| 1 | M&L for repairs to potholes, any depth not exceeding 1.00 sqm each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths etc, cutting around edges to at least 25mm in depth making good around by filling in screened and graded road metal, watering and well ramming (including supply of road metal) using power roller 8-12 tonne capacity and applying evenly a priming/tack coat with bituminous primer @ 6 Kg per 10 sqm using paving bitumen grade VG-30 on top surface complete all as specified and directed. |
| 2 | M&L for preparing black top surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. complete all as specified and as directed. |
| 3 | M&L for applying a priming/tack coat with paving bitumen @ 5 kg per 10 Sqm using on black top surface complete all as specified and directed. |
| 4 | M&L for Providing, laying & Compaction of bituminious, macadam (BM) compacted thickness not exceeding 75 mm thick conforming to clause 504 of MoRT&H specification for road and bridges works (Fifth Revision) using mechanically crushed stone aggregates and granual material etc of grading II as per Table 500-7 of MoRT&H specification for Road and Bridges work (Fifth revision) Premixed with bituminious binder bitumen grade VG-30 @4% (percent by weight of total mix) prepared in batch type Hot Mix Plant transported to site by tippers, laid over a previously prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density complete all as specified and directed by Engineer-in-charge. |
| 5 | Notes : (i) Mix Design for Bituminous macadam shall be got designed from NIT/ CTL/ Govt Engg College and shall be got approved from GE in writing well before commencement of work without any financial effect to the department. Also the bitumen content shall not be less than 4% by weight of total mix as per clause 504.2.4 of MoRT&H specifications (Fifth Revision).(ii) If qty of binder contents is less than the qty as specified in respective items of BOQ, it shall be adjusted at supply only rates of paving bitumen @ Rs. 55.00 Per KG and if qty of binder contents is more than the qty as specified is respective items of BOQ no adjustment shall be made. |
| 6 | M&L for bituminous premix semi dense asphaltic concrete 30mm consolidated thickness with 5.5% binder (VG-30) contents by weight of total mix, crushed aggregate of grading 2, anti stripping agent, warm mix additives (quantity, quality and grade as per the approved job mix formula) etc, cleaning and pre-heating of the mineral aggregate, filler & bitumen of specific temperature throughly mixing with binder of specified bitumen contect, anti stripping agent, warm mix additives as per mix design in hot mix plant (batch type) of 100-120 TPH capacity, carrying the hot mixed materials by means of tipper, trucks or any other approved and and suitable arrangements, laying and hot premixed materials over the prepared surface by means of paver finisher including manual operation as and when required for proper grade, including level and camber through rolling with power roller 8 to 12 tonnes smooth wheeled, vibratory and tendem roller with necessary hand packing and pinning to give an even surface including running expense of all plants and machineries, inclusive of proper traffic control during laying to the satisfaction of Engineer-in-charge, required quality control tests at required interval etc complete in all respects complete all as specified and directed by Engineer-in-Charge |
| 7 | Notes : (i) Job Mix formula as per clause No. 505.3.3 of MORT&H specification for road and bridge work (Fifth Revision) for bituminous concrete shall be got designed from NIT/ CTL/ Govt Engg College and shall be got approved from GE in writing well before commencement of work without any financial effect to the department. Also the bitumen content shall not be less than 5.5% by weight of total mix as per clause 507.2.5 of MoRT&H specifications (Fifth Revision).(ii) The cost of materials, transportation, Job mix formula form lab and testing charges for various tests as required are included in the unit rate quoted by the contractor.(iii) Cost of Filler i.e. rock dust, hydrated lime or cement is deemed to be included in unit rate. Please Enable Macros to View BoQ information |
| 8 | Notes : (i) Job Mix formula as per clause No. 505.3.3 of MORT&H specification for road and bridge work (Fifth Revision) for bituminous concrete shall be got designed from NIT/ CTL/ Govt Engg College and shall be got approved from GE in writing well before commencement of work without any financial effect to the department. Also the bitumen content shall not be less than 5.5% by weight of total mix as per clause 507.2.5 of MoRT&H specifications (Fifth Revision).(ii) The cost of materials, transportation, Job mix formula form lab and testing charges for various tests as required are included in the unit rate quoted by the contractor.(iii) Cost of Filler i.e. rock dust, hydrated lime or cement is deemed to be included in unit rate. Please Enable Macros to View BoQ information |