| 1 | Carriage of following Material from store center or from any other place to the respective site of work Distence up to 75 km through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 2 | PCC 11 MTR LONG |
| 3 | PCC 9 MTR LONG |
| 4 | ACSR DOG CONDUCTOR |
| 5 | STP 13 MTR LONG |
| 6 | STP 11 MTR LONG |
| 7 | MS ANGLE IRON 65*65*6*4300mm BRACING WITH CLAMP |
| 8 | TOP CHANNEL 33 KV |
| 9 | EARTHING COMPLETE |
| 10 | STAY Set COMPLETE |
| 11 | GUARDING ANGLE |
| 12 | GUARDING ANGLE CLAMP |
| 13 | GI WIRE 6 swg |
| 14 | GI WIRE 8 swg |
| 15 | 33 KV 3*120sqmm XLPE CABLE |
| 16 | 33 KV CROSS ARM HOLDING CLAMP |
| 17 | F CLAMP 33 KV FOR STP |
| 18 | 33 KV V TYPE CROSS ARM |
| 19 | Supply & Erection of Following Material as per UPPCL/DVVNL/RESPO Norms and Standard/Related IS |
| 20 | STONE PAD |
| 21 | LOOP INSULATOR |
| 22 | NUMBER PALTE WITH CLAMP NUT BOLT |
| 23 | DANGER BOARD WITH CLAMP NUT BOLT |
| 24 | 33 KV DISC INSULAOTOR |
| 25 | 33 KV DISC FITING |
| 26 | 33 KV PIN INSULTOR |
| 27 | 33 KV PIN WITH NUT & BOLT |
| 28 | ALUMINIUM PAINT |
| 29 | RED OXIDE PAINT |
| 30 | NUT & BOLT ALL SIZE |
| 31 | EARTH WIRE CLAMP WITH NUT & BOLT |
| 32 | ALL WINDING WIRE 6swg |
| 33 | PG CLAMP |
| 34 | HDPE PIPE 120mm |
| 35 | 33 KV 3*120sqmm XLPE CABLE BOX OUTDOOR |
| 36 | Erection of Following Material including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. (With proper Earthing.) |
| 37 | Erection of PCC Pole 9/11 Mtr Long including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 38 | Grouting of PCC Pole 9/11 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 39 | Erection of S.T.P Pole 11/13 Mtr Long including the work of complete H.T. fittings as per RESPO manual and as per direction of engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 40 | Grouting of STP Pole 11/13 Mtr Long as per RESPO Norms ( Cement, Sand , Blast Stone with the ration 1:4:8 will be provided by contractor ) |
| 41 | Fixing of Stay Rod and its erection. Stay wire should be properly binded and tightened as per Standard Specification. |
| 42 | Grouting of stay set as per RESPO manual and also including the cost of all grouting material, labour, T & P etc. required for proper completion of work. |
| 43 | Laying, Sagging, Stringing, Binding and Jumpering etc. of ACSR Dog Conductor on the newly erected pole/ old pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 44 | Laying, Digging, Sagging, Stringing, Binding and Jumpering etc. of 33 KV 3*300 XLPE Cable on the Air/underground and Road Crossing as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work. |
| 45 | MS ANGLE IRON 65*65*6*4300mm BRACING WITH CLAMP |
| 46 | TOP CHANNEL 33 KV |
| 47 | EARTHING COMPLETE |
| 48 | GUARDING ANGLE |
| 49 | GUARDING ANGLE CLAMP |
| 50 | GI WIRE 6 swg |
| 51 | GI WIRE 8 swg |
| 52 | 33 KV CROSS ARM HOLDING CLAMP |
| 53 | F CLAMP 33 KV FOR STP |
| 54 | 33 KV V TYPE CROSS ARM |
| 55 | Dismantling of existing 33 KV line and removal of all accessories & fittings from poles, re-rolling of conductor and proper stacking and Cartage of dismantled conductor & accessories from site of work to DVVNL, Store. Please Enable Macros to View BoQ information |