|
| 1 | Clearing and grubbing road land including uprooting wild vegetation ,grass ,bushes,shrubs,sapling and trees of girth up to 300 mm |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5( For carted earth) |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 4 | WBM Grading -3 -Providing laying , spreding and compacting stone aggregate of 22.4-53mm size to water bound macadam specification including spreading in uniform thickness ,hand packing . Rolling with smooth whell roller 80-100 kn in stage to proper grade and camber ,applying and brooming ,stone screening to fill up the interstices of coarse aggregate ,watering and compacting to required density as per technical specification Clause 405. |
| 5 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry |
| 6 | Construction of unreinforced ,dowel jointed at expension construction joint only,plain cement concrete pavement,thickness as per design ,over a prepared subbase with 43 grade cement or any other type as per clause 1501.2.2 M30 GRADE ,coarse and fine aggregate conferming to IS:383,maximum size of coarse aggregate not exceeding 25 mm,mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weight bathcher using approved mixed design, laid in approved fixed side form work(steel channel ,laying and fixing of 125micron thick polytheen film, wedges,steel plate including levelling the form work),spreeding the cincrete with shovel,rakes ,compacted using needles,screed and plate vibrator and finished in continous operation including provision of contraction and expansion,construction joint,applyinf debonding streips ,primer,sealants,dowel bars near approaches to bridge/culvert and construction joint ,admixtures as approved,curing of concrete slab for 14th day curing (where specified) and water finshing to lines and grade as per drawing and technical specfication clause 1501 |
| 7 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5( For carted earth) |
| 8 | Supply & Fixing of Sign Board & etc. Please Enable Macros to View BoQ information |