Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Details |
| 2 | 1. H.L Bridge over Local Nala At Ch- 1.635 KM,L-58.120m, foundation Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. upto 3 m depth |
| 3 | Depth avobe 3m |
| 4 | RCC Gader M25 |
| 5 | PCC M15 |
| 6 | Supplyinn, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specification Clauses 1000 and 1202 |
| 7 | SUBSTRUCTURE Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 Height upto 5m RCC M25 |
| 8 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 Height upto 5m-10m RCC M25 |
| 9 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 RCC M30 |
| 10 | Supplying, fitting and placing TMT bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 11 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 12 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 -Granular material |
| 13 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 -Sandy material |
| 14 | Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 |
| 15 | Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. |
| 16 | SUPERSTRUCTURE Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 Height above 10m RCC Grade M 25 |
| 17 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 |
| 18 | Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 |
| 19 | Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 |
| 20 | Drainage Spouts complete as per drawing and Technical specification |
| 21 | P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 |
| 22 | Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification |
| 23 | Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.) |
| 24 | RIVER TRAINING AND PROTECTION WORKS -Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 Stone/Boulder |
| 25 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 |
| 26 | Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5 |
| 27 | APPROACH ROAD Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Manual Means |
| 28 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 |
| 29 | Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. |
| 30 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For grading- II Material |
| 31 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. WMM . |
| 32 | Providing and laying semi dense bituminous Concrete with 100-120 TPH batch type hot mixplant producing an average output of 75 tonnesper hour using crushed aggregate of specified grading, premixed with bituminous binder @ 4.5 to 5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tendem rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete as per Technical Specification.- SDBC |
| 33 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 34 | Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.2-1.5 kg/sqm using mechanical means as per Technical Specification Clause 502. |
| 35 | MISCELLANEOUS. Confirmatory Boring (in Soil and Rock) |
| 36 | Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1. |
| 37 | Retaining Wall of 2 m high - Earthwork in excavation in foudation trenches in ordinary soil vide classification of soil item -A) and disposal of earth as obtained to a distance upto 50m including all lifts, levelling, ramming the complete foundation trenches, removing roots of trees, |
| 38 | Providing PCC (M-150)(1:2:4) in foundataion as per MOSRT & H specification(4rth edition) |
| 39 | Providing rough dressed coursed stone masonry work in cement mortar (1:3) in foundation do -do all all complete job as per MOSRT & H specification |
| 40 | Providing rough dressed coursed stone masonry work in cement mortar (1:3) in substructure do -do all all complete job as per MOSRT & H specification |
| 41 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC M20 at top of retaining wall |
| 42 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 |
| 43 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications |
| 44 | Five Years Maintanace - For 1st Year |
| 45 | For 2nd Year |
| 46 | For 3rd Year |
| 47 | For 4th Year |
| 48 | For 5th Year |
| 49 | 2. H.L Bridge over Local Nala At Ch- 1.810 KM,L-38.760m, foundation Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. upto 3 m depth |
| 50 | Depth avobe 3m |
| 51 | RCC Gader M25 |
| 52 | PCC M15 |
| 53 | Supplyinn, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specification Clauses 1000 and 1202 |
| 54 | SUBSTRUCTURE Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 Height upto 5m RCC M25 |
| 55 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 Height upto 5m-10m RCC M25 |
| 56 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 RCC M30 |
| 57 | Supplying, fitting and placing TMT bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 58 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 59 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 -Granular material |
| 60 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 -Sandy material |
| 61 | Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 |
| 62 | Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. |
| 63 | SUPERSTRUCTURE Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 Height above 10m RCC Grade M 25 |
| 64 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 |
| 65 | Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 |
| 66 | Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 |
| 67 | Drainage Spouts complete as per drawing and Technical specification |
| 68 | P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 |
| 69 | Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification |
| 70 | Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.) |
| 71 | RIVER TRAINING AND PROTECTION WORKS -Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 Stone/Boulder |
| 72 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 |
| 73 | Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5 |
| 74 | APPROACH ROAD Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Manual Means |
| 75 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 |
| 76 | Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. |
| 77 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For grading- II Material |
| 78 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. WMM . |
| 79 | Providing and laying semi dense bituminous Concrete with 100-120 TPH batch type hot mixplant producing an average output of 75 tonnesper hour using crushed aggregate of specified grading, premixed with bituminous binder @ 4.5 to 5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tendem rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete as per Technical Specification.- SDBC |
| 80 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 81 | Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.2-1.5 kg/sqm using mechanical means as per Technical Specification Clause 502. |
| 82 | MISCELLANEOUS. Confirmatory Boring (in Soil and Rock) |
| 83 | Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1. |
| 84 | Retaining Wall of 2 m high - Earthwork in excavation in foudation trenches in ordinary soil vide classification of soil item -A) and disposal of earth as obtained to a distance upto 50m including all lifts, levelling, ramming the complete foundation trenches, removing roots of trees, |
| 85 | Providing PCC (M-150)(1:2:4) in foundataion as per MOSRT & H specification(4rth edition) |
| 86 | Providing rough dressed coursed stone masonry work in cement mortar (1:3) in foundation do -do all all complete job as per MOSRT & H specification |
| 87 | Providing rough dressed coursed stone masonry work in cement mortar (1:3) in substructure do -do all all complete job as per MOSRT & H specification |
| 88 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC M20 at top of retaining wall |
| 89 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 |
| 90 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications |
| 91 | Five Years Maintanace - For 1st Year |
| 92 | For 2nd Year |
| 93 | For 3rd Year |
| 94 | For 4th Year |
| 95 | For 5th Year |
| 96 | 3. Construction of H.L Bridge At Ch- 350 on Serka to Jalim via Hanrup, L-15.110m , Package No.- JH10MARS101 |
| 97 | Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means Depth upto 3m |
| 98 | Excavation for structures in ordinary Rock not requiring blasting (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means |
| 99 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification, (PCC Grade M15) Annular Filling |
| 100 | PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foudation and compacted by vibration including curing for 14 days.) |
| 101 | Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (RCC Grade M25 using batching plant,transit mixer & Concrete pump) |
| 102 | Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications |
| 103 | Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification |
| 104 | Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (RCC M25 using batching plant , transit mixer & concrete pump) Height Upto 5m |
| 105 | Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and technical specification. |
| 106 | Supplying , fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications |
| 107 | Providing and laying Filter material under pitching in slopes complete as per drawing and technical specification |
| 108 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications |
| 109 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 RCC M30 |
| 110 | Supplying , fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications |
| 111 | Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specification. |
| 112 | Construction of railing of M25 grade in-situ with 20mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specificatoins. |
| 113 | PCC M-15 Grade Levelling Course below Approach Slab complete as per drawing and Technical specification PCC Grade M15 using batching plant & Concrete pump |
| 114 | Approach Slab (M25 Grade) including reinforcement and formwork complete as per drawing and Technical specification. |
| 115 | Strip Seal Expansion Joint ( providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring complaince to the manufacturer's instructions for installation |
| 116 | Supplying, fitting and fixing in position true to line and level Elastomeric bearing confirming to IRC:83 (Part-II) section IX and clause 2005 of MORTH Specifications complete including all accessories as per drawing and technical specification. |
| 117 | Providing drainage spout complete as per drawing and technical specification |
| 118 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 |
| 119 | Construction of embankment with approved materials obtained from Borrow Pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading, to required slope and compacting to meet requirement of table 300-2. |
| 120 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. |
| 121 | Compacting original ground supporting embankment ( Rolling with vibratory roller) |
| 122 | Granular Sub- Base with coarse graded material (Table 400-2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared sruface, mixing by mix in place method with rotavatory at OMC, and compactiing with vibratory roller to achieve the desire density, complete as per clause 401) |
| 123 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 124 | Prime Coat (Providing and applying Primer Coat with bitumen emulsion on prepared surface of Granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means) |
| 125 | Providiing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. |
| 126 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 507 complete in all respects. |
| 127 | Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting) |
| 128 | Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Manual means. |
| 129 | Sand filling in foundation trenches as per Drawing and Technical specification |
| 130 | Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (PCC Grade M15 ) |
| 131 | Stone masonry work in cement mortar 1:3 for foundation complete as per drawing and technical specifications. |
| 132 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications. |
| 133 | Providing weep hole in Brick, masonary/Plain/Reinforced Cement Concrete abutment, wing wall/returnwall with 100mm dia AC pipe, extending through the full widt of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specification. |
| 134 | Pointing with cement mortar (1:3) on brickwork in substructure as per Technical specifications |
| 135 | Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (PCC garde M 20 ) For Coping |
| 136 | 5 YEAR MAINTENANCE WORKS 1ST YEAR |
| 137 | 2ND YEAR |
| 138 | 3RD YEAR |
| 139 | 4TH YEAR |
| 140 | 5TH YEAR |
| 141 | 4. Construction of H.L Bridge At Ch- 3700 on Serka to Jalim via Hanrup, L-51.370m , Package No.- JH10MARS102 |
| 142 | Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means Depth upto 3m |
| 143 | Excavation for structures in ordinary Rock not requiring blasting (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means |
| 144 | Providing and laying of PCC M15 levelling course 100 mm thick below the pile cap. PCC Grade M15 using batching plant & Concrete pump |
| 145 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification, (PCC Grade M15) Annular Filling |
| 146 | PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foudation and compacted by vibration including curing for 14 days.) |
| 147 | Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (RCC Grade M25 using batching plant,transit mixer & Concrete pump) |
| 148 | Providing Steel liner 10mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing |
| 149 | Bored cast-in-situ M35 grade RCC Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000m. (Pile diameter 1200mm) |
| 150 | Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications |
| 151 | Cement Concrete for Reinforced Concrete in Pile Cap complete as per drawing and Technical Specification (RCC Grade M30 using batching plant & Concrete pump) |
| 152 | Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification |
| 153 | Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (RCC M25 using batching plant , transit mixer & concrete pump) Height Upto 5m |
| 154 | Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and technical specification. |
| 155 | Supplying , fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications |
| 156 | Providing and laying Filter material under pitching in slopes complete as per drawing and technical specification |
| 157 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications |
| 158 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 RCC M30 |
| 159 | Supplying , fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications |
| 160 | Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specification. |
| 161 | Construction of railing of M25 grade in-situ with 20mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specificatoins. |
| 162 | PCC M-15 Grade Levelling Course below Approach Slab complete as per drawing and Technical specification PCC Grade M15 using batching plant & Concrete pump |
| 163 | Approach Slab M25 Grade) including reinforcement and formwork complete as per drawing and Technical specification. |
| 164 | Strip Seal Expansion Joint ( providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring complaince to the manufacturer's instructions for installation |
| 165 | Supplying, fitting and fixing in position true to line and level Elastomeric bearing confirming to IRC:83 (Part-II) section IX and clause 2005 of MORTH Specifications complete including all accessories as per drawing and technical specification. |
| 166 | Providing drainage spout complete as per drawing and technical specification |
| 167 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. |
| 168 | Construction of embankment with approved materials obtained from Borrow Pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading, to required slope and compacting to meet requirement of table 300-2. |
| 169 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. |
| 170 | Compacting original ground supporting embankment ( Rolling with vibratory roller) |
| 171 | Granular Sub- Base with coarse graded material (Table 400-2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared sruface, mixing by mix in place method with rotavatory at OMC, and compactiing with vibratory roller to achieve the desire density, complete as per clause 401) |
| 172 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 173 | Prime Coat (Providing and applying Primer Coat with bitumen emulsion on prepared surface of Granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means) |
| 174 | Providiing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. |
| 175 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 507 complete in all respects. |
| 176 | Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting) |
| 177 | Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Manual means. |
