| 1 | PCC Pole 9.00 Mtr Long | PCC Pole 9.00 Mtr Long |
| 2 | PCC Pole 8.5 Mtr Long | PCC Pole 8.5 Mtr Long |
| 3 | ST Pole 11 Mtr Long | ST Pole 11 Mtr Long |
| 4 | 33 KV XLPE Cable 3X300 SQ MM | 33 KV XLPE Cable 3X300 SQ MM |
| 5 | 33 KV XLPE Cable 3X300 SQ MM Jonting Kit(Outdoor/Indoor) | 33 KV XLPE Cable 3X300 SQ MM Jonting Kit(Outdoor/Indoor) |
| 6 | Safe cartage of line material viz. conductor, cable, GI earth wire, cross arm, angle, channel, insulator and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. | Safe cartage of line material viz. conductor, cable, GI earth wire, cross arm, angle, channel, insulator and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. |
| 7 | Erection of 9.00 Mtr. Single PCC Pole including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Erection of 9.00 Mtr. Single PCC Pole including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 8 | Grouting of 9.00 Mtr. Single PCC Pole per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (All Civil Material shall be arranged by contractor on his own cost) | Grouting of 9.00 Mtr. Single PCC Pole per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (All Civil Material shall be arranged by contractor on his own cost) |
| 9 | Erection of 8.5 Mtr. Single PCC Pole including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Erection of 8.5 Mtr. Single PCC Pole including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 10 | Grouting of 8.5 Mtr. Single PCC Pole per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (All Civil Material shall be arranged by contractor on his own cost) | Grouting of 8.5 Mtr. Single PCC Pole per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (All Civil Material shall be arranged by contractor on his own cost) |
| 11 | Erection of Double-Pole including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Erection of Double-Pole including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 12 | Grouting of Double-Pole as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (All Civil Material shall be arranged by contractor on his own cost) | Grouting of Double-Pole as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (All Civil Material shall be arranged by contractor on his own cost) |
| 13 | ARRANGEMENT OF ROOM (5*5*5QFT WITH DOUBLE M.S.ANGLE 6FT) FOR RISER OF BOTH SIDE CABLE as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Material Arrange by the contractor on his own cost) | ARRANGEMENT OF ROOM (5*5*5QFT WITH DOUBLE M.S.ANGLE 6FT) FOR RISER OF BOTH SIDE CABLE as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Material Arrange by the contractor on his own cost) |
| 14 | Erection and Grouting of Stay set Completed including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. (All Civil Material & Clamps shall be arranged by contractor on his own cost) | Erection and Grouting of Stay set Completed including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. (All Civil Material & Clamps shall be arranged by contractor on his own cost) |
| 15 | Laying, Sagging and Binding & Jumpring of ACSR Dog Conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. | Laying, Sagging and Binding & Jumpring of ACSR Dog Conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. |
| 16 | Laying, Sagging and Binding & Jumpring of ACSR weasel conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. | Laying, Sagging and Binding & Jumpring of ACSR weasel conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. |
| 17 | Laying of underground D/C 33 KV XLPE Cable 3X300 sqmm by digging of trench 1050 mm, deep, 750 mm wide its boxing with brick,sand after laying of cable separation of cable by brick wall local sand filling and proper levelling& ramming (all civil material shall be arranged by contractor on his own cost) | Laying of underground D/C 33 KV XLPE Cable 3X300 sqmm by digging of trench 1050 mm, deep, 750 mm wide its boxing with brick,sand after laying of cable separation of cable by brick wall local sand filling and proper levelling& ramming (all civil material shall be arranged by contractor on his own cost) |
| 18 | Laying of underground D/C 33 KV 3x300 sq mm with HDPE Pipe by HDD (Trenchless) Method including cable laying (HDPE Pipe will be supplied by the contractor on his own cost) | Laying of underground D/C 33 KV 3x300 sq mm with HDPE Pipe by HDD (Trenchless) Method including cable laying (HDPE Pipe will be supplied by the contractor on his own cost) |
| 19 | Stringing, Sagging, binding and jumpering of AB Cable Size (3x120+1x95+1x16) &(3X95+1X70+1X16) as per RESSPO Norms | Stringing, Sagging, binding and jumpering of AB Cable Size (3x120+1x95+1x16) &(3X95+1X70+1X16) as per RESSPO Norms |
| 20 | Fixing & Commisioning of Earthing Rod Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Fixing & Commisioning of Earthing Rod Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 21 | Fixing & Commisioning of Ms Gaurding Angle with Clamp as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Angle with clamp shall be arranged by contractor on his own cost) | Fixing & Commisioning of Ms Gaurding Angle with Clamp as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Angle with clamp shall be arranged by contractor on his own cost) |
| 22 | Fixing & Commisioning of 33 KV Jointing Kit 3X300 sq mm (Outdoor/Indoor) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Fixing & Commisioning of 33 KV Jointing Kit 3X300 sq mm (Outdoor/Indoor) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 23 | Fixing & Commisioning of Ms Top Channel with clamp as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Channel with clamp shall be arranged by contractor on his own cost) | Fixing & Commisioning of Ms Top Channel with clamp as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Channel with clamp shall be arranged by contractor on his own cost) |
| 24 | Fixing & Commisioning of MS Dropper Channel with clamp as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Channel with clamp shall be arranged by contractor on his own cost) | Fixing & Commisioning of MS Dropper Channel with clamp as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Channel with clamp shall be arranged by contractor on his own cost) |