|
| 1 | Overhauling of hoisting unit ,applying cardium compound and associated works |
| 2 | OD25818/2025-2026:Removing debris and cleaning the shutter grooves and seal tracks & roller tracks. |
| 3 | OD39342/2025-2026:Providing with Temporary Platform (Suspended type) of size 6m X 2.5m, with scaffolding pipe suspension from overhead structure, for the repair works/painting of shutters, hoisting bridges, etc. including the cost of bracing, fittings, handling charges, assembling, dismantling and all safety arrangements complete. |
| 4 | OD25817/2025-2026:Supplying and fixing of MS Bolt and nuts for Hoisting mechanisms, shutter and itsaccessories. |
| 5 | OD25816/2025-2026:Supplying and fixing of SS Bolt and nuts for Hoisting mechanisms, shutter and itsaccessories. |
| 6 | OD25815/2025-2026:Supplying and applying bearing Grease on plummer blocks of hoisting mechanismmanually and on shutter roller wheels using pneumatic grease gun of rope drum operatedvertical shutters after cleaning the bearings properly by using diesel and cotton waste. |
| 7 | OD25814/2025-2026:Supplying and refilling Grade 320 gear oil for worm reducer of rope drum operatedvertical shutters. |
| 8 | OD25813/2025-2026:Supplying and Applying heavy duty semi-fluid adhesive type Grease on gears, Manual operating mechanism chain, pulleys of rope drum operated vertical shutters after cleaning the surfaces properly by using wire brush and Diesel. |
| 9 | OD25812/2025-2026:Supplying and Applying Cardium compound on wire ropes of hoisting mechanism of rope drumoperated vertical shutters. |
| 10 | OD39346/2025-2026:Alignment correction of existing manual operating mechanism by cutting, welding and grinding down the foundation bed size and refixing to the correct alignment with engaging and disengaging mechanism. |
| 11 | OD25811/2025-2026:Correcting alignment and tightening of wire ropes/Chains , Checking andtightening of bolt & Nuts of hoisting unit, viz reduction gear units, pulleys, Plummerblocks, rope drums etc. of rope drum operated shutters. |
| 12 | OD25810/2025-2026:Checking Electromagnetic brake assembly and connection, Cleaning the drum and brake pad and adjusting the brake. |
| 13 | OD25809/2025-2026:Checking electrical control panel, replacing damaged fuses and cleaning the contact points. |
| 14 | OD25808/2025-2026:Conducting trial run of shutters Please Enable Macros to View BoQ information |