| 1 | Earth work in excavation in all type of strata comprising any of the materials such as soil, silt, sand, clay gravel, moorums of all varieties shingles. pebble all type of conglomerates, laterite rock, soft rock, disintegrated rock, fissured shattered, decomposed rock or weathered rock and all such other materials, as describe under appendix to those specifications either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling, wedging etc. excluding blasting in all conditions such as dry moist, saturated Submerged, foul conditions etc. including pumping or bailing out water, including setting out construction of shoring and bracing removal stumps and other deleterious matters, dressing of side and bottoms and back filling the excavated earths to the extent required and disposing the remaining excavated soil/rock as directed by Engineer in charge for all leads and in all lifts as specified and directed etc. complete. |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. |
| 3 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:a) All works upto plinth level |
| 4 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size)a) All works upto plinth level |
| 5 | b)In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level |
| 6 | c)In beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases upto floor five level |
| 7 | Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. |
| 8 | Centering & shuttering including Strutting, Propping & removal of forms for :i) Foundations, Footings, Bases for columns |
| 9 | ii)Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like |
| 10 | xiii) Suspended floors, roofs landings, shelves & their supports |
| 11 | Providing construction joints with 20mm thick thermacol sheets including cutting and placing in position etc. complete as per direction of Engineer in charge. |
| 12 | Providing and fixing weep holes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in chargea) 110 mm dia |
| 13 | Providing and fixing 40 mm dia G.I. Pipe railing in 3 rows complete with G.I. Fittings incl. Painting of pipes and fittings with white paint of approved quality incl. A priming coat with a ready mixed primer for new works incl. Providing R.C.C. 1:2:4 rail posts of size 0.15 x 0.15 x 1.00 M with base of 0.25 x 0.25 x 0.3 m at every 2 mts intervals and double rail post with a bar drawings inclusive of cost of reinforcement etc. all complete including white wash washing of rail posts etc. all complete. Please Enable Macros to View BoQ information |