| 1 | SCHEDULE A PART-I (BUILDING WORK) |
| 2 | Construction of RCC overhead tank capacity 50000 gallon 21 mtr staging with stair outside complete all as specified and as shown of drawing. Note:- Structural drawings and design for RCC Overhead Tank above foundation level are attached with tender documents. However, detailed design of foundation/sub-structure and preparation of foundation drawings shall be carried out based on SBC report attched by the contractor duly vetted by any lIT at his own cost . No extra payment made to the contractor on this account. |
| 3 | SCHEDULE A PART II A (EXTERNAL WATER SUPPLY) for details refer pdf folder |
| 4 | SCHEDULE A PART II B (EXTERNAL WATER SUPPLY) |
| 5 | M&L for boring under road/ PCC by using manual tool for inserting of pipe line any size complete all as specified and directed. |
| 6 | Supply, laying, connecting and testing 200 mm bore dia ductile pipe tyton joint class K-9 suitable for including rubber joint in standard working length conforming to IS 8329 laid in trenches complete all as specified and directed. |
| 7 | M&L for ductile special fitting such as bends, tapers, tecc pieces (single and double branch) any type and angle/ radius and straight connceting pieces but all end flanged complete all as specified and directed. |
| 8 | M&L for construction of block masonry valve pit/ chambers of size 1.0 mtr x 1.0 mtr x 1.0 mtr made with subclass B old size bricks compressive strength not less than 75 g/ cm² built in ement mortar 1:6 for sluice valve chamber including necessary excavation foundation, PCC 1:3:6 type C1 using 20 mm graded stone aggregate and 15 mm thcik internal plaster using cement mortar 1:4 with floating coat of neat cement PC coping and MS sheet 3.15 mm thick and applying two coats of synthetic enamel paint over a coat of red oxide primer on both side of the cover complete all as specified and directed. |
| 9 | SCHEDULE A PART III A (EXTERNAL ELECTRIFICATION) for details refer pdf folder |
| 10 | SCHEDULE A PART III B (EXTERNAL ELECTRIFICATION) |
| 11 | S&F junction box cover made of PVC super fine quality fixed to pole connector block din rail suitable size of aluminium bus bar locking arrangement complete all as specified and directed. |
| 12 | Supply, fix testing and commissioning Out door type feeder piller box Bus bar made out of MS CRCA sheet 2mm thick of size 0.60 Mtrx0.60mtrx0.30 mtr consisting of cupper Bus Bar of rating 200 Amps working 4 wire system 415 volt mounted on various insulator with cable earth alleys including steel flexible pipe as per required length at site with new aluminium lugs of suitable size including making connection properly of existing cables of any size/type for existing new incoming and outgoing cables complete all as specified and as directed by Engr-In-Charge. Note : Bus Bar mounting stand made out of angle iron of size 50mm x50mm x 6mm, 600 mm high and size suitable to mount the panel including foundation of PCC (1:3:6) type C-1 using 20mm graded stone aggregate with and including excavation and earth work in any type of soil complete. |
| 13 | (a) INCOMING :- (i) Supply and fix 4 Pole MCCB ,63 Amp 50 Hz 415 V, With Thermal based Release type Capacity 25 KA complete all as specified and directed =01 Nos(b) OUTGOING :- (i) Supply and fix TPN MCB ,40 Amp 50 Hz 415 V, With Thermal based Release type Capacity 25 KA complete all as specified and directed =02 Nos(c) Supply and fix R Y B Phase LED based indicator lamp sets comprising of three colours complete all as specified and directed =01 set(d). Ammeter 0 - 400 Amps, Digital display, flush mounted 3 phase 4 wire with slector switch including CTs of required capacity =01 Set(e) Voltmeter 0 - 600 Volts, Digital display, flush mounted 3 phase 4 wire with slector switch - 01 set.(f) complete Internal wiring of suitable size of copper wire.(g) Supply and fix time switches 415 V three Phase of 20 Amp rating with contactor fitted inside steel enclosure. |
| 14 | SCHEDULE A PART IV (ROAD/ PATH) for details refer pdf folder |
| 15 | SCHEDULE A PART V (WALL/ FENCING/ GATE) for details refer pdf folder |
| 16 | SCHEDULE A PART VI (SITE CLEARANCE) for details refer pdf folder Please Enable Macros to View BoQ information |