| 1 | Carriage of following Material from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 2 | PCC POLE 8.5 MTR.LONG |
| 3 | 11 MTR ST Pole |
| 4 | STAY Set COMPLETE |
| 5 | A.C.S.R. Rabbit Cunductor |
| 6 | 3*185mm ^2 11 Kv XLPE Cable |
| 7 | 11 KV Fuse Set |
| 8 | 11 KV V type Cross Arm 65*65*6mm |
| 9 | F Bracket |
| 10 | E Bracket |
| 11 | EARTHING COMPLETE |
| 12 | Top Channel 125*65mm, 2240mm with clamp |
| 13 | MS Dropper Channel |
| 14 | T -off Channel |
| 15 | Cross Bracing MS Angle |
| 16 | MS Guarding Angle |
| 17 | GI Wire 8 swg |
| 18 | Supply & Erection of Following Material as per UPPCL/DVVNL/RESPO Norms and Standard/Related IS |
| 19 | Stone Pad |
| 20 | X Arm Holding Clamp for PCC |
| 21 | Bolt, Nut & Washer etc. Suitable Size |
| 22 | PG clamps |
| 23 | Danger Board with nut & bolt |
| 24 | Clamps for Top & Dropper with Nut Bolt |
| 25 | 11 KV PIN INSULATOR With GI Pin |
| 26 | 11 KV PIN with Nut |
| 27 | 11 KV DISC INSULATOR (T&C) 45 KN |
| 28 | 11 KV DISC Fiting 45 KN |
| 29 | Loop INSULATOR |
| 30 | Jointing Kit 3*120 o/d & I/d |
| 31 | Erection of Following Material including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. (With proper Earthing.) |
| 32 | Erection of PCC Pole 8.5 Mtr Long including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 33 | Grouting of PCC Pole 8.5 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 34 | Grouting of STP Pole 11 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 35 | Grouting of STP Pole 11 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 36 | Fixing of Stay Rod and its erection. Stay wire should be properly binded and tightened as per Standard Specification. |
| 37 | Grouting of stay set as per RESPO manual and also including the cost of all grouting material, labour, T & P etc. required for proper completion of work. |
| 38 | Laying, Sagging, Stringing, Binding and Jumpering etc. of A.C.S.R. Rabbit Cunductor on the newly erected pole/ old pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 39 | Laying, Digging, Sagging, Stringing, Binding and Jumpering etc. of 3*185mm ^2 11 Kv XLPE Cable on the Air/Underground as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 40 | 11 KV Fuse Set |
| 41 | 11 KV V type Cross Arm 65*65*6mm |
| 42 | F Bracket |
| 43 | E Bracket |
| 44 | EARTHING COMPLETE |
| 45 | Top Channel 125*65mm, 2240mm with clamp |
| 46 | MS Dropper Channel |
| 47 | T -off Channel |
| 48 | Cross Bracing MS Angle |
| 49 | MS Guarding Angle |
| 50 | GI Wire 8 swg Please Enable Macros to View BoQ information |