.96 = 2242.28 |
| 40 | (3)DIVERSION OF ERECTION OF 10/8\\" INCH M.S PIPE OF PIPE LINE AMPL WORK SHOP TO KATRI RIVER CORNER (600 MTR) INCLUDING ROAD CROSS & DELIVERY MATCHING AT 4 PLACE AT AKWMC,OCP UNDER KATRAS AREA.:- 10\\"/8\\" DIA M.S PIPE 600 MTR DISMANTLING AND REMOVING FROM AMPL WORK SHOP TO KATRI RIVER CORNER. (SK-1X434.96+S/SK- 11X329.96) = 4064.52 |
| 41 | SAME DISMANTLED 10\\"/8\\" PIPE CARRYING AND STOCKING UP TO NEW WAY OF PIPE LINE DIVERSION. (SK-1X434.96+S/SK- 11X329.96) = 4064.52 |
| 42 | AGAIN SAME PIPE CARRYING,LAYING AND JOINTING FROM AMPL WORK SHOP TO KATRI RIVER CORNER. (H/SK-1X502.44+S/SK- 11X329.96) = 4132.00 |
| 43 | GASKIT/BELT JOINT CUTTING 130 NO.AFTER BELT COLLECTING. (H/SK-1X502.44+S/SK-11X329.96 = 4132.00 |
| 44 | MANUAL LOADING & UNLOADING 10\\"& 8\\" ROAD CROSSING 4 PLACES. (H/SK-1X502.44+S/SK-11X329.96 = 4132.00 |
| 45 | FABRICATION OF MATCHING SIDE TO SIDE . (H/SK-1X502.44+S/SK-11X329.96 = 4132.00 |
| 46 | DA CYLINDER |
| 47 | OXYGEN CYL. |
| 48 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |