| 1 | Dismantlingplain cement or lime concrete work including stacking serviceable materials in countable stacks within 15M. lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 2 | Earth in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts, levelling ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, specification and direction of E/I. |
| 3 | Providing clean coarse sand in filling foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm think with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per specification and direction of E/I. (Mode of measurement compacted volume). |
| 4 | Providing designation 75B one brick flat soiling joints filled with local sand including cost of watering taxes, royalty all complete as per building specification and direction of E/I. |
| 5 | Reinforcment cement concrete work in wall(any thickness),Including attached pilaster ,buttresses,plinth and string course,fillets,columns,pillers ,piers all complete as per specification and direction of E/I. |
| 6 | Reinforcement cement concrete work in beams, suspended floors,roof having slope upto15 landing, balcony ,shelves,chajja,lintel,bands all complete as per specification and direction of E/I. |
| 7 | Providing Tor steel reinforcement of 8mm & 10mm dia bars cutting bending and binding with annealed wire with cost of wire, removal of roots, placing the rods in position as per approved disign and drawing all complete as per specification and direction of E/I. (10mm main bar) |
| 8 | 8 mm distribution bar |
| 9 | Providing centring and shuttering including strutting, propping etc. and removal of formwork for foundation , footing , base of column E/I |
| 10 | Filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered rammed, fully compacted and fine dressed with earth obtained from excavation of foundation treanches within a lead of 50M and lifts of 1.5M all complete as per specification and direction of E/I. |
| 11 | Carriage of Material (Stone Chips (lead upto 18 km)) |
| 12 | cement ( lead upto 2 km) |
| 13 | Sand ( lead upto 20 km) |
| 14 | Bricks (lead upto 30 km ) |
| 15 | 18 % gst |
| 16 | 1% labour cess |
| 17 | board and photo graphy Please Enable Macros to View BoQ information |