|
| 1 | COPPER CABLE: Supply, erection, testing and commissioning of IS marked 3 core Copper Cables, Solid Copper conductor up to 6sqmmand balance Stranded Copper, XLPE Insulated, cores laid up, PVC Inner sheathed, Armoured(Glavanised wire for cables up to10x1.5sqmm, 8x2.5sqmm,2x10sqmm,3x10sqmm,4x6sqmmand balance all galvanized steel strip),extruded PVC typeST2OuterSheathed, /1100Vgradeasper IS 7098 (Part 1) 1988 with up to date amendments along with all accessories like thimble lugs etc for motors as per entire satisfaction of Engineer-in-charge complete in all respect. Make: Indian Cables Ltd./ Finolex / Havells/Polycab/RRCables/CAPP/Gloster / Universal / Fort Gloster Industries Ltd./ Asian Cables Corporation Ltd ( Panel to Motor) |
| 2 | WTP: Design and construction of 0.50 MLD capacity automated PLC controlled water treatment plant including providing and laying the DI / CI pipes, specials, sluice valves from inlet chamber of WTP to inter connecting piping network in WTP (The cost of these DI / CI pipes, valves and specials shall also be included in the rates quoted by the contractor) along with inlet chamber, Alum dozing, Flash mixing, Clariflocculator, filter box, over head Reservoir for back wash and waste water tank with suitable size pumping sets and panel boards, air scour equipment, chemical house with chlorination equipments, all other civil, mechanical, electric installations complete in all respects as per specifications (make of Sluice valves / NRV: IVC / VAG / Kirlosker) 0.50 MLD Capacity |
| 3 | NS Item -Panel Board - Supply, erection, testing and commissioning of floor mounted electrical LT Panel board, fabricated from 14 SWG CRCA sheet duly stouten with suitable angle iron framework and completely powder coated of suitable size having following items for Horizontal split casing pump set of suitable for 1 Nos. pumping set 400 LPM with 45 Mtr. Head and 7.50BHP Horizontal split casing pump set and required accessories: -Cost of material as per market rates |
| 4 | RAW WATER PUMP : Supplying, erection, testing and commissioning of horizontal motor pumping set for raw water, IS marked, having capacity 2000 LPM discharge at 15.00 metre head with 15 BHP motor, complete in all respects including pump, motor, base frame, coupling, foundation bolts, alignment, trial run and commissioning as required. |
| 5 | PANEL BOARDS FOR MOTORS : Supplying, erection, testing and commissioning of wall mounted LT electrical panel board for 2 Nos. pumping sets suitable for 2000 LPM discharge at 15.00 metre head with 15 BHP motor (each), fabricated from 16 SWG CRCA sheet, duly strengthened with suitable angle iron frame, complete with powder coating of approved shade and size, comprising of main switch of suitable ampere (make: Larsen and Toubro / Siemens / ABB), CT 100/5 – 2 Nos., digital multifunction meter – 2 Nos., SPP – 2 Nos. of approved make, star-delta motor starter – 2 Nos. (make: LandT / Siemens / ABB), volt selector switch – 2 Nos. and ammeter selector switch – 2 Nos. of approved make, capacitor of suitable KVAR as per site requirement – 2 Nos., indicating lamps – two sets, changeover switch of suitable ampere – 2 Nos., complete with internal wiring, earthing terminals, testing and commissioning as required. |
| 6 | RAW WATER PUMP: Supplying, erection, testing and commissioning of Horizontal split casing motor pumping set for Raw Water having head as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked. 500 LPM X 15.00 M |
| 7 | Operation and maintenance for the complete scope of work covered in the DNIT and existing water works Karor as per operation and maintenance schedule attached in the DNIT in additional document for a period of 6 years after successful completion of 3 months trial run period. (The cost will be charged to the A/ Mtc. Estimate of respective F.Y )Operation and maintenance during 1st year defect liability-cum - Maintenance period |
| 8 | Operation and maintenance during 2nd year defect liability-cum - Maintenance period |
| 9 | Operation and maintenance during 3rd year defect liability-cum - Maintenance period |
| 10 | Operation and maintenance during 4th year defect liability-cum - Maintenance period |
| 11 | Operation and maintenance during 5th year defect liability-cum - Maintenance period |
| 12 | Operation and maintenance during 6th year defect liability-cum - Maintenance period |
| 13 | HSR Itmes Please Enable Macros to View BoQ information |