| 1 | Earth work Excavation and depositing on bank with initial lead and lift in all classes of soil except hard rock requiring blasting including all labour charges etc.,complete for for foundation upto 0.30 m depth |
| 2 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. |
| 3 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. . |
| 4 | Brick work in cement mortar 1:5 mix using country bricks 83/4\\"x41/4\\"x21/4\\" including cost and conveyance of all materials to site and all labour charges etc complete |
| 5 | Below Basement |
| 6 | Super Structure |
| 7 | Centering below GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. |
| 8 | Below Basement |
| 9 | Super Structure |
| 10 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works |
| 11 | Reinforced cement concrete M20 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 12 | Below Basement |
| 13 | Super Structure |
| 14 | Finishing the top of the roof with one course of Machine Pressed Tiles of size 23x23x2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar,red oxide, etc., complete complying with standard specification |
| 15 | Ceremic Tiles floor 300x300x0.06mm including cost and conveyance of all materials and all labourcharges etc, complete. |
| 16 | Daddoing Tiles floor 150x150x0.06mm including cost and conveyance of all materials and all labourcharges etc, complete. |
| 17 | Supplying and Applying Two Coats of Wall Putty 3mm Tk over RCC Surface inculding cost and conveyance of all materials to site and all loboure charges etc.,complete |
| 18 | Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 19 | White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm |
| 20 | Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete |
| 21 | Supplying and fixing of Rain water pipe 110mm dia inculding cost and conveyance |
| 22 | Provision for Rain water Harvesting Structure |
| 23 | Provision for Bench slab etc |
| 24 | Provision for SS Handrails etc |
| 25 | Provision for Name board Charges |
| 26 | Provision for Photographic charges |
| 27 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |