|
| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Submersible pumpset-1 H.p |
| 3 | Submersible pumpset-2 H.p |
| 4 | Submersible pumpset-3 H.p |
| 5 | Submersible pumpset-5 H.p |
| 6 | Submersible pumpset-7.5 H.p |
| 7 | Removing of Submersible pump for repairs |
| 8 | Transportation of pumset from W.S to for repairs |
| 9 | Dimentating of Submersible pump |
| 10 | Rewinding of 1 H.P motor |
| 11 | Rewinding of 2 H.P motor |
| 12 | Rewinding of 3 H.P motor |
| 13 | Rewinding of 5 H.P motor |
| 14 | Submersible pumpset-7.5 H.p |
| 15 | Repairs to motor with using new upper & lower housing bush besring thrust platr new rotoring etc. complate |
| 16 | Repairs to pump with replacement of bush sleeves impellers guide vanes pump shaft & complate overhauling |
| 17 | Assembling of pump |
| 18 | Transportation of pumset after repairs |
| 19 | Rainstallation of pump after repairs at sute with giving trial |
| 20 | Rapairs of starter of 1 H.P |
| 21 | Rapairs of starter of 2 H.P |
| 22 | Rapairs of starter of 3 H.P |
| 23 | Rapairs of starter of 5 H.P |
| 24 | Submersible pumpset-7.5 H.p |
| 25 | Submersible pumpset-20 H.p |
| 26 | Removing of Submersible pump for repairs |
| 27 | Transportation of pumpset from W.S to for repairs |
| 28 | Dimentating of pump |
| 29 | Rewinding of 20 H.P motor |
| 30 | Rewinding of 10 H.P motor |
| 31 | Bearing of 20 H.P motor |
| 32 | Bearing of 10 H.P motor |
| 33 | Repairs to motor with using new upper & lower hosing bush besring thrust plate new rotoring etc. complate |
| 34 | Repairs to pump with replacement of bush sleeves impellers guide vanes pump shaft & complate overhauling |
| 35 | Assembling of pump |
| 36 | Transporation of pumpset after repairs |
| 37 | Reinstallation of pump after repairs at site with giving trial |
| 38 | Repairs of starter of 20 H.P |
| 39 | Repairs of starter of 10 H.P |
| 40 | Pumpset - 40 HP |
| 41 | Removing of pump for repairs |
| 42 | Transportation of pumset from W.S to for repairs |
| 43 | Dismentling of pump |
| 44 | Rewinding of 40 H.P Motor |
| 45 | Repairs to motor with replacement of bearing shaft truing |
| 46 | Repaire to centrifugal pump by fitting of impeller shaft fitting of bronze sleeve & over hauling |
| 47 | reassembling of pump |
| 48 | reassembling of Motor |
| 49 | Transportation of pump set from W.S to for repairs |
| 50 | Reinstallation of pump after repairs at site |
| 51 | Replasment of bearing |
| 52 | Couple Set |
| 53 | Neck Ring |
| 54 | Impaller |
| 55 | Connection Plate |
| 56 | Main shaft |
| 57 | pumpset - 50 HP |
| 58 | Removing of submersible pump for repairs |
| 59 | Transportation of pumset from W.S to for repairs |
| 60 | Dismentaling of pump |
| 61 | Rewinding of 50 H.P Motor |
| 62 | Repairs to motor with replacement of bearing shaft truing |
| 63 | Repaire to centrifugal pump by fitting of impeller shaft fitting of bronze sleeve & over hauling |
| 64 | Reassembling of pump |
| 65 | Reassembling of Motor |
| 66 | Transportation of pimpset from W.S to for repairs |
| 67 | Reinstallation of pump after repairs at site |
| 68 | Replasment of bearing |
| 69 | Couple Set |
| 70 | Bearing |
| 71 | Neck Ring |
| 72 | Impaller |
| 73 | Main shaft |
| 74 | Connection Plate |
| 75 | Pumpset & Moter - 100 H.P |
| 76 | Removing the pumpset |
| 77 | Transportation of pumset from W.S to for repairs |
| 78 | Dismenting of pump |
| 79 | Rewinding of 100 H.P Motor |
| 80 | Motor upper Bearing |
| 81 | Motor lower Bearing |
| 82 | Repairs to motor with replacement of bearing shaft truing |
| 83 | Repaire to pump by fitting of impeller shaft fitting of bronze sleeve & over hauling |
| 84 | reassembling of pump |
| 85 | reassembling of Motor |
| 86 | Transportation of pimpset from W.S to for repairs |
| 87 | Reinstallation of pump after repairs at site |
| 88 | Replasment of bearing |
| 89 | TT Plate |
| 90 | Spider Bush |
| 91 | Shaft Coupling |
| 92 | Top main motor shaft as per old sample |
| 93 | Coloum pipe line shaft as per old sample |
| 94 | Spider Guide |
| 95 | silve |
| 96 | Reducer coupling |
| 97 | Bowl assembly shaft (Main) |
| 98 | Neck Ring |
| 99 | Ippeller |
| 100 | Bowl Bush |
| 101 | TT Plate Bush |
| 102 | Rotar Bearing sheet |
| 103 | Rotar machining &through |
| 104 | S.S. Nut Bolt |
| 105 | Rubber sheet |
| 106 | connection plate 100 hp motor |
| 107 | connection plate 50 hp motor |
| 108 | connection plate 40 hp motor |
| 109 | Pumpset & Mote - 150 H.P |
| 110 | Removing the pumpset |
| 111 | Transportation of pumset from W.S to for repairs |
| 112 | Dimentating of pump |
| 113 | Rewinding of 150 H.P Motor |
| 114 | Motor upper Bearing |
| 115 | Motor lower Bearing |
| 116 | Repairs to motor with replacement of bearing shaft truing |
| 117 | Repaire to pump by fitting of impeller shaft fitting of bronze sleeve & over hauling |
| 118 | reassembling of pump |
| 119 | reassembling of Motor |
| 120 | Transportation of pimpset from W.S to for repairs |
| 121 | Reinstallation of pump after repairs at site |
| 122 | Replasment of bearing |
| 123 | TT Plate |
| 124 | Spider Bush |
| 125 | Shaft Coupling |
| 126 | Top main motor shaft as per old sample |
| 127 | Coloum pipe line shaft as per old sample |
| 128 | Spider Guide |
| 129 | silve |
| 130 | Reducer coupling |
| 131 | Bowl assembly shaft (Main) |
| 132 | Neck Ring |
| 133 | Ippeller |
| 134 | Bowl Bush |
| 135 | TT Plate Bush |
| 136 | Rotar Bearing sheet |
| 137 | Rotar machining &through |
| 138 | S.S. Nut Bolt |
| 139 | Rubber sheet |
| 140 | connection plate 150 hp motor |
| 141 | Highlight Paper |
| 142 | Bridge Gear Box |
| 143 | Removing of Gear Box for repairs |
| 144 | Transportation of Gear Box to W.S for repairs |
| 145 | repairs to Gear Box by raplacement of gears,ball bearing & using other materail with ovehulling etc. |
| 146 | Rewinding of gear box motor |
| 147 | Repairs to motor with raplacement of bearing varnishing etc. |
| 148 | Assmbling of gear box |
| 149 | Transportation of Gear Box from W.S to site after |
| 150 | Reinstallation of gear box |
| 151 | Gear Box |
| 152 | Warm Gear |
| 153 | Pinion Gear |
| 154 | Bewel Gear |