| 178 | Sand filling in foundation trenches as per Drawing and Technical specification |
| 179 | Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (PCC Grade M15 ) |
| 180 | Stone masonry work in cement mortar 1:3 for foundation complete as per drawing and technical specifications. |
| 181 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications. |
| 182 | Providing weep hole in Brick, masonary/Plain/Reinforced Cement Concrete abutment, wing wall/returnwall with 100mm dia AC pipe, extending through the full widt of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specification. |
| 183 | Pointing with cement mortar (1:3) on brickwork in substructure as per Technical specifications |
| 184 | Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (PCC garde M 20 ) For Coping |
| 185 | 5 YEAR MAINTENANCE WORKS 1ST YEAR |
| 186 | 2ND YEAR |
| 187 | 3RD YEAR |
| 188 | 4TH YEAR |
| 189 | 5TH YEAR |
| 190 | 5. Construction of H.L Bridge At Ch- 8155 on Serka to Jalim via Hanrup, L-31.460m , Package No.- JH10MARS103 |
| 191 | Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means Depth upto 3m |
| 192 | Excavation for structures in ordinary Rock not requiring blasting (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means |
| 193 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification, (PCC Grade M15) Annular Filling |
| 194 | PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foudation and compacted by vibration including curing for 14 days.) |
| 195 | Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (RCC Grade M25 using batching plant,transit mixer & Concrete pump) |
| 196 | Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications |
| 197 | Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification |
| 198 | Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (RCC M25 using batching plant , transit mixer & concrete pump) Height Upto 5m |
| 199 | Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and technical specification. |
| 200 | Supplying , fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications |
| 201 | Providing and laying Filter material under pitching in slopes complete as per drawing and technical specification |
| 202 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications |
| 203 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 RCC M30 |
| 204 | Supplying , fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications |
| 205 | Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specification. |
| 206 | Construction of railing of M25 grade in-situ with 20mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specificatoins. |
| 207 | PCC M-15 Grade Levelling Course below Approach Slab complete as per drawing and Technical specification PCC Grade M15 using batching plant & Concrete pump |
| 208 | Approach Slab (M25 Grade) including reinforcement and formwork complete as per drawing and Technical specification. |
| 209 | Strip Seal Expansion Joint ( providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring complaince to the manufacturer's instructions for installation |
| 210 | Supplying, fitting and fixing in position true to line and level Elastomeric bearing confirming to IRC:83 (Part-II) section IX and clause 2005 of MORTH Specifications complete including all accessories as per drawing and technical specification. |
| 211 | Providing drainage spout complete as per drawing and technical specification |
| 212 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. |
| 213 | Construction of embankment with approved materials obtained from Borrow Pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading, to required slope and compacting to meet requirement of table 300-2. |
| 214 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. |
| 215 | Compacting original ground supporting embankment ( Rolling with vibratory roller) |
| 216 | Granular Sub- Base with coarse graded material (Table 400-2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared sruface, mixing by mix in place method with rotavatory at OMC, and compactiing with vibratory roller to achieve the desire density, complete as per clause 401) |
| 217 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 218 | Prime Coat (Providing and applying Primer Coat with bitumen emulsion on prepared surface of Granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means) |
| 219 | Providiing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. |
| 220 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 507 complete in all respects. |
| 221 | Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting) |
| 222 | Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Manual means. |
| 223 | Sand filling in foundation trenches as per Drawing and Technical specification |
| 224 | Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (PCC Grade M15 ) |
| 225 | Stone masonry work in cement mortar 1:3 for foundation complete as per drawing and technical specifications. |
| 226 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications. |
| 227 | Providing weep hole in Brick, masonary/Plain/Reinforced Cement Concrete abutment, wing wall/returnwall with 100mm dia AC pipe, extending through the full widt of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specification. |
| 228 | Pointing with cement mortar (1:3) on brickwork in substructure as per Technical specifications |
| 229 | Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (PCC garde M 20 ) For Coping |
| 230 | 5 YEAR MAINTENANCE WORKS 1ST YEAR |
| 231 | 2ND YEAR |
| 232 | 3RD YEAR |
| 233 | 4TH YEAR |
| 234 | 5TH YEAR |
| 235 | GST @ 18% |
| 236 | Labour Cess @ 1% Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail