| 1 | Dismantling the RCC below the ground level and clearing away the dismantled materials away from the site including the cost of all labour, transportation, loading, unloading, lead, lift, T&P etc complete. |
| 2 | Completely removing the existing worn-out tarfelt in two layers over the existing terrace and clearing the debries including the cost of all materials, lead, lift labour., complete. |
| 3 | Chipping the wall plastering and clearing the debries away from the site including the cost of all T& P, lead, lift, labour, etc., complete. |
| 4 | Completely removing the existing tile and bed mortar in terrace and clearing the debries including the cost of all materials, lead, lift labour., complete. |
| 5 | Strengthening brick jelly concrete by adding lime powder mixed with jaggery and kaduka water well beaten with wooden beaters including the cost of all materials, lead, lift,labour etc., complete |
| 6 | Supplying and laying 9\\"X9\\" pressed clay tiles to requied slope over the bed mortar 1:3 mixing with integral water proofing compound and duly pointing the tile joints with with CM mixed with seived sand and integral water proofing compound including the cost of all materials, lead, lift, labour., complete. |
| 7 | Supplying and applying acrylic polymer modified mortar over the damaged tile surfaces including the cost of all materials, lead, lift, labour, etc, complete. |
| 8 | Supplying and applying two coats of elastromeric coating using ISI water proofing chemical FORSROC or equivalent over the fiber mesh of 45 GSM on top of the terrace tile surface including the cost of all materials, labour, lift , lead etc., complete. |
| 9 | Providing scaffolding for outer walls of the building to secure the applicators working on top using casurina props including the cost of all materials, labour, lead, lift, T&P, transport., etc complete. |
| 10 | Providing water proof plastering using acrylic polymer modified mortar in cm 1;3 to the damaged RCC items/ walls to a thickness upto 20 mm mixed with SBR LATEX or equivalent @ 1 litre/4.50m2 as directed by Engineers at site including cost of all materials, labour, lead, lift etc complete. |
| 11 | IGST Please Enable Macros to View BoQ information |