| 1 | NMDC LIMITED BIOM BACHELI COMPLEX SCHEDULE OF QUANTITIES (BOQ) (RATES TO BE QUOTED BY THE CONTRACTOR IN BLUE COLORED UNLOCKED CELLS ONLY) Name of the Work: Covering and removing of heavy-duty tarpaulin sheets on stockpiles to safeguard Dep. 10/11A stockpile and Techpro Stockpiles at Loading Plant NAME OF TENDERER : Sl. No. DESCRIPTION UOM QUANTITY UNIT RATE(excl.GST) in Rs. AMOUNT(in Rs.) |
| 2 | Work of Covering and removing of heavy-duty tarpaulin sheets on stockpiles to safeguard of Dep 10/11A stockpile at loading plant. |
| 3 | Work of Covering and removing of heavy-duty tarpaulin sheets on stockpiles to safeguard of Techpro stockpile Dep 10/11A at loading plant. |
| 4 | Supply of tarpaulin (1700010671) specification tarpaulin material: HDPE, gsm/thickness (micron): 200, duty: heavy, size: 25m X 25m, additional information: made out of virgin material, both side laminated, rust resistant eyelets (aluminum) placed at all sides at a gap of 2' feet, rope reinforced on all edges, uv stabilized, 100% water proof, high tear & tensile strength, confirming to is: 7009:2011 or latest is specification. |
| 5 | Supply of rope (1700010672) specification Rope 8 MMx33.3 M polypropylene 1060 rope diameter: 8 MM, runnage (mtr/kg): 33.3, material: polypropylene, breaking strength min (kgf): 1060, additional information: made out of virgin material, confirming to iso:9002 |
| 6 | Supply of bags (1700010670) specification bag material: HDPE, gsm/thickness (micron): 200 gsm, duty: heavy, size: 18\\"×24\\", additional information: made out of virgin material, one side open, uv stabilized, 100% water proof, confirming to be 7903:2011 or any latest revision Total Amount 0.0 GST @ 18% 0.0 Gross Total Amount 0.0 Note: |
| 7 | Prices must be filled in the exact same format as given above. Any variation in format, description, unit, quantity or T&C, if noticed, may lead to rejection of the bid. |
| 8 | In case of discrepancy between rates and amount quoted above, the quoted rates shall prevail and appropriate corrections shall be made by corporation during evaluation. |
| 9 | Adjustments made by the Corporation as a part of Correction of Errors in the quoted BOQ, shall be final and binding upon the bidders. If a bidder does not except the corrected calculation, their bid shall be rejected. |