| 1 | Earth work excavation in Hard soil using one cum Bucket Hydraluc Excavator with all leads and lifts and transpotation of ecavated matiral by mechcanical means. and direction of Engg -in- charge |
| 2 | Supply and filling in foundation and plinth with clean course river sand, in layers including watering, with cost, conveyance, royalties, and taxes of all materials, cost of all labour, carriage of water, sundries T & p required for the work etc all complete as per the specification & direction of E-I-C |
| 3 | Cement concrete in prop. (1:4:8) in foundation using 4 cm size CBHG metal of quality from approved quarry washed and cleaned including hoisting, lowering, laying concrete, ramming, watering, curing etc to required level lincluding cost, conveyance, royalties and taxes of all materials with cost of all labours, sundries and T & P such as concrete mixer, concrete vibrator required for the work etc, complete as per specification and direction of E-I-C |
| 4 | First class Fly Ash brick work in cement mortar (1:4) in Foundation & Plinth with best quality bricks having crushing strength from 103kg/cm2 to 99kg/cm2, immersing the bricks in water for not less than 6 hours before use (the bricks shall be well burnt, free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes moulding, chamfering, corbelling etc. complete as per drawing, design and specification, watering and curing for 7 days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer-in-charge. |
| 5 | Fly Ash Brick masonry in C.M. (1:6) in super structure having crushing strength not less than 103 Kg / cm2 with dimensional tolerance ± 2%. |
| 6 | R.C.C. work of M25 grade with 20 mm down grade chips (C.B.) including centring & shurtering for RCC work only (Data for 15 cum) Column Base |
| 7 | Column |
| 8 | Plinth Beam |
| 9 | Straightening , cutting , bending and binding , welding and jointing (if necessary)coiled / bent up MS rods /tor steel/ deformed rods etc. including hoisting , placing in position , tying the grills binding with 18 to 20 guge binding wire required for RCC work including cost, conveyance, taxes of all materiala, cost of all labour , T&P etc. as requrired for the work complete (Weight of binding wires will not be consider) as directed by engineer-in- charge |
| 10 | 12mm thick C.P. in C.M.(1:4) over Brick Masonery works including closed deep chipping & slurry treatment including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. |
| 11 | 16mm thick C:P (1:6) over brick & stone masonry works including closed deep chipping & slurry treatment including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. |
| 12 | Cement washing 2coats over plastered surrface including all cost conveyance taxes and as per the direction of EIC etc complete |
| 13 | Painting 2coats with weather coat over a coat of water bound cement primer including all cost conveyance taxes and as per the direction of EIC etc complete |
| 14 | C:C: (1:2:4) using 12 mm. size H.G. stone chips including the cost of all materials labour T&P sundries etc complete. Completei n all respect asper direction of engineer-in -Charges. Please Enable Macros to View BoQ information |