| 1 | Comprehensive maintenance of Air compressor 5HP of make M/s Shakti, 3 Phase including, checking of air flow line, pressure switch setting, setting of safety valves, vibration and abnormal noise check, oil check /oil consumption check, cleaning of air filters, checking functioning of valves, checking of gauge, change of oil filters and including top up of compressor oil complete all as specified and as directed by Engr-in-Charge. Location: 33 Sqn New Hangar - 01 Nos. |
| 2 | Comprehensive maintenance of Air compressor of any type, compressor drive motor 7.5KW/10HP, 3 phase assembled with Air filter, compressor element, air receiver/ oil separator, air cooler, oil cooler, drive motor, gear casing, unloader, Elektronikon control system, air dryer with bypass valves etc including checking of air flow line, pressure switch setting, setting of safety valves, vibration and abnormal noise check, oil check/ oil consumption check, cleaning of air filters, checking functioning of valves, checking of gauge, change of oil filters and including top up of compressor oil complete all as specified and as directed by Engr-in-Charge. Locations: LCA Hanger (1 to 3) - 06 Nos, Rotable bldg - 01 Nos, Avonics complex - 02 Nos, Armament - 02 Nos, IFCS - 01 No, Role Eqpt - 01 & ETB - 01 (Total - 16 Nos). |
| 3 | Comprehensive maintenance of Air compressor of any type, compressor drive motor 12.5KW/15HP, 3 phase assembled with Air filter, compressor element, air receiver/ oil separator, air cooler, oil cooler, drive motor, gear casing, unloader, Elektronikon control system, air dryer with bypass valves etc including checking of air flow line, pressure switch setting, setting of safety valves, vibration and abnormal noise check, oil check/ oil consumption check, cleaning of air filters, checking functioning of valves, checking of gauge, change of oil filters and including top up of compressor oil complete all as specified and as directed by Engr-in-Charge.Locations: Mechanical Bldg- 01, safety eqpt- 01 & ETB-01 (Total -03 Nos). |
| 4 | Comprehensive maintenance of Air compressor of any type, compressor drive motor 15KW/20HP, 3 phase assembled with Air filter, compressor element, air receiver/ oil separator, air cooler, oil cooler, drive motor, gear casing, unloader, Elektronikon control system, air dryer with bypass valves etc including checking of air flow line, pressure switch setting, setting of safety valves, vibration and abnormal noise check, oil check/ oil consumption check, cleaning of air filters, checking functioning of valves, checking of gauge, change of oil filters and including top up of compressor oil complete all as specified and as directed by Engr-in-Charge Locations: LCA Hanger(1 to 3) & ETB-01 (Total -04 Nos). |
| 5 | Comprehensive maintenance of Electric Powered Screw Air Compressor (EPSAC) Part No: E110-11AC, free air delivery 16.9 cum/min, working pressure: 10.2 Kg/sqcm, Compressor drive motor -110 KW/ 147.5 HP, RPM-1485 of make M/s ELGI, 3 phase including checking of air flow line, pressure switch setting, setting of safety valves, vibration and abnormal noise check, oil check/ oil consumption check, cleaning of air filters, checking functioning of valves, checking of gauge, change of oil filters and including top up of compressor oil complete all as specified and as directed by Engr-in-Charge. Locations: LCA ETB Bldg - 03 Nos. |
| 6 | Comprehensive maintenance of Air compressor 5HP of make M/s ELGI, 3 Phase including checking of air flow line, pressure switch setting, setting of safety valves, vibration and abnormal noise check, oil check/ oil consumption check, cleaning of air filters, checking functioning of valves, checking of gauge, change of oil filters and including top up of compressor oil complete all as specified and as directed by Engr-in-Charge. Locations: AVRO Hangar - 2 Nos, Elect Bld-01 Nos, EW Bldg - 01 Nos & LOX bay - 01Nos (Total - 05 Nos) |
| 7 | Comprehensive maintenance of Screw Air compressor (ATLAS) Part No GA110-10, compressor drive motor-110 KW, 10 bar of make M/s Atlas Copco, 3 phase assembled with Air filter, compressor element, air receiver/ oil separator, air cooler, oil cooler, drive motor, gear casing, unloader, Elektronikon control system, air dryer with bypass valves etc including checking of air flow line, pressure switch setting, setting of safety valves, vibration and abnormal noise check, oil check /oil consumption check, cleaning of air filters, checking functioning of valves, checking of gauge, change of oil filters and including top up of compressor oil complete all as specified and as directed by Engr-in-Charge. Locations : LCA ETB Bldg - 02 Nos. |
| 8 | Note for Item No 01 to 07:(a) The contractor shall attend complaints of air compressor given by concerned authorities within stipulated time period and repairs /maintenance shall be deemed to be carried out and fully equipped with required T & P.(b) The rate quoted shall be deemed to include to carried out all repairs to air compressor noticed during the period 10 months by providing minor materials and labour. Interim payments if required shall be made thrice for the period of 10 months proportionately. Please Enable Macros to View BoQ information |
| 9 | Note for Item No 01 to 07:(a) The contractor shall attend complaints of air compressor given by concerned authorities within stipulated time period and repairs /maintenance shall be deemed to be carried out and fully equipped with required T & P.(b) The rate quoted shall be deemed to include to carried out all repairs to air compressor noticed during the period 10 months by providing minor materials and labour. Interim payments if required shall be made thrice for the period of 10 months proportionately. Please Enable Macros to View BoQ information |