| 1 | Roughning surfaces of old concrete floor by picking, sweeping cleaning and washing down with water to remove dust etc complete all as specified and directed. |
| 2 | Material and labour for moorum/red bajri filling under floors or pavings, laid in layers n exc 15 cm thick including watering complete all as specified and directed. |
| 3 | Material and labour for hard core of broken stone or boulders not exceeding 63 mm , deposited, spreaded and levelled in layers n exc 15cm thick, watered and rammed to a true surfaces complete all as specified and directed. |
| 4 | Material and labour for 75 mm thick cement concrete 1:4:8 type D-2 (40 mm graded stone aggregate ) as in sub base. |
| 5 | Material and labour for 40 mm thick cement concrete 1:2:4 type B-1 ( using 20 mm graded stone aggregate) as in sub coarse complete all as specified and directed. |
| 6 | Material and labour for 40 mm to 50 mm thick kota stone of size 600 mm x 600 mm laid and jointed with grey cement and pigment to match the colour of the slab including cutting , Rubbing and mirror polishing with and including 20 mm thick screed bed in cement mortar 1:6 complete all as specified and directed. |
| 7 | Material and labour for 20 mm to 25 mm thick kota stone as on skirting or vertical surfaces mirror polished laid and jointed with grey cement and pigment to match the colour of the slab including cutting , rubbing and polishing with and including 10 mm thick backing coat in cement mortar 1:4 on vertical surfaces of wall complete all as specified and directed. |
| 8 | Demolition of brick work or stone boulders masonary built in cement mortar including all quoins, arches, pillers etc complete all as specified and directed by Engineer-in-Charge. |
| 9 | Material and labour for brick work with fly ash old size bricks, straight or curved on plane exc 6 mtr mean radius built in cement mortar 1:6 complete all as specified and directed. |
| 10 | Taking down cement plaster of any description thickness including raking out joints hacking for key scrubbing down with water complete all as specified and directed. |
| 11 | Material and labour for cement plaster 15 mm thick in cm 1:4 on fair faces brick work or concrete surfaces complete all as specified and directed. |
| 12 | Material and labour for preparation of new surfaces of walls including cornices, plasters etc (Plastered or unplastered surfaces) and applying three coats of white (lime) wash complete all as specified and directed. |
| 13 | Material and labour for preparation of old surfaces including scraping down smoke soots, moulds, moss and trading oil and greasy spots etc including cornices, plasters etc (Plastered or unplastered surfaces) and applying one coat of white (lime) wash complete all as specified and directed. |
| 14 | Demolition of cement concrete as in ground floors and paving n exc 15 cm thick (below or above the ground level) complete all as specified and directed. |
| 15 | Material and labour for PCC 1:2:4 type B-1 (20 mm graded stone aggregate) , 100 mm thick as in path, floor, parking etc construction joint after every 2 mtr interval and from wall will be filled by mastic complete all as specified and directed. |
| 16 | Spike rolling to surfaces or making impression of expanded metal whilest the concrete is green complete all as specified and directed. Please Enable Macros to View BoQ information |