|
| 1 | Carriage of following Material from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 2 | PCC POLE 8.5 MTR.LONG |
| 3 | ABC Cable 3*120mm |
| 4 | ABC Cable (3*95+1*70+1*16)mm^2 |
| 5 | LT ABC Cable 3.5*150mm^2 |
| 6 | LT ABC Cable 3.*50+1*35+1*16 sqmm |
| 7 | AB Cable 1*25+1*16 sqmm |
| 8 | STAY SET COMPLETE |
| 9 | EARTHING COMPLETE |
| 10 | Supply & Erection of Following Material as per UPPCL/DVVNL/RESPO Norms and Standard/Related IS |
| 11 | 3 Phase LT DISTRIBUTION BOX |
| 12 | 1 Phase LT DISTRIBUTION BOX |
| 13 | D B Clamp |
| 14 | LT PIERCING CONNECTOR |
| 15 | Stone PAD |
| 16 | Suspension Clamp |
| 17 | LOOP INSULATOR |
| 18 | CONNECTING LEAD 1*16sqmm |
| 19 | DEAD END CLAMP |
| 20 | I Hook |
| 21 | I Hook Clamp |
| 22 | NUT, BOLT & WASHER, Etc.. |
| 23 | Erection of Following Material including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. (With proper Earthing.) |
| 24 | Erection of PCC Pole 8.5 Mtr Long including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 25 | Grouting of PCC Pole 8.5 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 26 | Fixing of Stay Rod and its erection. Stay wire should be properly binded and tightened as per Standard Specification. |
| 27 | Grouting of stay set as per RESPO manual and also including the cost of all grouting material, labour, T & P etc. required for proper completion of work. |
| 28 | Laying, Sagging, Stringing, Binding and Jumpering etc. of ABC Cable 3*120mm on the newly erected pole/ old pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 29 | Laying, Sagging, Stringing, Binding and Jumpering etc. of ABC Cable (3*95+1*70+1*16)mm^2 on the newly erected pole/ old pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 30 | Laying, Sagging, Stringing, Binding and Jumpering etc. of LT ABC Cable 3.5*150mm^2 on the newly erected pole/ old pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 31 | Laying, Sagging, Stringing, Binding and Jumpering etc. of LT ABC Cable 3.*50+1*35+1*16 sqmm on the newly erected pole/ old pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 32 | Laying, Sagging, Stringing, Binding and Jumpering etc. of AB Cable 1*25+1*16 sqmm on the newly erected pole/ old pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 33 | EARTHING COMPLETE |
| 34 | Dismantling of existing 33 KV line and removal of all accessories & fittings from poles, re-rolling of conductor and proper stacking and Cartage of dismantled conductor & accessories from site of work to DVVNL, Store. Please Enable Macros to View BoQ information |