| 1 | Excavation for pole above 8.00m length by using JCB/Manual |
| 2 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual |
| 3 | Excavation for pole upto 8.00m length by using JCB/Manual |
| 4 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual |
| 5 | Excavation and erection of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual |
| 6 | Fixing of LT Aluminium Knob |
| 7 | Fixing of LT 3 phase cross arm |
| 8 | Fixing of LT single phase cross arm |
| 9 | Fixing of LT V cross arm |
| 10 | Fixing of 11 KV DISC Insulator |
| 11 | Fixing of Tapping X arm |
| 12 | Erection of LT shackle |
| 13 | Fixing of HT/LT Ti fitting |
| 14 | Fixing of LT Pin Insulator |
| 15 | Pole Concerting |
| 16 | Earthing of poles with GI wire 4 or 6 SWG by coil earthing |
| 17 | Fixing of HT PIN Insulator with pin 11 KV |
| 18 | Dismantling of RCC, REC,PSC poles upto 8.00m length by using Crane/Manual |
| 19 | Dismantling of LT Three phase cross arm |
| 20 | Dismantling of LT single phase cross arm |
| 21 | Dismantling of LT Pin Insulator |
| 22 | Dismantling of LT shackle |
| 23 | Dismantling of LT Aluminium Knob |
| 24 | Slotted holes |
| 25 | Erection of single pole structure including erection of DT complete structure complete with centre support |
| 26 | Loading or unloading of DT upto 250 KVA |
| 27 | Transforting of Distribution Transformer/Line Materials from stores to Office/site |
| 28 | Transforting of 9 mtr poles and other associated materials from road side to pole pit upto 2KM |
| 29 | Loading or unloading of line materials |
| 30 | Loading or unloading of upto 8mt pole |
| 31 | Loading or unloading of above 9 mt pole |
| 32 | Transforting of 8 mtr poles and other associated materials from road side to pole pit upto 2KM |
| 33 | Loading or unloading of DT upto 8 mt pole |
| 34 | Paving and stringing of conductor of 7/3.35mm ACSR for HT |
| 35 | Paving and stringing of conductor of 7/3.35mm ACSR for LT |
| 36 | Paving and stringing of conductor of 7/2.59mm ACSR for HT |
| 37 | Dismantling of conductor of 7/2.09mm ACSR |
| 38 | Slotted holes |
| 39 | Ordinary tree clearence and throne bushes & trees Please Enable Macros to View BoQ information |