| 155 | Bearing |
| 156 | Fluculater Bearing |
| 157 | Oil Seal |
| 158 | Nut Bolt |
| 159 | Slip Ring |
| 160 | Carbon Brush |
| 161 | Armod Cable 4 core |
| 162 | Chain |
| 163 | Couple Pully |
| 164 | Roller Machining |
| 165 | Removing the motor |
| 166 | 3 H.P submarsibal motor pump |
| 167 | 5 H.P submarsibal motor pump |
| 168 | 7.5 H.P submarsibal motor pump |
| 169 | 10 H.Psubmarsibal motor pump |
| 170 | 15 H.P submarsibal motor pump |
| 171 | 20 H.P submarsibal motor pump |
| 172 | Transportation of motor from W.S to for repairs |
| 173 | Rewinding of motor |
| 174 | 3 H.P motor |
| 175 | 5 H.P Motor |
| 176 | 7.5 H.P motor |
| 177 | 10 H.P motor |
| 178 | 15 H.P motor |
| 179 | 20 H.P motor |
| 180 | Providing & fitting of bearing to motor |
| 181 | 3 H.P motor |
| 182 | 5 H.P Motor |
| 183 | 7.5 H.P motor |
| 184 | 10 H.P motor |
| 185 | 15.H.P motor |
| 186 | 20.H.P motor |
| 187 | Transportation of motor from W.S to for repairs |
| 188 | 3 H.P motor |
| 189 | 5 H.P Motor |
| 190 | 7.5 H.P motor |
| 191 | 10 H.P motor |
| 192 | 15 H.P motor |
| 193 | 20 H.P motor |
| 194 | New Starters |
| 195 | 3 H.P Starters |
| 196 | 5 H.P Starters |
| 197 | 7.5 H.P Starters |
| 198 | 10 H.P Starters |
| 199 | 15 H.P Starters |
| 200 | 20 H.P Starters |
| 201 | Contractor for Starter |
| 202 | M L 6 |
| 203 | M L 10 |
| 204 | Spares required like contract kit etc. |
| 205 | Relay |
| 206 | M.L. 3 |
| 207 | Repairs of starter 40 H.P |
| 208 | Checking of starter & detecting fauit in it |
| 209 | Transportation charges |
| 210 | providing & fitting fix and moving contact |
| 211 | Providing & Fitting Base contact |
| 212 | Providing & Fitting Base plate |
| 213 | Providing & Fitting Auxillary Switch |
| 214 | Providing & Fitting current Strip |
| 215 | Transportation charges |
| 216 | Complete power & control rewiring of starter |
| 217 | Timer |
| 218 | Realy |
| 219 | Starter Transformer rewinding |
| 220 | Repairs of starter 50 H.P |
| 221 | Checking of starter & detecting fauit in it |
| 222 | Transportation charges |
| 223 | providing & fitting fix and moving contact |
| 224 | Providing & Fitting Base contact |
| 225 | Providing & Fitting Base plate |
| 226 | Providing & Fitting Auxillary Switch |
| 227 | Providing & Fitting current Strip |
| 228 | Transportation charges |
| 229 | Complete power & control rewiring of starter |
| 230 | Timer |
| 231 | Realy |
| 232 | Starter Transformer rewinding |
| 233 | Repairs of starter 100 H.P |
| 234 | Checking of starter & detecting fauit in it |
| 235 | Transportation charges |
| 236 | providing & fitting fix and moving contact |
| 237 | Providing & Fitting Base contact |
| 238 | Providing & Fitting Base plate |
| 239 | Providing & Fitting Auxillary Switch |
| 240 | Providing & Fitting current Strip |
| 241 | Transportation charges |
| 242 | Complete power & control rewiring of starter |
| 243 | Timer |
| 244 | Realy |
| 245 | Starter Transformer rewinding |
| 246 | Repairs of starter 150 H.P |
| 247 | Checking of starter & detecting fauit in it |
