|
| 1 | Loading and Unloading of above 8 mt pole |
| 2 | Transporting of poles from road side to pole pit upto 2 KM (9Mtr) |
| 3 | Excavation of pole pit (1.25m * 0.6m*1.83m) of 9m, 9.14m Poles Normal ground |
| 4 | erection of 9m, 9.14m Poles(1.25m * 0.6m*1.83m) |
| 5 | Excavation and erection of stay set of Normal ground |
| 6 | Erection of LT three phase cross arm |
| 7 | Erection of LT single phase cross arm |
| 8 | Erection ofTapping Channel cross Arm 4 1/2' |
| 9 | Fixing of LT Shackle Insulator |
| 10 | Erection of V cross Arm 4 1/2' |
| 11 | Erection of HT / LT TI fitting |
| 12 | Fixing of LT Pin insulator |
| 13 | Fixing of HT Pin Insulator |
| 14 | Erection of 11 KV Single Pole structure including erection of DT complete with centre support ( Data as per Annexure III) |
| 15 | Loading and Unloading of DT Below 250 KVAEach |
| 16 | Erection of transformer Upto 200 KVA |
| 17 | For ordinary. Tree clearence and Throne bushes & trees |
| 18 | Dismantling and reerectionSingle Phase service connection |
| 19 | Dismantling and reerection Three Phase service connection |
| 20 | Dismantling of poles above 8 mtr without concrete in damaged condition including grill separation etc., |
| 21 | Dismantling and reerection of 1 * 40 W tube light erected in complete set (including transport)LED Lamp fitting |
| 22 | Dismantling and reerection of Paving and stringing of conductor of 7/2.59 mm ACSR |
| 23 | Paving and stringing of conductor of 7/2.59 mm ACSR |
| 24 | Paving and stringing of conductor of 7/3.35mm ACSR |
| 25 | Erection of Fixing of Street light switching point arrangement (meter) |
| 26 | Erection of Guarding cross arm Please Enable Macros to View BoQ information |