|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing andramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring |
| 3 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete asper direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(a) Depth upto 1.5 m. |
| 4 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete asper direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge)(b) For additional depth beyond 1.5 m. and upto 3.00 m |
| 5 | Hire and labour charges for 100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other approved timber posts each 2.0 m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8 m over pacca road without damaging the surface and tying strongly 3 (three) rows of bamboo railing on each leg and 1 (one) railing connecting all the pivot junctions including cost of loading unloading, stacking & carriage of all materials and labour complete, and maintaining barricading for a period beyond 5 (five) days after the reported & recorded time of completion of the entire work to the satisfaction of Engineer-in- Charge. (Note: This work should not be executed without specific permission of Superintending Engineer). (100 mm. dia bamboo railing & 150mm. dia Jhau/Eucalyptus/other approved timber posts @ 1.80m apart). (ii) Railing 3 row on each leg and 1 at pivot point. |
| 6 | Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) (ix) 100 mm dia. medium quality |
| 7 | Labour for jointing and lowering G.I. or E.R.W. M.S. pipes including strainer within the tube well bore vertically with necessary sockets, special fittings and welding as required including cost of all jointing materials, hire charges of tools and plants, cutting pipes to required sizes, making threads, welding pieces together etc. as necessary as per direction of the Engineer-in-charge. (i) Upto 100 mm dia. pipe |
| 8 | Supplying, fitting and fixing Peet's valve fullway gunmetal standard pattern best quality of approved brand bearing I.S.I. marking with fittings (tested to 21 kg per sq. cm.). (i) 100 mm dia |
| 9 | Labour for fitting and fixing G.I. pipes for under ground work including cost of jointing materials, cutting pipes,making threads etc. complete in all respect including cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting to G.I. pipes and specials with bituminous paint. (Payment will be made on the centre line measurement of the total pipeline including specials. Payment of painting to be paid seperately.) (ix) 100 mm dia. |
| 10 | E. R. W. MS BLACK PIPE 8.15 Sypply of E.R.W.M.S. (Electrical Resistant Welded M.S.) black pipe of ISI Mark as per relevent IS Specification ( heavy quality ) having wall thickness not less than 5 mm. [N.B.: The rates for supply of TATA Make pipe will be arrived at by adding 20% of the corresponding rates ] Diameter in mm (Internal)150 |
| 11 | Labour for jointing and lowering G.I. or E.R.W. M.S. pipes including strainer within the tube well bore vertically with necessary sockets, special fittings and welding as required including cost of all jointing materials, hire charges of tools and plants, cutting pipes to required sizes, making threads, welding pieces together etc. as necessary as per direction of the Engineer-in-charge. (ii) Above 100 mm dia. and upto 200 mm dia. pipe |
| 12 | Cutting of Single bit/Double bits of socket of rubber gasket jointed C.I/D.Isocket & spigot pipes without damaging any portion of the pipe end making the pipe free from all broken pieces as per direction of the Engineerin-Charge.Diameter in mm 150mm dia. |
| 13 | Supplying, fitting and fixing of D.I. Mechanical flexible Flange Socket Tailpiece suitable for making flanged connection with the plain barrel of C.I. Spun Pipes (as per IS : 1536) and D.I. Pipes (as per IS : 8329). The Tailpieces to be supplied complete with Sealing Rubber Gasket of EPDM quality (IS:5382/1985 Type-4), Cast Iron Follower Glands and Mild Steel Nut Bolts(Zinc Coated) . The whole assembly should be mechanically and hydraulically tested to the provisions as laid down in IS: 1538. Fitting and fixing should be in proper position with proper care of main pipe line forleak proof condition. Diameter in mm. with minimum length of Barrel Pipe in mm. 150mm with length 100mm |
| 14 | Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper larification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor] |
| 15 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. |
| 16 | Hire charges of moveable type mounted earth excavator having minimum cutter size (1.0 cubic meter) & loader size (2.0 meter length x 0.75m width) for cutting & removal of any kind of soil, spoli etc. including cost of fuel, lubricants & manpower etc. in Water Supply Works. [ This item will be operated on prior permission from the concerned SE/Dy. Chief Engineer] For minimum Engagement of 8 hrs. In a day |
| 17 | Sub Total |
| 18 | GST 9% |
| 19 | GST 9% |
| 20 | CESS 1% Please Enable Macros to View BoQ information |