| 248 | Transportation charges |
| 249 | providing & fitting fix and moving contact |
| 250 | Providing & Fitting Base contact |
| 251 | Providing & Fitting Base plate |
| 252 | Providing & Fitting Auxillary Switch |
| 253 | Providing & Fitting current Strip |
| 254 | Transportation charges |
| 255 | Complete power & control rewiring of starter |
| 256 | Timer |
| 257 | Realy |
| 258 | Starter Transformer rewinding |
| 259 | service cable |
| 260 | Submersible Cable Flat Flexible 3- core |
| 261 | 1.5 Sqmm |
| 262 | 2.5 Sqmm |
| 263 | 4.00 Sqmm |
| 264 | Submersible Pump & Other |
| 265 | Providing fixing erection and testing of Submersible Pump with complete panel box for 1 H.p |
| 266 | Providing fixing erection and testing of Submersible Pump with complete panel box for 3 H.p |
| 267 | Providing fixing erection and testing of Submersible Pump with complete panel box for 5 H.p |
| 268 | Providing fixing erection and testing of Submersible Pump with complete panel box for 10 H.p |
| 269 | Removing the Pumpset |
| 270 | Transfpemer Oil |
| 271 | Copper Lugs dowels |
| 272 | Copper Lugs dowels |
| 273 | Copper Lugs dowels |
| 274 | Ismal Crimping tool |
| 275 | Grease gun |
| 276 | Box Spanner set |
| 277 | Flat Spanner set |
| 278 | Hand glouse for previntion of Electricity |
| 279 | 40 H.P Starter |
| 280 | Provinding and fixing magnet coil |
| 281 | Provinding and fixing SCTR relay |
| 282 | Provinding and fixing Timer |
| 283 | Provinding and fixing Current bar Clamp |
| 284 | 1KVAR Capacitar |
| 285 | 250 AMP MCCB |
| 286 | Armoured Cable 185 SQ.mm |
| 287 | ML1.5 Contactor |
| 288 | ML1.5 Contact Kit |
| 289 | ML 4 Contactor |
| 290 | ML4 Contact Kit |
| 291 | ML 6 Contactor |
| 292 | ML 6 Contact |
| 293 | Relay For 40 HP |
| 294 | HRC Fuse Unit 315 A |
| 295 | Love Joy Coupling 110 No |
| 296 | Love Joy Coupling 100 No |
| 297 | Love Joy Coupling 95 No |
| 298 | Love Joy Coupling 250 No |
| 299 | Love Joy Coupling 200 No |
| 300 | Start Coupling 110 |
| 301 | Start Coupling 100 No |
| 302 | Start Coupling 95 |
| 303 | Start Coupling 250 |
| 304 | Start Coupling 200 No |
| 305 | Main swith 16 A |
| 306 | Main swith 32 A |
| 307 | Main swith 63 A |
| 308 | Main swith 100 A |
| 309 | Main swith 300 A |
| 310 | Main swith 400 A |
| 311 | Main swith 500 A |
| 312 | Kit kat 16 A |
| 313 | Kit kat 32 A |
| 314 | Kit kat 63 A |
| 315 | Kit kat 100 A |
| 316 | Kit kat 200 A |
| 317 | Starter MKLDOL |
| 318 | Starter staedelta 10 H.P |
| 319 | Starter staedelta 20 H.P |
| 320 | Water level Gerd cum singal phasing preventor |
| 321 | 300 amp MCCB |
| 322 | 200 amp MCCB |
| 323 | 400 amp MCCB |
| 324 | 500 amp MCCB |
| 325 | Monoblock submersible repair 5 H.P |
| 326 | Removing |
| 327 | Transpoetaion before repair |
| 328 | Dimentating of pump |
| 329 | revinding of pump |
| 330 | Repairs to pump with raplacement of bush sleeves |
| 331 | Assembling of pump |
| 332 | Transportaion after repairs of pump |
| 333 | Reinstallation of pump after repairs at site with giving trial |
| 334 | Revinding & repair of transformer Cap.315 KVA oil cap. 320Ltrs. |
