| 1 | Dismantling and disposal of existing sliding windows including removal of channels and glass and minor surface patch repairs with putty .. Etc. All tools, plants, labour and materials etc. complete. |
| 2 | Dismantling existing aluminium sliding windows, providing and fixing fixed type alluminium windows with 5mm thick plane sheet glass .. Etc. complete. All tools, plants, labour an materials etc. complete. |
| 3 | Providing & fixing in position anodised aluminium sliding windows of approved manufacturer to suit two track sliding, using best quality standard extruded anodised aluminium sections (manufactured to relevant I.S. specification) without horizontal glazing bars, glazed with 5.5.mm thick sheet glass fixing to RCC column/masonry with lugs of 16mm x 3.15mm x 10cm long or any other approved size embedded in C.C. (1:3:6) blocks of appropriate size incl. necessary bolting devices, handles, locking arrangements, fixing clips, metal putty, PVC/Rubber beading etc. All tool, plants, labour, material, etc. complete. |
| 4 | Supplying & erecting in position structural steel work in single section incl. Cutting, hoisting, fixing in position and cleaning the surface, painting two coats of approved quality synthetic enamel paint of approved colour/ shade over a coat of red oxide zinc chromite primer etc. including for making gate of required size, hinges, locking arrangement from both side etc. All labour & materials tools & plant etc. complete. |
| 5 | Providing and fixing galvalume profile sheets 0.45mm thick of approved make/ brand in roofing including fixing sheets with self tapping GI screws of required dia and length, with necessary washers etc. All tools, plants, labour and materials, scaffolding etc. complete. |
| 6 | Providing & fixing M.S. anchor bolts with 12mm dia M.S. bars, 80mm long with nuts & washer embedded 50mm into the roof slab including cutting, fixing in position etc. All labour & materials, tools & plants etc. complete. |
| 7 | Providing & fixing ornamental grills of approved pattern using M.S. flat 25 x 3mm or any other sections including grill gate of required size 4 nos, welding, grinding, cutting, drilling holes, fixing with counter sunk screws etc. All labour & materials etc. |
| 8 | Covering gap between RCC column through galvalume sheet roofing with Providing and fixing APP sheet 3mm thick over roof to prevent water leakages etc. All tools, plants, labour and materials etc. complete. projecting 20cm above roof on column surface and covering minimum 30cm on galvalume sheets or as instructed by department including cleaning the surface etc. fixing to RCC column and galvalume sheets etc. All tools, plants, labour and materials etc. complete. |
| 9 | Credit to MPA: Clearing and taking away the dismantled scrap material from site, including all labour, transport etc. ( credit qty= item no 2 +3)=55 m2 Please Enable Macros to View BoQ information |