| 335 | 150 KG Rewinding of H.V. coils with new sw |
| 336 | 91.50 KG Reinstallation of L.V. coils |
| 337 | Labour charges |
| 338 | Complete spray painting |
| 339 | insulation materials |
| 340 | Oven heating |
| 341 | Breather |
| 342 | L.V. Road brass |
| 343 | 420 LIT Transformer new oil |
| 344 | Explosion vent |
| 345 | Oil level indicator |
| 346 | Transformer hair charges for repair period |
| 347 | Transportation charges with lpading, Unloading & instalation of transformer |
| 348 | Revinding & repair of transformer Cap.500 KVA oil cap. 460Ltrs. |
| 349 | 150 KG Rewinding of H.V. coils with new sw |
| 350 | 91.50 KG Reinstallation of L.V. coils |
| 351 | Labour charges |
| 352 | Complete spray painting |
| 353 | insulation materials |
| 354 | Oven heating |
| 355 | Breather |
| 356 | L.V. Road brass |
| 357 | 420 LIT Transformer new oil |
| 358 | Explosion vent |
| 359 | Oil level indicator |
| 360 | Transformer hair charges for repair period |
| 361 | Transportation charges with lpading, Unloading & instalation of transformer |
| 362 | Monoblock submersible repair 7.5 H.P |
| 363 | Removing |
| 364 | Transportaion before repairs |
| 365 | Dismentaling of pump |
| 366 | revinding of pump |
| 367 | Repearing to pump with replacement of bush, sleeves, impellers thrust plate etc. |
| 368 | Assembling of pump |
| 369 | Transportaion after repairs of pump |
| 370 | Reinstallation of pump after repair at site with giving trial |
| 371 | Monoblock submersible repair 10 H.P |
| 372 | Removing |
| 373 | Transportaion before repairs |
| 374 | Dismentaling of pump |
| 375 | revinding of pump |
| 376 | Repearing to pump with replacement of bush, sleeves, impellers thrust plate etc. |
| 377 | Assembling of pump |
| 378 | Transportaion after repairs of pump |
| 379 | Reinstallation of pump after repair at site with giving trial |
| 380 | Blower |
| 381 | Moter Pully |
| 382 | Blower Pully |
| 383 | Moter Rewinding |
| 384 | Moter Bearing |
| 385 | Blower Bearing |
| 386 | Oil seal |
| 387 | Stainer |
| 388 | Filter |
| 389 | APFC Panal |
| 390 | 01KVR Capaciter |
| 391 | Apfc Main Controller |
| 392 | Duty Contactor |
| 393 | MCCB 1000 Amp |
| 394 | MCCB 800 Amp |
| 395 | MCCB 630 Amp |
| 396 | MCCB 500 Amp |
| 397 | MCCB 400 Amp |
| 398 | MCCB 250 Amp |
| 399 | MCCB 150 Amp |
| 400 | MCCB 63 Amp |
| 401 | MCCB 40 Amp |
| 402 | MCCB 32 Amp |
| 403 | MCCB 25 Amp |
| 404 | MCCB 20 Amp |
| 405 | MCCB 16 Amp |
| 406 | Trobal switch |
| 407 | Change over |
| 408 | Primarycontactor |
| 409 | secondary contactor |
| 410 | Main delta contactor |
| 411 | Auxillary contactor |
| 412 | timer |
| 413 | Fuse cannector |
| 414 | MCB cannector |
| 415 | ATS Transformer |
| 416 | ATS Rewinding |
| 417 | ATS Coil |
| 418 | Voltage meter |
| 419 | Amper meter |
| 420 | ON/OFF push batton |
| 421 | R Y B G Indicator |
| 422 | Realy Thermal |
| 423 | Control Wiring |
| 424 | Basbar Aiuminium |
| 425 | Basbar Copper |
| 426 | Encloser box |
| 427 | Mpr D2 Please Enable Macros to View BoQ information |